Loading…
Loading…
164 live86 closing this weekmost from TNEB Limited and Southern Railway
164 results • Best match
Repair and Overhauling Service - Erection of LTC A&B conveyor capacity enhancement work in unit-2 in TPS-II Expn; As per scope of work; Yes; Buyer Premises
Custom Bid for Services - GENERAL FABRICATION ITEMS INVOLVING MODIFICATION OF FINISHED NON PRESSURE BOILER COMPONENTS ( DUCTS, BUCKSTAYS AND STAIRS) AS PER BHEL ISSUED DRAWING Similar Category Mass Production Mining Technology Services - Per metric tonne basis Support Services Repair, Maintenance and Installation of Plant Systems/Equipments
SET OF ADDITIONAL SLING FOR MAIN COMPRESSOR AS PER SC RLY DRG NOC/ELS/LGD/AUX/3/43 ALT-1 REF 1 TO 09
Air lube XD oil as per Elgi part no.000998119 for ELGI make Screw compressor for periodic maintenance purpose. Packing: in 20 litre Can.
Set of spares for ELGI make screw compressor for periodical maintenance purpose , Set consists of 9 items as per annexure enclosed. Make: ELGI ONLY.
DESIGN MANUFACTURE SUPPLY TESTING COMMISSIONING OF STANDARD GAUGE METRO ROLLING STOCK (ELECTRICAL MULTIPLE UNITS) AND DEPOT MACHINERY and PLANT AND TRAINING OF PERSONNEL
Unit I Providing cup lock metallic scaffolding arrangements inside the boiler furnace up to the radiant roof to facilitate for inspection and tube thickness survey in water wall and platen SH inspection of burners and Cleaning of furnace and 1st pass
Repair and Overhauling Service - Technical support Services for Boiler and its auxiliaries during Overhauling at TPS-I Expansion for a period of 11 months; Thermal Power Plant; No; Buyer Premises
REFER ANNEXURE-I IN NOTICE INVITING TENDER
Overhauling ( 12th Year Schedule) of 4 numbers Transmission system Make- VOITH, Model T211r3 and Supply & replacement of 4 numbers of Universal Joint Shaft (Cardan Shaft) Make Voith Model No. ST-225.7, Voith Part No. 12403647010 (Transmission to ... Drive/Axle Gear Box ) ...
Flushing out of Oil from IBT Coil by applying Nitrogen Pressure Test (for Ammonia Refrigerant) and Replacement of IBT Liquid Line Valves with Compressor service at Sanur Chilling Centre
TTPS ES Circle Instn I Combined Estimate for annual overhaul works during the year 20262027 covering Boiler and Turbine Instrumentation sections including releasing, transporting, overhauling calibration cleaning painting re-fixing testing and commi
BM Division Unit II Boiler 600 MW Removal and Renewal of damaged Boiler roof sheet 100mtr EL in boiler Front side near LHS MS safety valve area Rear side near Boiler II pass LHS area including supply of Galvalume roof sheet
KARUR CORPORATION GENERAL FUND 2026-2027 Desilting the Channels using necessary Earth moving machinery from Sellandipalayam to ABS Hospital backside in Zone - IV at Karur City Municipal Corporation.
Custom Bid for Services - Proving assistance for maintanence and allied works of field machinery equipments working in Mine-II Similar Category Operation And Maintenance Of Other Machines And Plants
The Task of Seperating 10MT Mixed waste using machinery, Wet Waste to MCC, Not Saleable Dry Waste to Cement Factory Remaining Waste using KPI machine to Cement factory in Palani Municipality
BM UnitII Boiler Annual overhauling of Boiler Drum, Safety valves, Drum internals and Bottom ring headers in Unit II during 2026-27
TTPS ES Circle MRT I Annual Overhauling works in Boiler side Valves Dampers Soot Blowers L R Blowers Soot Blower Control panels and ID FD PA fans lub oil panels in Unit III for the year 2026 2027
Customized AMC/CMC for Pre-owned Products - Comprehensive BMC for 12T ACE Mobile pick and carry Crane of Boiler Mtce in TPS-II Expansion; SSSH Equipments Private Limited; Comprehensive Maintenance Contract (CMC); As per scope of work; No
Boiler Maintenance Division Unit II Boiler Annual overhaul of Gates Dampers of Primary air, Secondary air and Flue gas ducts during 2026 -2027
Unit II Boiler Replacement of defective Boiler pressure parts tubes and bends in interpass of Reheater front coil assembly during AOH 26-27
BM Division - Unit II 600MW Boiler - Providing cup lock metallic scaffolding arrangements inside the Boiler furnace from 11 Mtr S-panel area) to 54 Mtr EL (Elephant door - 9th floor level and Cleaning of Boiler I pass heating surface tubes
Custom Bid for Services - SERVICE CONTRACT FOR SHORT BLASTING AND PAINTING OF FINISHED NON PRESSURE BOILER AS PER BHEL REQUIREMENT Similar Category Mass Production Mining Technology Services - Per metric tonne basis Support Services Professional Painting Service Repair, Maintenance and Installation of Plant Systems/Equipments
NCTPS II M I Circle BM - 600MW - Unit- II Boiler - rectification of defective tubes in Boiler First pass area in Unit-II during AOH 2026-27
Design, Supply, Erection and Commissioning of Oil fired Steam Boiler
HPP Accumulator Complete Assembly, HPP Accumulator 4 L Bladder Repair Kit for Conveyors, HPP Accumulator 2.5 L Bladder Repair Kit for SCR Slew
BM Division - Unit II - 600MW Boiler - Supply and Installation of Air sealants in Dock house damaged area to avoid heavy hot ash leakage and air ingression into the Boiler during Annual overhaul 2026-27
NCTPS-II - M I - Circle Boiler Maintenance Division Unit-II Providing platform extension work in boiler LHS flame scanner area 55 Mtr elevation to facilitate to keep Cup-lock scaffolding materials during AOH period safe free movement
Repair and Overhauling Service - Sealing in Mill Sleeves, Doors & Cleaning Works in Filters, Hoods and Double Bearing area of TPS-II Boilers; Thermal Power Plant; No; Buyer Premises
Boiler Maintenance Division Unit II 600MW Boiler Annual overhaul of Air Pre Heater 2B pass and its lube oil system and rectification of corroded, eroded and damaged inlet outlet ducts expansion joints of Air pre heater- 2B pass
Boiler Maintenance Division - Unit II - 600MW Boiler - Annual overhaul of Air Pre Heater - 2A pass and its lube oil system and rectification of corroded, eroded and damaged inlet outlet ducts expansion joints of Air pre heater- 2A pass
Carrying out the facilitation works to attending Boiler tube rectification work, Arc filling of eroded tubes
TANGEDCO NCTPS I 3x210MW Installation of Semi Dry Flue Gas desulphurization system
NCTPS II MI Circle BM Division 600 MW Boiler UnitII Annual Overhauling of HP LP valves in Boiler and APRDS, Soot Blowing, Atomizing steam and SCAPH system., and renewal of Punctured damaged drain line pipes and bends during AOH
NCTPS II M I Circle BM Division Unit-II Boiler 600 MW Providing steps from 66mtr EL to 43 mtr EL in Boiler rear side for ease of maintenance and free movement of men material during Breakdown AOH works
NCTPS-II M I Circle Boiler maintenance Division Unit-II Providing platform extension work in boiler LHS walkway ladder area at 9 Mtr elevation to facilitate to keep Cup-lock scaffolding materials during AOH period safe free movement of
NCTPS-II - M I Circle Boiler maintenance Division Unit-II Providing platform extension work in boiler RHS flame scanner area 55 Mtr elevation to facilitate to kept Cup-lock scaffolding materials during AOH period safe free movement of men
NCTPS II M-I Circle BM Division Unit-I Boiler Routine Maintenance Attending Boiler tubes rectification work by cutting of defective tube and replacing with new tubes for a period of six months from the date of handing over of site
MTPS-II-M-II-Circle-CHP-I- Reconditioning of 870 PST Scoop Coupling, inclusive of required consumables etc., for Ring Granulators in Secondary Crusher House
NCTPS I ES Circle EM II Division S Dn I Unit I Overhauling of ID Fan motor 1A SI No 32277 P 401 01 04 at Boiler area 0 mtr Mill Motor 1B SI No 44170 A 401 21 03 at Mill area and complete cleaning and maintenance of HT motors 10 Nos to be c
BM Division Unit-II Boiler Annual Overhauling of Water Wall Soot Blowers and Long retractable soot blower during 2026-27
BM Division UnitII 600MW Overhauling of Boiler Main Steam Stop valve1 2 MSSV1 2 E2 valve during the year 2026-27
Engagement of Labour and Machinery for Track Maintenance in Stage 1A, Stage 1B and Poonamallee Depot
NCTPS I SE MI Circle AOH 26 27 TM Dn Unit I II III Overhauling of air line valves and ACW line valves of Air compressors in during annual overhaul period 2026 27
MTPS II ES Circle MRT Division To attend the work in Boiler area low torque motorized actuators 90 Nos during Capital overhauling 2026
NCTPS I SE MI circle AOH 26 27 BM Dn Unit I Annual Overhaul of Air Pre Heater A B Pass and its lube oil system during the year 2026 27
Custom Bid for Services - SUPPLY, INSTALLATION AND COMMISSIONING OF DRY FOG DUST SUPPRESSION SYSTEM (DFDS) IN CHP (CRUSHER HOUSE, TP5, TP15 AND TP16) AREA AT NTECL Similar Category Operation and Maintenance Power House/Power Plant
Fabrication and Supply of PANELS (Pressure Part Items) with BHEL Material (OSB) and Transportation of Panels to CFBC 3x140TPH Boiler, Bandhabahal, Jharsuguda District, Orissa Project Site
NCTPS I SE MI Circle AOH 26 27 BM Dn Unit I Arresting the air ingress area in Eco lower expansion 9th header HRH slope and rear arch area in IInd pass by renewal rectification of damaged skin casing and refractory during Annual Overhaul 2026 27
NCTPS I SE MI Circle AOH 26 27 BM Dn Unit I Flue Gas Duct Renewal Rectification of flue gas duct portions from ID outlet to before Chimney during annual overhaul 2026 27