Loading…
Loading…
14,069 results • Best match
Handrail belt for Escalator - BLACK Colour for repairing/supplying and fixing the handrail belt for both the side of Escalator E-5881 in FOB of PF No. 1 at Thanjavur Railway Station.Make/Brand - Johns
Design manufacture supply installation integration testing and commissioning of power supply and traction electrical and mechanical and lifts and escalators including 5 years of CM after 2 years of DLMP for MML4 and 4A of MMRP of MMRDA
Dewar Elevator control board, Max Power Supply (P5)
SITC of Elevator at Mega Hostel Tower EVEREST
ELEVATOR DEFLECTION VERIFICATION TEMPLATE, FLAPPERON DEFLECTION VERIFICATION TEMPLATE
Comprehensive maintenance of Escalators installed at Kashmere Gate, Delhi
ELEVATOR BUCKET, 20x8x8 1/2in AS PER DWG: TS/M/P-251
Replacement of existing four numbers Escalators at Terminal Building in Calicut International Airport
Mid term rehabilitation of 02 nos. Escalators (AAL-Canny make) at Ajmer Station.
Spares for PJBF Chain Bucket Elevator Bucket Part No.7, Spares for PJBF Chain Bucket Elevator Connecting Link Part No.2, Spares for PJBF Chain Bucket Elevator Chain Link Part No.3, Spares for PJBF Chain Bucket Elevator Chain Pin Part No.5, Spares for ... Bucket Elevator Bracket
SBR Black Open Loop Handrail Suitable for V- type profile for KONE Make Escalator Make: Semprit, Splicing Kit Suitable for V- type profile for KONE Make Escalator, Make: Semprit, EHC, SKG & Shangh
COMPREHENSIVE MAINTENANCE OF 08 NOS. LIFTS INSTALLED AT MULTI LEVEL PARKING, SECTOR-17, CHANDIGARH FOR THE PERIOD 2024-2027.
Customized AMC/CMC for Pre-owned Products - Comprehensive Annual Maintenance of 06 Lifts at DOO C and S Kolkata; TK Elevator; Comprehensive Maintenance Contract (CMC); As per Scope of Work; No
Elevator works
REPAIR/ROUTINE MAINT OF 12 NOS ELECTRIC LIFTS MAKE THYSSENKRUPP ELEVATOR) OF G 14 STOREY BUILDING AND MANNING AND OPERATION OF ELECTRIC LIFTS ANY MAKE AND CAPACITY IN G PL14 STOREY BUILDINGS IN R-20 R 23 R28 R29 R36 R37 R38 R39 200 SAILORS R 41
TWIN CAR ELEVATOR POST SUPPLY FITTING COMISSIONING
Deployment Of Personnel And Providing Services for Operations, Maintenance and Management of Security , Sanitation, Cleaning, Water supply, Sewerage System, Street Lights, Lifts/Elevators etc. For Atal Ashray Affordable Housing Scheme Nabibag,Bhopal
Operation and Maintenance of Elevators Lifts 12 Nos. system installed at Crystal IT Park Indore (SEZ) for the period of 3 years (36 Months) round the clock i/c Sunday and Holiday
Supply of elevator with accessories for BMB-Panki, Erection commissioning installation start-up and trial run of elevator at BMB-Panki, Spares supply for Elevator of BMB-Panki, Elevator supply for Panki GDS building, Erection commissioning ... of elevator at ... for Elevator of
Table Top Elevator Writing Desk (Q3)
Supply and erection of Pneumatic elevator
Universal make Chimney Elevator spares (Q3)
Table Top Elevator Writing Desk (Q3)
Table Top Elevator Writing Desk (Q3)
Providing Internal Elevator at Ponnani Lighthouse
Table Top Elevator Writing Desk (Q3)
Table Top Elevator Writing Desk (Q3)
Table Top Elevator Writing Desk (Q3)
Spares for PJBF Chain Bucket Elevator
Table Top Elevator Writing Desk (Q3)
MRL Passenger Elevator at SSHH (Q3)
PROCUREMENT OF BUCKET FOR UREA ELEVATOR
Supplying elevator for M C Sillod
Box Wrapping Machine With elevator (Q3)
SUPPLY OF SPARES OF DCU ELEVATOR
Fabrication and Supply of Elevator Buckets
Table Top Elevator Writing Desk (Q3)
BOX WRAPPING MACHINE WITH ELEVATOR (Q3)
Spares for Preheater OTIS Elevator machine
LIFE LINE ENGINEERING Freer Periosteal Elevator
Comprehensive maintenance of goods passenger elevator
15 Passenger cum stretcher elevator work
PROCUREMENT OF BUCKET FOR UREA ELEVATOR
Gearboxes for Agitator and Bucket Elevator
Supply of Elevator for Mahagenco Bhusawal
LIFE LINE ENGINEERING Freer Periosteal Elevator
Table Top Elevator Writing Desk (Q3)
Elevator Belt Without Buckets 595-347986