Loading…
Loading…
1,25,358 results • Best match
BALL MILL MAIN GEAR BOX, MODEL: SZN 630 (Q3)
Helical Speed Increaser Gear Box, High Speed Spindle Assembly
Gear Box lub oil Cooler, 0501215342, Qty -02 Nos
GEAR BOX OF ROTARY VALVES AS PER TENDER DOCUMENTS
Mechanical Gear Box Jack (Q3), Inductive timing light (Q3)
GEAR BOX COMPLETE FOR WSP, COOLING TOWER, CCD-2
DISC FILTER DRIVE GEAR BOX, PHASE I &II (Q3) ()
00010 M2052450600 GEAR BOX ASSY, ALLENBERRY, GB, CKC-450
SPARES OF MAIN GEAR BOX, MAIN GEARING PORT ETC
GEAR BOX FOR CAROUSEL SYSTEM, ETHERNET BASED SLIPRING ASSEMBLY
GEAR BOX ELEC KCN 280 GEAR B H.50287, GEAR BOX ELEC KCH 225 RH GEAR B H5OO42, GEAR BOX ELEC S3-18-HN-3 INPUT SR. NO H, GEAR BOX ELEC S3-16-HN-3 INPUT SR. NO H, GEAR BOX ELEC SDN-355, INPUT SR.NO W, GEAR BOX ELEC KCH-225, INPUT SR. NO
YASH MACHINE TOOLS Trowel Scoop Trowel
Cutting Machine Tools and associate items
MACHINE TOOLS & HELICOIL INSERTION TOOLS (Q3) ()
TAMPING MACHINE TOOLS FOR CSM UNIMAT
Custom Bid for Services - Servicing of Heat Exchangers and Buffer Vessels SRV of Oxygen Plant Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Supply and Application of Refractory Lining in Channel Assembly of DSE-204 Heat Exchanger (Sulphur Condenser-II), as per tender conditions.
Laying of new conveyor belt,dragging of snapped belt,arresting of patches on conveyors and providing rubber lagging to the pulleys of conveyor belts of coal handling plant
Repairing over hauling of four stage gear box no. GB 65A-1 stand by gearbox unit no. 1406 at LOading section at Madhuban Coal Washery under Block-II Area, BCCL .
Calibration Services - Mechanical; CALIBRATION OF AUTO HYDRAULIC PRESS; NABL Labs; Lab
Hydraulic Press 60 Ton Load capacity ( 4 Pillor Type-Down Stroking)
Hydraulic press for sample preparation with specifications as per annexure (Q3)
Repair and Upgradation of 200 tonne Hydraulic Press into Hot Press
Motorised Hydraulic Press capacity 100 ton and Universal sheet folding machine
HYDRAULIC PRESS FOR PRESSING CONTROL ARM FOR VANDE-BHARAT BOGIE ASSEMBLY
C Frame Vertical Hydraulic Press, Cap. 200 Ton, Qty. 01 No.
PROCUREMENT OF 200T HYDRAULIC PRESS (VERTICAL) ELECTRICAL OPERATED FOR RGOCM-1.
Motorised Hydraulic Press Capacity 10 Ton for PVC Mould Making (Q3)
Procurement of Non CNC Hydraulic Press Brake of Capacity 80 Ton
HYDRAULIC PRESS FOR PRESSING CONTROL ARM FOR VANDE-BHARAT BOGIE ASSEMBLY
Hydraulic press bending machine of Tonnage 125 ton, Table length-1550mm
Steering Gear Box, Rear Wheel Brg, Front Wheel Brg, Air Filter, Fuel Pipe
Gear box cable, Side indicater glass, Foum sheet, Speedo meetar cable, EPS Sheet
REDUCTION GEAR BOX, TYPE 7FSM OR 7SNU, GEAR RATIO- 30: 1, MAKE: ELECON
MTPS I CHP II Routine preventive maintenance works in conveyors 12A1 12B1 12A2 12B2 15A 15B conveyor 18 etc
Replacement of 1400mm width conveyor belting in unit 403-B and unit 201 belt conveyors at Moonidih Coal Washery.
PROCUREMENT OF IDLER CLAMPS FOR 4A2/B2/C2/D2,5A/B,C/D,MILL REJECT CONVEYOR-1A,2A/B CONVEYORS
Fabrication of breaking bolt (connecting pinion shaft ) for gear box and primary crusher drum of BWF make feeder breaker presently installed at JRD rly siding PF1, AKK OCP
Custom Bid for Services - Repairing of Gear box U 600 for belt C 15 of IR crusher at CHP of Umrer OCM Similar Category Repair and Overhauling Service
Gear Box assembly for Hoist travel for electric hoist, Gear Box assembly for cross travel for electric hoist, Gear Box assembly for cross travel for electric hoist (Item 4), Gear Box assembly for Hoist travel for electric hoist ( Item 5), Gear Box ... 6), Gear Box assembly ... 8), Gear Box assembly ... 7), Gear Box assembly ... 9), Gear Box assembly ...
30 BAR MD COMPRESSOR WITH ACCESSORIES, ON BOARD SPARE FOR 30 BAR MD COMPRESSOR, TOOLS FOR 30 BAR MD COMPRESSOR, DOCUMENTATION FOR 30 BAR MD COMPRESSOR, INSTL AND COMM SPARES_30 BAR MD COMPRESSOR, 1ST SUBMISSION OF BD_30 BAR MD COMPRESOR, ... MD COMPRESSOR , ... MD COMPRESSOR
Custom Bid for Services - 2122 241 Total Lump sum charges for unloading of Air Compressors and its auxiliaries at Urea Plant site or at Central stores and afterwards shifting to Plant as per Scope of Work for 2 Nos Air Compressor unit, Custom Bid for ... the Air compressor along ... Nos Air Compressor unit, ... of Air compressor units ...
SCREW COMPRESSOR FLUID. 20 LTR., OIL FILTER, AIR FILTER, OIL SEPARATOR, AIR INTAKE VALVE RH38E, SCAVANGE PIPE, MPVL KIT for IBL Compressor, SERVICE KIT THERMOSTATIC VALVE, O RING, COMBINATION BLOCK- BASE FLANGE, O RING FOR AIREND MOUNTING, BANDED ... Main Compressor , ...
Hydraulic Press Machine 10 Ton, 12V DC Injector Tester, Cordless Screw Dvr Pro GSB 120 LI, Digital Clamp Meter, Transmission Jack Mechanical
Hiring services to carry out dry ice blasting of boiler tubes in HRSG and UB boilers at OMPL
Overhauling Of Boiler Pressure Parts for One Unit of 800 MWSupercritical Boilers at NTPC Ltd Gadarwara (2x800 MW)
SUPPLY and APPLY OF AIRSEAL IN BOILER n AUXILIARIES FOR OVERHAULING OF 2X800 MW BOILERS AT NTPC LARA
Maintenance of BF and CO Gas Lines along with their equipment of TPP, CPP Boilers and Boiler 9
Maintenance of BF and CO Gas Line along with their equipment of TPP, CPP Boilers and Boiler-9