Construction of GLSR, Providing, laying, jointing, testing and commissioning of pipe line from Open well to GLSR and Installation of Pumping Machinery, Power Connection at existing Open Well in village Santhaliya , Tehsil-Masuda, Block-Masuda, ML
Construction of GLSR, Providing, laying, jointing, testing and commissioning of pipe line from Open well to GLSR and Installation of Pumping Machinery, Power Connection at existing Open Well in village Kesarpura , Tehsil-Masuda, Block-Masuda, MLA
CONSTRUCTION OF RCC OW, PROVIDING, LAYING AND JOINTING PIPE LINE WITH PUMP MACHINERY AT RWSS ROOPAWALI, GP-SALORE,, BLOCK DELWARA DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
Construction of RCC Open well GLSR Providing Laying Jointing of Pipe Line with Pump Machinery at Village Nayagoav Gram panchayat Saroth Block Bhim District Rajsamand with one year defect liability period on Single Point Responsibility Basis
CONSTRUCTION OF RCC OW AND TW, PROVIDING, LAYING AND JOINTING PIPE LINE WITH PUMP MACHINERY AT VILLAGE UNWAS, BLOCK KHAMNOR, DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
Construction of RCC GLSR Providing Laying Jointing of Pipe Line with Pump Machinery at Habitation Kankar ka Bhilwara Nawaghar Village Halai Ki Bhagal GP Kanuja Block Kumbhalgarh District Rajsamand with one year DLP on SPR Basis
Construction of Bulk water meter chamber, P.L.J. of DI pipe line and Providing and Fixing of pumping machinery with composite panel board at 10 Nos water supply scheme with defect laiblity period one year under Dn.Anoopgarh
(NIT NO. 10) PROPOSAL FOR REPLACEMENT OF OLD AND WARN OUT PIPE LINE AND PUMPING MACHINERY UNDER 15TH FINANCE COMMISSION PHASE 1 AND 2 WITH ONE YEAR DEFECT LIABILITY PERIOD AT URBAN WATER SUPPLY SCHEME BIJAINAGAR
CONST. OF COMM. OF OHSRS AT SUTHARO KD, INDRA NAGAR, DUDDIYO KD, SADRI AND CHOUTINA BERA PUNIYO KD, NOSAR WITH PROVISIONS OF RISING MAINS/INTERCONNECTION FROM EXISTING SYSTEM, PUMP MACHINERY AND OTHER ALLIED APPURTENANCES DISTRIC PHALODI
CONSTRUCTION OF RCC OW, PROVIDING, LAYING AND JOINTING PIPE LINE WITH PUMP MACHINERY AT RWSS KAMA, G.P. FATEHPUR, BLOCK KHAMNOR, DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
Annual contract for providing highly skilled manpower for operational activities of various equipments of main plant area and machinery for unit 1, 2, 3, 4, Stage-I, Phase-I and II, Chhabra Thermal Power Project, Chhabra
Cleaning and Up-keeping of Main plant area Stage I to V, Roads, Footpaths, Common Auxiliary areas and other offices, Toilets, Urinals of Main plant Unit 1 to 7 and Transportation of Garbage and other materials of KSTPS, Kota except CHP and Boiler
BRAKE SHOE REAR, ASSY MASTER CYLINDER, SPARK PLUG, REGULATOR ASSY LH, THERMOSTAT, ASSY BRAKE SHOE WITH LINING STD, KIT FOR AIR COMPRESSOR, TAPPER ROLLER BEARING, HYDRAULIC PIPE, BUSH SET, DOOR LOCK ASSY LH, DRIVE ASSY, BEARING ASSY REAR, CABLE ASSY CONTROL, SOLENOID 24V, JOINT ASSY UNIVERSAL, FAN BELT, HIGH PRESSURE HOSE, ASSY TIE ROD END, CASE HEAD LIGHT, LOCK SIDE COVER, COVER OIL FILTER ROTOR, DOOR MECHANISM, BRUSH CARRIER ASSY
Driven Plate for Clutch, Relay Solenoid Eng Starter Elect, Cover Assy, Clutch Disc, Ignition Switch, Micro Filter Make Micro Flow, Vane Pump, Positioner Assy, Shock Absorber Assy, Air Compressor, Ram Hydraulic Assy, Distributor Head, Water Pump Assy, Assy Clutch Pressur Plate 330D, Air Dryer With Unloader valve, Assy Clutch Master Cylinder, Assy Master Cylinder 24 5 DIA, Field Coil Assy, 352 DIA Clutch DISC Assy 1 75 Spline
GI PIPE HEAVY DUTY 15MM (B CLASS ERW) MAKE JINDAL, HEAVY DUTY BALL VALVE 15MM MAKE ZOLOTO, HEAVY DUTY BALL VALVE 25MM MAKE ZOLOTO, HEX NIPPLE 1/2"15MM MALE MAKE UNIK, Elbow1/2 MALE 15MM MAKE UNIK, TEE 1/2 " FEMALE 15MM MAKE UNIK, ANGLE SUPPORT FOR ... CONNECT AIR COMPRESSOR & ...
Supply of Sample cooler for main Boiler at STPS-SC, Suratgarh
For providing technical Supervisory Services or Consultancy at site for maintenance and breakdown works of Fans (ID, FD , PA) of 2x660 MW, Unit 7 and 8,SSCTPS,Suratgarh
Annual Maintanance contract for repairing of Hydraulic adjustment Device (HAD) of PA, FD and ID fans at SSCTPS, suratgarh For FY2025-26
GEAR HERRING BONE part no 700901005, SPUR GEAR part no 700907003, ITERMEDIATE SHAFT WITH PINION part no 700907002, MAIN DRIVE SHAFT part no 700909201, LOCK NUT part no 550310221, OIL SEAL part no 51801109, Spherical Roller Bearing - 22222C part no 51307010, Spherical Roller Bearing - 22317C part no 51307028, HOLD BACK part no 005861400
3HP-960 RPM Motor, Control Panel with 3 Phase, Motor Gear Box, Zig Zag Lift System, Long Range Wireless Transmitter with Rechargeable Battery, Long Range Receiver Wireless with Rechargeable Battery, Target System Control Relay Circuit
clutch booster, water pump assy, front axel bearring, head light bulb 24v, head light bulb 12v, door lock, oil filter, gear box plunge lock nut, front axel seal, alternator assy, dryer assy, tie rod end
CLUTCH MASTER CYL ASSY, STEERING GEAR BOX SEAL KIT, SOLENOID SWITCH, DRIVE PINION, CE BUSH, BRUSH GEAR ASSY, ENG MOUNTING PAD, PART KIT UNIVERSAL JOINT, WATER PUMP ASSY, CLUTCH RELEASE BEARING, ARMATURE ASSY, ROLLER BEARING
Engine Mounting Front, Front Wheel Bearing, Brake Pad, Cover Timming belt out side, Seal front oil cam shaft, Cover Assy Clutch, Clutch Disc, Bearing Clutch Release, Steering Tie Rod assy, Oil Seal Steering Gear box
TQ GEAR OIL, GEAR OIL 85W140, SERVO COAT CARDIUM COMPUND, LUB OIL SERVO PRIDE SAE30 AND 40, TRANSMISSION OIL ROSENBAUER CFT, OIL SERVO SYSTEM HLP 68, PRIMING PUMP GEAR BOX OIL BOQ Title BOQ BID
Bendix drive assy, Rear view mirror, Bty cut off switch, Axle boot cover, Gear box oil seal, Tie rod end, Gear tie rod end, Strg Joint assy, Fan brld, Head light relay BOQ Title 10000
Feeding of LGO into primary crusher by using front end loader and tippers at IBP jhamarkotra mines Udaipur
Goods Transport Service – Per KM Based Service - Vehicles, Machinery & Equipment; Flatbed Truck; Carrying Capacity 20 Ton, Machinery & Equipment; Flatbed Truck; Carrying Capacity 40 Ton, Machinery & Equipment; Flatbed Truck; Carrying Capacity 70 Ton
Hermetically Sealed Scroll type Compressor, Suitable for R-407C Refrigerant gas, working on 3-Phase, 415V AC, 50 Hz, Suitable for use in LHB-type RMPU AC Coaches, Conforming to RDSO specification no. RDSO/PE/SPEC/AC/0061/2005 (Rev- 1).
Compressor Crank case oil Servo Press 150 RR of M/s IOC Note: The oil should be packed in 210 Ltrs capacity Non returnable New rigid and sound steel drum IS:1783 (Part I)/1983 Grade A Type 2. Accepted
OVERHAULING KIT FOR 18 MONTH OF COMPRESSOR TYPE 3HC-55 TO M/s KPC PART NO. 0912012400. KIT CONSIST OF 05 SET OF 51 ITEMS & 137 NOS. AS PER ENCLOSED "ANNEXURE" AND CONFIRMING TO RDSO SMI NO. RDSO/PE/SM
SPG.LOADED SWITCH FOR COMPRESSOR USED AS BLCP (POS NO. TYPE-SBM) TYPE- F/TUSO/21/22/20 AS PER CLW SPEC. NO. CLW/ES/3/0075 OR LATEST AND M/S ABB DOC NO. HBTB 5604 R2001 OR LATEST Make- DELCO
OVERHAULING KIT FOR 36 MONTH OF COMPRESSOR TYPE TYPE 3HC-55 TO M/s KPC PART NO.0912012500. KIT CONSIST OF 01 SET OF 6 ITEMS & 09 NOS AS PER ENCLOSED ANNEXURE AND CONFIRMING TO RDSO SMI NO. RDSO/PE/SMI
Work of removing Cleaning and Up keeping of oil guns of boiler and assistance in other operational activities Control room and other misc works in shift duties general shift of stage I to IV UNIT-1 to 6 of SSTPS Suratgarh for 12 months
Annual contract for Routine breakdown capital Mtc of PT Plant, DM Plant, LP piping, Boiler chemical dosing skids ,CW treatment and SSF system chlorination plant and up keep of the area of Phase I and II , Stage-I, Unit# 1 to 4,CTPP,Chhabra
CONSTRUCTION OF RCC OW, PROVIDING, LAYING AND JOINTING PIPE LINE WITH PUMP MACHINERY AT RWSS DHOL KI BHAGAL, MACHIND, BLOCK KHAMNOR, DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
O and M of Khanpur Water Supply Project including 14 enroute villages, (O and M of pumping machinery, Transmission main, OHSR, GLRs, WTP HW, Pump house, residential quarter, distribution pipe line etc.), District Jhalawar for 3 years
Providing,Laying Jointing of Pipe Line From New OW to OHSR and Pump Machinery At Bhaga Kheda, G.P. Madariya, Block Deogarh, District Rajsamand On Single Point Responsibility Basis With One Year Defect Liability, Under DMFT GC 16
Construction of Open well RCC GLSR Providing Laying Jointing of Pipe Line with Pump Machinery at Nadiya Parto Ka Choura Village Miyalakhet GP Saroth Block Bhim District Rajsamand with one year defect liability period on SPR Basis
21-Installation an commissioning of Tube well installation complete ,in all strata with pumping machinery, HDPE lowering pipe, Submerssible cable, XLPE cable complete 3 phase panel with starter etc in Sub Division Rural Dholpur under division Dholpur
Construction of RCC Open well GLSR Providing Laying Jointing of Pipe Line with Pump Machinery at Habitation Do kudi of Village Doongaji Ka Goav Block Bhim District Rajsamand with one year defect liability period on SPR basis
Nagar Palika Area me Nala/Naliyon Ka Safai Karya Evm Nala/Naliyon se Nikalne Wale Kachre-Malwe (Silt) ko Uthanae evm Ektrit Kane hetu sampurn Machinery, Labour, Diesel, Driver Dwara Nirdhari Isthaan par Parivahan Sahit Sampurn Karya
DISMANTLING OF EXSTING OHSR, CONSTRUCTION OF OPENWELL, OHSR and CWR, PROVIDING, LAYING and JOINTING OF PIPE LINE WITH PUMP MACHINERY AT TAL, BLOCK DEOGARH, DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER
REPLACEMENT OF OLD PIPE LINE PUMP MACHINERY EXTENSION OF PIPE LINE AT RWSS KUNDIYA KOLPURA and DEEPENING and DESILTING OF OPEN WELL AT RWSS GANGAS UNDER DM CONTINGENCY PLAN 2025-26 WITH ONE YEAR DEFECT LIABILITY PERIOD
PROVIDING, LAYING AND JOINTING PIPE LINE WITH PUMP MACHINERY AT TALAYO KI BHAGAL JAL CHAKKI VILLAGE SAYON KA KHERA, BLOCK KHAMNOR DISTRICT RAJSAMAND ON SINGLE POINT RESPONSIBILITY BASIS WITH ONE YEAR DEFECT LIABILITY, UNDER DMFT GC-16
Rate Contract of Supply Laying jointing testing and Commissioning of various type and size of Pipe Lines and Supply installation and testing commissioning of pumping machinery under jurisdiction of PHED Division Salumber with 12 months DLP Period
Annual contract for providing highly skilled manpower for operational activities of various equipments of main plant area and machinery for unit 1, 2, 3 and 4, Stage-I, Phase-I and II, Chhabra Thermal Power Project, Chhabra
Transmission Main, WTP, SCADA, Road Crossings, forest clearance, VVNL for Power line, land acquisitions, Intake pumping machinery, WTP pump house IPS and 10 years O and M including physical contingencies, price escalations of Baran distt Package-II
Cleaning Sanitory and other work on Job Basis (including manpower / machinery / material and supervision) in the Complete premises of Dr. S. N. Medical College, Jodhpur and Guest House and Attached Hostels situated at different locations in Jodhpur
Routine/ Breakdown maintenance of conveyor drives and rollers in CHP at SSTPS, Suratgarh
Providing and Fixing Colour coated sheet for CHP conveyor at STPS Plant Suartgarh