Loading…
Loading…
1,443 results • Best match
Providing LED Street lights arrangements to the ROB LC No.37 Anvarthikanpettai bridge and approach road at Anvarthikanpettai in Ranipet District
Providing New 25 Watts LED lights LED Street lights with EB Pole and EB Line at Municipal areas in Vellakovil Municipality
Providing of New 20w LED Street Lights fittings alone, fitting with line, and New EB Pole including E.B.Line in Colachel Municiplity.
Supply and fixing of additional 9 Nos of 120watts LED street light fittings and 7 Nos of 72watts LED street light fittings with supply fabrication and fixing of suitable fixture clamp arrangements in yard area and around fencing area at Aliyar
Supply and fixing of additional 9Nos of 120watts LED street light fittings and 7 Nos of 72watts LED street light fittings with supply fabrication and fixing of suitable fixture clamp arrangements in switch yard area and around fencing area at Aliyar
Supply and fixing of new LED Street light in ward 1 to 18 in Mamsapuram Town panchayat.
WHITE-LED BASED SOLAR STREET LIGHTING SYSTEM (Q3), Led Street Light (Q3), Online Ups-IS:9000 (Q3)
Supply of 20W LED Street lights 310 in number with fitting at ward no 1,2,3,5,7,8,11,13,14,15 in various places in Kannankurichi Town Panchayat
Providing of New 20W LED Street Lights fittings alone, fitting with line, and New EB Pole including EB Line in Tirumangalam Municiplity.
Solar Street Light Luminaire (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Solar Street Light Luminaire (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Solar Street Light Luminaire (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
LED Batten (Q2), LED Luminaire (for Road and Street Lights) as per IS 10322, IS 16107, IS 16108, IS 16103, IS 10322 (Q3)
Solar Street Light Luminaire (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Solar Street Light Luminaire (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
Supply and fixing of 90 W LED Street Light fitting with 10Metre Single Bracket Pole in 40 places
Providing New 25 Watts LED lights LED Street lights with EB Line at Ward No. 1 to 21 Municipal areas in Vellakovil Municipality
Supply and Fixing of 40 W LED Street Lights 9 Nos at W.No.15 Thirumangalam Main Street in Avalpoondurai Town Panchayat,Erode District.
Conversion of Existing Street Lights to Energy Saving LED Street Light Fitting in the Existing poles at Kottakuppam Municipality
Supply, Delivery and Fixing of 20,40,60 Watts LED Street Light Fitting and Street Light with Line in Municipal Areas
Conversion of existing street lights to Energy Saving LED Street Light Fittings in the existing poles at Komarapalayam Municipality.
Conversion of Existing Street light lamps to energy saving LED street Light fitting in the Existing poles at Padmanabapuram Municpality
Conversion of Existing Street light lamps to energy saving LED street Light fitting in the Existing poles at Colachel Municpality
ANGANWADI STUDENT UNIFORM, HANDWASH STATION, OFFICE TABLE, REVOLVING CHAIR, ANGANWADI STUDENTSCHOOL BAG, SOLAR LED STREET LIGHT BOQ Title BOQ BOQ
WHITE-LED BASED SOLAR STREET LIGHTING SYSTEM (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6550946 Dated : 08-08-2025 Bid Document 1/6 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing New 25 Watts LED lights LED Street lights with EB Pole and EB Line at Ward No.1 to 21 Municipal areas in Vellakovil Municipality
PROVIDED 20 NOS OF 9.5 MTR. STREET LAMP POST WITH 2.0 MTR STRAIGHT SINGLE BRACKET WITH 150W LED STREET LIGHT FITTING AT CPCL NAGAR BURIAL GROUND ROAD AND 6 NOS OF 7 MTR OF LAMP POST WITH 1 MTR SINGLE STRAIGHT BRACKET WITH 48W LED STREET LIGHT FITTING
Supply and Fixing of 20 W LED Street Light at Ward no.1 to 15 (420 Nos) in Kariapatti Town Panchayat
Providing of new street light pole with LED street light fittings to various locations in ward no 38 of west zone.
Supply and Fixing of 20W LED and 40W LED Street Light at Ward no.1 to 15 in Mallankinaru Town Panchayat.
100W LED Flood Light Luminaire, 200W LED Highbay Luminaire, 45W PHILIPS LED STREET LIGHT-BRP331 LED5, 20W 4 Ft LED Batten
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6801816 Dated : 17-10-2025 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 4, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6716750 Dated : 23-09-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 4, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6910598 Dated : 24-11-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Led Luminaire (For Flood Light)-IS:10322, IS:16107 (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3)
R O 25liter, M S DUSTBIN, HANDWASH STATION, R O 18liter, WATER CAN, GARBAGE VEHICLE, SANITIZER BOTTEL, CHLORINE DOSING PUMP, SOLAR STREET LIGHT, LED STREET LIGHT 36watt, LED STREET LIGHT 18watt, Air walker, cycle, leg press, single wheel shoulder builder, slider, magic car, tent house, see saw, solar mini high mast
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6360979 Dated : 26-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6358947 Dated : 19-06-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 7, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6580690 Dated : 23-08-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6490369 Dated : 30-07-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6504368 Dated : 01-08-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for High Bay Lighting (Q3), Led Luminaire (For Road And Street Lights)-IS:10322, IS: 16107, IS:16108, IS: 16103, IS:10322 (Q3), Led Flood Light (Q3)
Supply and fixing of 90 W LED Street Light fitting with 8Metre Single Bracket Pole in 28 places in Ponnampatti Town PanchayatThiruchirappalli District.
Miniature Circuit Breakers-IS 60898-1:2002, Led Street Light, Light Emitting Diode LED Fixture- LED tube light Experience Criteria 1 Year (s)
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6563675 Dated : 13-08-2025 Bid Document 1/7 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6892284 Dated : 14-11-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6892377 Dated : 14-11-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6891676 Dated : 14-11-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6891863 Dated : 14-11-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No