Loading…
Loading…
6,514 results • Best match
Repair of pumping machinery of existing Tubewell and Booster and all other works contingent thereto For One Year Under Sub Division Panchkula
Repair of pumping machinery of existing Tubewell and Booster and all other works contingent thereto For One Year Under Sub Division Kalka
Repair of Pumping Machinery of existing tubewells canal based water works, Boosting Stations for 1 year and all other works contingent thereto
Dhingsara assured raw water arrangement at water supply scheme Kirdhan and Dhingsara constrcution of sump well , pumping machinery, rising main , distribution system
Mtc of Pumping Machinery 94 Nos. existing T.Wells under PHESD No. 2 Loharu under the Public Health Engineering Division No. 1 Bhiwani
Repair of pumping machinery of existing 14 No. tubewells and all other works contingent thereto under PHE Sub Division No.1 Kurukshetra
Jagadhri Rural various villages - Annual Maintenance Water Supply Scheme. Repair of pumping machinery of existing tubewells and all other works contingent thererto.
Goods Transport Service – Per Trip based Service - Household/Office, Textile Goods, Machinery & Equipment, Dangerous/Hazardous, Fragile; Containerized Truck; 24 FT Single Axle()
Goods Transport Service – Per Trip based Service - Household/Office, Textile Goods, Machinery & Equipment, Dangerous/Hazardous, Fragile; Containerized Truck; 24 FT Single Axle()
Repair of pumping machinery of existing tubewell and Booster and all other works contingent thereto For One Year Under Sub Division Panchkula
Annual maintenance of pumping machinery and operation of disposal at sector 64 Sonipat and repair of rising main line under SMDA Sonipat.
Installation of 2 Nos. deep tubewell with pumping machinery, DI Rising Main 150mm, construction of pump chamber and construction of boundary wall.
Repair of Pumping Machinery of various tubewells water works Boosting stations for village Dhana Kakrala Bhojawas Kalwari Bewal Jhigawan and Sundrah Year
Repairing of all pumping machinery of various SBS and tubewell in Various Villages under IBS Chhapera and all other works contingent thereto
Operation and maintenance of street lights including ON/OFF with cost of material/machinery required in Zone-1 MC Pataudi Jatauli Mandi
Hiring of DG Sets for Operation of Pumping Machinery During the Rainy Season under the Jurisdiction of Sub Division No. 2, Hisar.
Construction of 1 No. Pump Chamber, Const. of Boundary Wall, Prov. and Installation of Pumping Machinery and all other works contingents thereto
Bajada Pahari Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Bajada Pahari by DTH Rig Method
Screw Compressor (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6944324 Dated : 28-11-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 441600 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
ARC for operation of lifts (Johnson make) installed (02 nos. at Boiler area and 02 nos. at Service Building) at DCRTPP, Yamuna Nagar for the period of 02 years.
Annual Running Contract for Thermal Insulation works pertaining to turbine, boiler and its auxiliary of 2x600 MW, Unit I and II, RGTPP Khedar, Hisar for the year 2021-2023
Work of servicing and in-situ seat cutting of boiler safety valves installed in Unit-II, RGTPP during forthcoming overhauling of 600 MW Unit-II, RGTPP, HPGCL, Khedar, Hisar.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - CRN Rate Contract for Painting of Boiler Structure and Supports of U#1; As per Documents; As per Documents
Supply, Installation, Testing and Commissioning of Energy Monitoring System at GAIL, Chhainsa
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6458947 Dated : 24-07-2025 Bid Document 1/10 Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 22300 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 37 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : GAIL (India) Limited NOIDA, GAIL India Limited, GAIL India Limited, Ministry of Petroleum and Natural Gas (Vinod Kumar Bhat, Manager) 2/10 Splitting
HIGH-PRESSURE AIR OPERATED SEALANT HYPER GUN, VALVE PURGE CLEANER OR LUBRICANTS VLV LUB OR CLNR, Valve SEALANT EQ TO BTR PART NO SHK0C7V QG, VALVE SEALANT EQ TO BTR PART NO SHF0C3V QG, HIGH POTENCY CLEANER GRADE C IN 20 KG OR 25 LITERS
Facility Management Services - LumpSum Based - Industrial; Horticulture Services; Consumables to be provided by service provider (inclusive in contract cost)
Custom Bid for Services - TOTAL CHARGES FOR AMC OF HVAC SYSTEMS AND SPLIT ACS AT GAIL CHHAINSA AS PER ITEMS AND QUANTITIES MENTIONED IN ATTACHED PRICE BREAKUP FORMAT Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for Precision Air Conditioners Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
50 KW E-Motor Durability test bed and Environment test chamber (C4B), C4-C E-Motor Test Bench for 2W/3W applications, C4-A E-motor test bench with environmental chamber and gearbox- 350 KW, C4-D E-motor test bed for durability test with Climatic Chamber
PHESD Hansi Ch.to A Mtc. of various water supply scheme under PHED Hansi for 12 months 01.04.2025 to 31.03.2026
Old water works mor patti booster gaibi sahib booster Gandhi Nagar Booster Gurthali 2nd water works
MPS Patiala Road Main Disposal Subzi mandi Hari Nagar Court Road Storm water Disposal
Ambersar Dhakal Sinsar Singhwal Hatho Bhana Barhaman Gurusar Surja Khera Bidhrana and Nepewala
Belarkha Mohal Khera Kalwan Ismailpur Harnampura Dharodi Dhamtan Sahib Kharal Hamirgarh Loan Ujhana
Civil Hospital Booster Mini Secreteriate Booster Govt College ITI Boostr PWD Rest Hous Gran Market
Dablain Nehra Rajgarh Dhobi Khanpur Lohchab Julhera Frain Kalan Sulhera Amargarh etc
Badanpur Badowala bhikhewala Danoda Kalan Danoda Khurd Jajanwala MS Pura Sacha Khera Karamgarh
Custom Bid for Services - CRN4585 Two year maintenance contract of Widson make 01 jaw crushers, 01 roller crusher, 02 coal pulverisers at Chemistry coal testing laboratory APCPL Jhajjar Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Goods Transport Service – Per KM Based Service - House hold/Office Food Grains, Machinery and Equipment Truck 7 to 9 Ton; Open Body Taurus; 16 FT Truck, Goods Transport Service – Per KM Based Service - House hold/Office, Food Grains, Machinery and Equipment, Truck 15 to 18 Ton; Open Body Taurus; 21 FT Truck
Goods Transport Service – Per KM Based Service - House Hold/Office Food Grains, Machinery and Equipment Truck 7 to 9 Ton; Open Body Taurus; 16 FT Truck, Goods Transport Service – Per KM Based Service - House hold/office, Food Grains, Machinery and equipment, Truck 15 to 18 Ton; Open Body Taurus; 21 FT Truck
Thermal and Spray Insulation works pertaining to TG and Boiler for 210 MW Unit-6, PTPS Panipat as per scope of work of e-NIT No. MP-6100/Insulation/2024
construction of 3 No. Pump chamber, 3 No. boundary wall and providing and fixing of 3 No. Pumping machinery and control panel board.
Jogipur Drilling of 01 No Tubewell and installation of 01 No Pumping Machinery in village Jogipur by DTH Rig Method Only Distt Nuh
Repair of pumping machinery of existing 29 No. tubewells and all other works contingent thereto. For 12 months. Under PHE Sub Division Shahbad
Repair of Pumping Machinery of existing 25 Nos tubewells including submersible cable and starter and all other works contingent there to ( 555 BHP)
Construction of 2 No. UGT, Pump chamber, Pumping Machinery and laying of 250mm i/d DI Pipeline from STP Tauru to ITC Hotel
Repair of pumping machinery of existing Tubewell and Booster and all other works contingent thereto For One Year Under Sub Division Kalka Charnian
Mtc. of submersible pumping machinery including panel board , starters and all other related equipments thereto for the period 01.05.2019 to 31.03.2021 10 months
BARSOLA Providing Functional House Hold Tap Connection, laying of pipe line Pumping Machinery in village Barsola and all other works contingent there to
Repair of pumping machinery of existing 28 No. tubewells and all other works contingent thereto. For 11 months. Under PHE Sub Division Shahbad