Loading…
Loading…
2,037 results • Best match
LED Luminaire (Recessed Luminaire) (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2024/B/5765269 Dated : 31-12-2024 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6392132 Dated : 27-06-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6392289 Dated : 27-06-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6576616 Dated : 18-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Self Ballasted LED Lamps for General Lighting Service as per IS - 16102 (Q2), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7157146 Dated : 28-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6391822 Dated : 27-06-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6786782 Dated : 13-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 1649790 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7140615 Dated : 27-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 799578 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED light for three dimension 20 watts/24 volts AC/DC. high pressure die casting powder coated with poly carbonate cover. high power with lumen LED. LED colour temperature 5500K to 6500K CRI>70. THD10%.LED lumen 120 to 140 lumen per wattts. luminiaries total lumen up to 2400 lumen . with indusatrial grade LED driver input voltage 24 volts AC/DC.
1. Replacement of conventional fittings with energy efficient LED fittings at RCOF, Kannamangala Cross, white field, Hoskote Road Bangalore. 2. Providing conventional fire alarm system and fire fighting system with downcomer at RCOF, Kannamangala cross, white field , Hoskote road, Bangalore. 3. Replacement of submersible pumpsets servicing/ repair of AC units, dehydration and Top up pf Transformer, providing warter softner plant and replacement fo burnt out UG cable at RCOF Kannamangala Cross white field Hoskote Road Bangalore.
Supply of LED high bay Light., Supply of batten type LED Tube light with inbuilt driver, Supply of LED street light with integral driver.
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6600991 Dated : 02-09-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6852710 Dated : 04-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6792609 Dated : 21-10-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 1435830 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6741178 Dated : 13-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6389973 Dated : 27-06-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6390074 Dated : 27-06-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Improvements to internal and external lighting. Rewiring to Godown no.1,2 Ancillary buildings including replacement of switchgears, conversion of conventional fittings to LED fittings and replacement of damaged UG cabling.
Annual repairs and maintenance of Electrical installations at FSD Koppal for the year 2020-21 Sub Head Conversion of conventional fittings to LED fittings and replacement of damaged UG cabling
electrification And repair of LED light fan replacement street lights replacement repair of air conditioners and repair and maintenance of four generators for the Dharwad Public Works of Chief Engineers Office, Superintendent Engineers Office Divisional Office and Dharwad Circuit House Channam IB and supply of human resources to the Electricity Sub-Division Office of the Public Works Department For the year 2025-26(CAT-SC)
LED Luminaire (For Road and Street Lights) Experience with Gov. Required 3 Year (s) LED Luminaire (For Road And Street Lights) ( 520 ) Technical Specifications Specification Specification Name Values Allowed Values STANDARDS LED Luminaire conformity ... of LED Luminaire as ... each LED luminaire unit ... N/A LED Luminaire for ...
PVC Flat Cable, Aluminium Conductor with PVC Insulation and Sheath as per IS 694 (Q3), LED Bulb with Battery as per IS 16102 (Q3), Switch Fuse Unit (Q3), LED Bulkhead Light (Q3), HT Tape (Q3) (3 (3 ))
LED Luminaire (for Flood Light) LED Luminaire (for Flood Light) ( 15 ) Technical Specifications Specification Specification Name Values Allowed Values STANDARDS LED Luminaire conformity to IS:10322/Part 5/Section 5/2012 latest and IS: 16107 (Part ... of LED Luminaire as ... each LED luminaire unit ... - LED Luminaire for ...
Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7066594 Dated : 05-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 415498.65 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Providing LED Lights, Timer machine, Separate Street light electric line and related works to Electrical poles in 1. 1st ward 2) 2nd ward 3) 3rd ward 4)4th ward 5)6th ward 6)7th ward 7)8th ward 8)9th ward 9)10th ward 10) 11th ward 11)14th ward 12) 15th ward 13)16th ward 14)17th ward 15)18th ward 16)19th ward 17)23rd ward SC colonies ward in Huvinahadagali Town(RESERVED FOR CATEGORY 2(A))
Providing LED Lights, Timer machine, Separate Street light electric line and related works to Electrical poles in 1. K Veerapura-12, 2. Hirebannimatti-37, 3.Byalahunasi-23, 4. Makarabbi-39, 5.Kattebennuru-92, 6.Tumbinakere-18, 7.K.Ayyanhalli-81, 8. Kalasapura-12, 9. Dasanahalli-27, 10.Navali-42, 11. Beerabbi-30, 12. Angoor-14, 13.Magala-107, 14. Magala SC colonies-28, 18. Naduvinahalli-19, 19. Linganayakanahalli-12, 20. Gungaragatti-03, 21. Sovenahalli-39 villages in Huvinahadagali Taluk
Providing LED Lights to Electrical poles in 1. 6th ward SC colony-20, 2. 7th ward SC colony-15, 3. 9th ward SC colony -20, 4. 10th ward SC colony-27, 5.11th ward SC colony-10, 6. 15th ward SC colony-15, 7. 17th ward SC colony-34, 8. 18th ward SC colony-11, 9. 19th ward SC colony -10, 10. 23rd ward SC colony-10, wards in Huvinahadagali city(HOA KKRDB FOR THE YEAR 2024-25))
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6502857 Dated : 29-07-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 160000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6867737 Dated : 07-11-2025 Bid Document 1/8 Number of Auto Extension count 2 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Construction of Training cum Hostel Block of Canara Bank at Bagalur, Bangalore (Balance Work). SH: Providing Internal Electrical Installation, LED fittings and fans, IP-PBX LAN and Wi-Fi System. VRF AC System, CCTV, Modular Online UPS System, RO Plant, Audio Video System, Video Conferencing System, Stage lighting & stage Drapery System for Auditorium, Access Control System. SH: 2 : Providing Internal wood partitions and doors, Compressed wooden flooring, wall panelling, Modular work stations, furniture and wardrobes racks and other miscellaneous interior works.
Switch 6A, Socket 6A, Top 6A, Switch 16A, Socket 16A, Top16A, Step Regulator, Angle Batten Holders, Pendant Holders Adapters, Casing Caping 25mm, Casing Caping SquareGang boxes, Flexible pipe 1, PVC conduit pipe 192mm, Fan Ceiling 48, Fan Wall ... Mm, Led Bulb 7W, ... 7W, Led Bulb 18w, ... 18w, Led Bulb 30W, ... 120W, LED FLOOD LIGHTS 100 ... W, LED FLOOD LIGHTS 200 ...
Electrocardiograph single channel, Emergency Lights with UPS source, Mobile Examination Lamp, X-Ray film illuminator slim with LED light, Installation of Equipment
SPECIAL REPAIRS REPLACEMENT OF NORMAL LIGHTS CFL LIGHTS OLD LIGHT FITTINGS TO LED LIGHT FITTINGS AT ASTE UNDER GE AF MARATHAHALLI BANGALORE
PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as per IS 694 (Q2), PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2), Elecric ... (Q3), LED Luminaire for ... (Q3), LED Luminaire for ... (Q3), LED Batten (Q2), ...
Self Ballasted LED Lamps for General Lighting Services (V2) Conforming to IS 16102 (Q2), LED Batten (Q2), LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3), Piano Type Non Modular Electrical Switch Socket Combination as per IS 3854 and IS 1293 (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), PVC Copper Cable Single Core and Multi Core Circular Sheathed Cord with Flexible Conductor (V2) as per IS 694 (Q2), Piano Type Modular Domestic Fan Regulator as per IS 11037 (Q3), Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3) (3 (3 ))
LED Street Light fitting 120 W toughened glass IP 66 Lumen not less then 110 LPW, LED Light fitting 4 Ft Long 20W OR 22W lumens 100 LPM, LED Street Light fitting 70 OR 72W toughened glass IP 66 Lumen not less then 110 LPW, LED Recessed Light fitting ... XLPE, LED Flood Light fitting ... LPW, LED flood light fitting ... XLPE, LED flood light fitting150W ... core, LED tube light ... C, LED Bulb 15W, ... C, LED Bulb 23W, ... 6Amp, LED Bulb 5W, ... 1100V, LED Bulb 12W, ...
Installation of LED lights on street lamp posts near Talavara house near Buruda house near Nayak house near Dalawayi house and near Bisanal house in the Rabakavi Banahatti ULB limit
Self Ballasted LED Lamps for General Lighting Services (V2) Conforming to IS 16102 (Q2), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3), LED Tube ... (Q2), LED Luminaire (Recessed ...
PVC Insulated Copper Cable Single and Multi - Core Circular Sheathed Cable with Flexible Conductor (V2) as per IS 694 (Q2), LED Luminaire (for Road and Street Lights) as per IS 10322, IS 16107, IS 16108, IS 16103, IS 10322 (Q3), LED Luminaire (for ... (Q3), LED Batten (Q2), ... (Q2), LED Luminaire (Recessed ...
Helmet Mounted LED Light or Helmet Parts or Accessories (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6808966 Dated : 19-10-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6685439 Dated : 15-09-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 94080 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 60 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/9 Beneficiary : Sr. Divisional Finance Manager Second Floor, DRM office Compelx, Irwin Road, S W Railway, MYSURU Karnataka 570 001 (Sr.dfm/mys) Splitting
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Providing LED fittings and other electrical works for entrance canopy main lobby and front parking area at Sanchar complex WMS compound Jayanagar Bengaluru; Electrical S..
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6764914 Dated : 08-10-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Self Ballasted LED Lamps for General Lighting Services (V2) Conforming to IS 16102 (Q2), LED Batten (Q2), LED Luminaire (for Road and Street Lights) as per IS 10322, IS 16107, IS 16108, IS 16103, IS 10322 (Q3), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2), Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Electrical Plugs (V2) ISI Marked to IS 1293 (Q2), Non - Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3), Piano Type Non Modular Electrical Switch Socket Combination as per IS 3854 and IS 1293 (Q3)
Providing LED Lights, Timer machine, Separate Street light electric line and related works to Electrical poles in 1. 1st ward-26, 2. 2nd ward-39, 3. 3rd ward-17, 4. 4th ward-18, 5. 5th ward-37, 6th ward -39, 7. 7th ward-80, 8. 8th ward-52, 9. 9th ward-99, 10. 10th ward-105, 11.11 th ward-23, 12.12th ward-12, 13.13th ward-12, 14.14th ward ward-13, 15th ward-43, 16.20th ward-20 wards in Huvinahadagali City(HOA KKRDB FOR THE YEAR 2024-25)
Item# 2: LED STREET LIGHT FIXTURE (Q3), Item# 3: LED HIGHBAY FIXTURE (Q3), Item# 4: R-TYPE THERMOCOUPLE COMPENSATING CA (Q3), Item# 1: LED TUBE LIGHT OF 1* 20W (Q3)
Annual repairs and maintenance of Electrical installations at FSD Belgaum for the year 2020-21 SH Replacement of damaged LED fittings and UG cable, providing service connection to new LWB cabin and improvement to earthing systems.
Piano Type Modular Domestic Electrical sockets - IS 1293 (Q3), Heating Element (BHEL) (Q3), DOL starter (Q3), Piano Type Modular Domestic Fan Regulator as per IS 11037 (Q3), Modular Piano Type Domestic Electrical Switches as per IS 3854 (Q3), Fixed ... WATT LED FITTING , ... WATT LED FITTING , ... WATT LED FITTING , ... WATT LED FITTING , ... WATT LED FITTING , ... WATT LED FITTING , ... WATT LED FITTING , ...
LED Bulkhead Light (Q3), LED Luminaire (Recessed Luminaire) (V3) Conforming to IS 10322 (Part 5/Section 2) (Q3), Self Ballasted LED Lamps for General Lighting Services (V2) Conforming to IS 16102 (Q2), LED Garden Light (V2) (Q2) (3 (3 ))