Loading…
Loading…
13,525 results • Best match
SPARES FOR BOILER FEED PUMP WORKING OIL COOLER; TUBE STACK ASSEMBLY AS PER DRG. NO. BFP/WOC-II/201, BOILER FEED PUMP LUB OIL COOLER TUBE STACK ASSEMBLY
Providing toilet building in ECHS area near JNT 6, JNT 52, JNT 64 and Secondary Crusher House-_I at NCTPS_I premises
Top Block for" ELGI" make Oil Free Compressor - Model No: TS 10 OFB/VBE450067, Top Block for" ELGI" make Oil Free Compressor - Model No: TS 10 OFB/BVKT277569
Repair and Overhauling Service - Remove and overhaul gear box rod gearing system and drive linkage of Helo Hangar System Replace defective parts Love Joy Coupling of a good quality between motor and gear be renewed Post completion system to be proved..
MTPS1 TM Unit II Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well
1/2 inch Drive Cordless Hammer Drill Kit with following specifications: 1. Max charging time 60 Min. 2. Chuck Cap 13mm min 3. Min 2 Speed Gear Box 4. Length of Tool 275mm max 5. Height of Tool 250mm m
Supply and Installation of set of Shaft with gears and bearings for W&T Reva Traverser Gear Box (Model C 160) as per the DRGS ( DRG. No. J&TD. CW. PER. SR. Drg. No. MP - 231 to 244). Material Should A
NCTPS I M.II Circle ICHS Dn. Fabrication, Machining and assembling of Impact idlers of 1800mm belt width for conveyor 4B 5B of ICHS conveyors
SUPPLY OF SUPPORT CLAMP ASSEMBLY SUITABLE FOR ECONOMIZER COILS OF UNIT I II and III BOILER
TTPS Operation Circle MPM II Unit-IV Replacement of pulverized coal pipes, bends and fittings between boiler inlet elbow and sleeve coupling at 10.5mtr to 32 mtr level of boiler area during 2021 annual overhaul
MTPS I BM Unit IV Boiler Pressure Parts AOH 2019 Removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube etc
Repair and Overhauling Service - High pressure water jet cleaning of boiler furnace and APH baskets for unit-1 boiler during overhaul in Dec 2025 (FY 2025-26); 500 MW Thermal Power Plant; No; Buyer Premises
CE010530004: MS SCAFFOLDING FOR 2X210MW TOWER TYPE BOILER FURNACE, QTY: 1 Set., CE010530005: CUP LOCK SCAFFOLDING 2X210MW HOT FLUE GAS DUCT, QTY: 1 Set.
Please check the tender documents carefully and quote your rates accordingly for maintenance of Conveyor and Mechanical Equipment at Coimbatore LPG Plant.
CARBIDE INSERT RCMT1606M0-RS T9215. Note: CHIP SHOULD BE DISCONTINUOUS OR SEGEMENTAL CHIPS WHILE FACING VB WHEEL DISC IN VERTICAL TURRET LATHE TO AVOID ACCIDENTS.
superficial Cleaning of workshop, machineries such as centre lathe, universal drilling machine, milling machine, metal cutting hacksaw (power operated ), plate guillotine and hole punching machine,
Reciprocating Air Compressors - Electric Motor Driven (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
CONNECTING ROD AND CAP ASSEMBLY WITH NEEDLE BEARING TO ELGI PART NO. 070308930. AND KPC PART NO.096.50.391.50 FOR ELGI/KPC UPGRADED COMPRESSORS.
MTPS I CHP I Locomotive Maintenance Overhauling of 3 Nos air compressors 2 Nos TRC1000B ELGI make and 1 No Ingersoll rand make
Custom Bid for Services - AMC for Servicing of Kaeser Compressors in SSTP - BHEL TRICHY Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - Providing Supervisory Services for Maintenance of Instrument and Plant Air Compressors of ATLAS COPCO make at NTECL 2024 26
Repair and Overhauling Service - Mining Machinery; BWE, MTC, SPREADERS IN MINE 2 OF NLCIL; No; Buyer Premises
MTPS I Mill Plant III Complete overhauling of gearbox Mechanic face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly etc
MTPS I Mill Plant II Complete overhauling of gearbox Mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly etc
NCTPS I SE MI circle AMC 25 26 BM Dn Unit I Routine Maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning Boiler structure I and II pass in Boiler pressure parts
NCTPS I SE MI circle AMC 25 26 BM Dn Unit II Routine maintenance in Boiler Fuel Oil Cleaning Burner tilt Cleaning and attending Minor repair works and Routine Inspection and Cleaning Boiler structure I and II pass in Boiler pressure parts areas
Micro controller for Kirloskar screw compressor Model: KES 30-7.5 Part number 211.08. 009.50, Control Transformer TR-1 for Kirloskar Screw compressor Model: KES 30-7.5 Part number 211.08. 467.50, Control Transformer TR-2 for Kirloskar Screw ... Screw compressor Model: ...
Remedial Measures to RCC PSC Structures of Coal Jetty 1 Conveyor System in between Coal Jetty - I Conveyor - 13 A approach Span 1 3 of TTPS in Red Gate area North Break Water VOC Port at ECHS areas
TTPS Mech II BM Unit III Boiler Cleaning of Ist pass Furnace II pass and Boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during 2019 2020 overhaul
Providing Cement Concrete Road Ward No04 Balasundharapuram Colony and Ward No 07 Kavindapadi road chitra Lathe Street in Kanjikovil Town Panchayat
Replacement of eroded damaged erosion protection shields of pressure parts tubes in Ist and IInd pass and renewal of worn out HP valves in boiler area during 2017 18 overhaul
Repair and Maintenance of Plant/Systems/Equipments - Mines; Mining Machinery; Buyer
Repair and Maintenance of Plant/Systems/Equipments - Mines; Mining machinery; Buyer
Drum inspection, cleaning of drum internals, doors, Overhauling of phosphate dozing system, water washing and cleaning of I pass (Furnace), II pass, Boiler structure by water jet in Unit- V Boiler for the year 2018 -19
Drum inspection, cleaning of drum internals, doors, Overhauling of phosphate dozing system, water washing and Cleaning of I pass (Furnace), II pass Boiler structure by water jet in Unit IV Boiler for the year 2018-19
Tender notice for Supply of Belt Conveyor - 1 No. and Sugar bag Stacker with electrical unit - 1 No.
Fabrication and erection of side cladding around the Recovery Boiler lift at TNPL Unit II
SUPPLY OF SPARES SAFETY VALVES AND SOOT BLOWER IN UNIT I, II and III BOILER
NCTPS II M I Circle BM Division Unit I Boiler 600 MW Providing steps from
Collection and Loading of Recovery Boiler ESP ash at SRP Process in TNPL Unit - 1.
SUPPLY OF VARIOUS SIZES OF HIGH PRESSURE VALVES FOR UNIT 1 2 and 3 BOILER
Supply of super heater steam cooled wall header no.4 Left for unit I Boiler
supply of Biplane damper assembly without frame for FG inlet damper suitable for 600mw Boiler
Repairing of corroded top and bottom plates in Recovery Boiler-2 Chimney at SRP - Mechanical.
Construction of Hot Well make Pump Room for Boiler Maintenance Unit 5 area at TTPS.
Filters suitable for AC DC Scanner Cooling Air Fan of unit I and II Boiler
Providing RCC flooring and approach road in Boiler No.6 silos at TNPL Unit I
Supply of Guide pipe assembly for flame scanner suitable for Unit I and II Boiler
SUPPLY OF SPARES FOR BOILER FREIGHT CUM PASSENGERS LIFTS 1360 KGS CAPACITY IN UNIT I
SUPPLY OF END SHIELD FOR ECONOMIZER COIL UPPER ASSEMBLIES REAR LEFT FOR UNIT V BOILER