Loading…
Loading…
13,551 results • Best match
MTPS BM Unit I Boiler AOH 2021 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes
EM III Annual maintenance works in Boiler Feed Pump Motors 5A 5B and 5C and Condensate Extraction Pump Motors 5A and 5B during Annual overhaul 2022 23 or there after
TTPS Mech II BM Unit III Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul for the year 2022 23
TTPS Mech II BM Unit III Replacement of plugged eroded Economizer coil assemblies from right end to middle area in Unit III Boiler during overhaul for the year 2025 2026
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
TTPS Mech II BM Unit IV V Boiler Preventive and breakdown maintenance works in Burner and H O Guns for a period from 01 04 2023 to 31 03 2024
Annual maintenance works in Boiler Feed Pump Motors 4A 4B and 4C and Condensate Extraction Pump Motors 4A and 4B during Unit IV Annual overhaul for the year 2021 2022
TTPS Mech II BM Unit I Seat cutting of direct spring loaded safety valves of 210MW boiler Drum safety valves and super heater safety valves during annual overhaul 2023 2024
MTPS I M I Circle CA Division FP Replacement of 350NB worn out corroded MS ERW pipe lines in the Hydrant System Boiler and Coal yard headers and Emulsifyre system
Sp.61 NCTPS II ES circle CI Division BOP I Subdivision Unit I Carrying out Annual Overhaul maintenance activities of CI equipment s of Boiler Turbine and System allied areas.
Custom Bid for Services - TI 001 23 Engaging an agency to ensure Proper erection and certification for Use of winch arrangement exterior cradle system in Boiler stack in CPCL Manali
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 and 2 during the forthcoming overhaul
RENEWAL OF AXIAL AND RADIAL ID SUCTION AND DISCHARGE DUCT FROM ECONOMIZER-I OUTLET TO CHIMNEY BOTTOM WITH BELLOWS, FLANGES, MANWAYS, ETC. (TO SUIT SITE CONDITION) IN BOILER-II (T4134)
MTPS I BM AOH 2021 Unit I Boiler pressure parts Rectification and replacement of overheated HRH coil header stub bends and other circuit bends at penthouse area and allied works
MTPS I BM Unit II Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment etc
TTPS Mech II BM Unit I II III Boiler Preventive and breakdown maintenance works in Burner and H.O. Guns for the period from 01 04 2024 to 31 03 2025
TTPS Mech II BM Unit IV V Boiler Preventive and breakdown maintenance works in Burner and H O Guns for the period from 01 04 2025 to 31 03 2026
SUPPLY ERECTION AND COMMISSIONING OF HIGH MAST TOWER LIGHTING AFTER DISMANTLING THE EXISTING DEFECTIVE LIGHTS AND ITS ACCESSORIES AT FOPH DM PLANT AND UNIT-III BOILER AREA IN NCTPS-I
TTPS Mech II BM Unit IV V Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit IV V Boiler for the year 2022 23
TTPS Mech II BM Unit III Replacement of eroded plugged Economizer coil assemblies from left end to middle area in Unit III Boiler during overhaul for the year 2025 2026
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
A Preventive Maintenance works of Boiler Side Valves Damper actuators control panels in plant auxiliaries area pertaining to SUB DN I of MRT I in Units I II and III
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 and 2 during the forthcoming overhaul
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator system in Units IV V for the period of work on or after 08.04.2022 and upto 30.09.2022
TTPS Mech II BM Unit V Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul for the year 2024 2025
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
TTPS Mech II BM Unit II Seat cutting of direct spring loaded safety valves of 210MW boiler Drum safety valves and super heater safety valves during annual overhaul 2023 2024.
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 and 2 during the forthcoming overhaul
TTPS Mech II BM Unit IV Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul for the year 2024 2025
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
MTPS I BM Unit I and II Boiler AOH COH 2024 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied work
MTPS I BM AOH 2021 Unit III Boiler pressure parts Rectification and replacement of overheated HRH coil header stub bends and other circuit bends at penthouse area and allied works
TTPS Mech II BM Unit IV V Boiler Preventive and breakdown maintenance works in Burner and H O Guns for the period from 01 04 2024 to 31 03 2025.
TTPS Mech II BM Unit I Renewal of damaged heavy oil line atomizing steam line in AB CD EF elevations of Unit I Boiler during the annual overhaul 2025 2026
MTPS I BM Unit II Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and Wornout square coal nozzle tips and checking of deformation and matching with nozzle
MTPS I BM Unit IV Boiler pressure parts AOH 2024 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area etc
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 and 2 during the forthcoming overhaul
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area etc
MTPS I BM Unit I Boiler pressure parts AOH 2026 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment etc
MTPS I BM Unit I Boiler Pressure parts AOH 2026 Reconditioning and Hard facing of used and Wornout square coal nozzle tips and checking of deformation and matching with nozzle
Supply of ACC make Fire Crete castable refractory cement (or) TATA make CAST FH-70 refractory cement or equivalent in 50 Kg HDPE bags for Unit I to V Boiler
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends fittings between Mills A, B C and Boiler in Unit-II during 2019-20 annual overhaul
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends fittings between Mills D, E F and Boiler in Unit-II during 2019-20 annual overhaul
Custom Bid for Services - INSPECTION OF BOILER TUBE PIPES WELD JOINTS BY PHASED ARRAY ULTRASONIC TESTING PAUT DURING OVERHAULING AT NTECLVALLUR TPP Similar Category Hiring of Third-Party Inspection Agency
Custom Bid for Services - CPCLK24396 Overhauling of Drive Turbine 221TUR1T of MP Boiler Feed Water Pump 221G21A at CoGen CPCL Similar Category Operation And Maintenance Of Other Machines And Plants
JAW CLUTCH DRIVING PART AND DRIVEN PART PART NO 444555, P BY BLOCK ASSY DRIVE DRIVEN DRUM PART NO 575510, P BY BLOCK ASSY FOR DISCHARGE DRUM PART NO 655510, P BLOCK ASSLY FOR TAIL TAKEUP DRUM PART NO PBTDPBTUD5510, HAND OPERATED WINCH IN SET PART NO HW5510, BED FRAME FOR 1X55KW PART NO BF5510, ROTATING BUSH BK PART NO VB2055, ROTATING BUSH CK PART NO VB225575, ROTATING BUSH DK PART NO VB2455, ROTATING BUSH FK PART NO VB2855, INPUT SHAFT BEARING COVER PART NO 555, INPUT SHAFT BEARING CAP PART NO 655, INPUT SHAFT OIL SEAL PART NO 955, INPUT SHAFT SPACING WASHER PART NO 1355, INPUT PINION SHAFT BEARING PART NO 1455, 2ND INTERMEDIATE SHAFT BEARING PART NO 2755, OUTPUT OIL SEAL PART NO 3555, ROTATING BUSH GK PART NO VB3255, HOLD BACK PART NO 45510, INPUT SHAFT OIL SEAL PART NO 975, 1ST STAGE GEAR AND PINION WITH INTEGRAL SH PART NO 1118C75, INPUT PINION SHAFT BEARING PART NO 1475, 1ST INTERMEDIATE SHAFT BEARING PART NO 197510, 2ND INTERMEDIATE SHAFT BEARING PART NO 277510, OUTPUT SHAFT OIL SEAL PART NO 3575, 3RD STAGE GEAR AND PINION IN SET PART NO 30367510, EQUALISING GEAR IN SET OF TWO NOS PART NO 527510, INPUT SHAFT OIL SEAL PART NO PART NO 990, INPUT SHAFT PART NO 1090, 1ST STAGE GEAR AND PINION IN SET PART NO 1118C90, INPUT PINION SHAFT BEARING PART NO 1490, OUTPUT SHAFT OIL SEAL PART NO 3590, JAW CLUTCH DRIVING AND DRIVEN PART NO 444590, P BLOCK ASSY FOR TAIL DRUM PART NO PBTD90, LOOP TAKE UP TROLLEY 90 KW VISHWA MAKE PART NO LTT90, HAND OPERATED WINCH IN SET LH AND RH PART NO HW9010, ROTATING BUSH BK PART NO VB2090, ROTATING BUSH CK PART NO VB2290, ROTATING BUSH DK PART NO VB2490, ROTATING BUSH FK PART NO VB2890, ROTATING BUSH GK PART NO VB3290, FIRST INTERMEDIATE SHAFT BEARING PART NO 1990, SECOND INTERMEDIATE SHAFT BEARING PART NO 2790, EQUALISING GEAR IN SET OF TWO NOS 52 PART NO 5290, HOLD BACJK PART NO 490, OUTPUT SHAFT BEARING PART NO 3790, EQUALIZING GEAR GUARD PART NO 5190, P BY BLOCK ASSY FOR TANDEM DRIVE DRUM PART NO 579010, PLUMMER BLOCK WITH BUSHING FOR DISCHARGE PART NO 6590, P BY BLOCK ASSEMBLY FOR HT SNUB DRUM PART NO 669010 Bid Details 2/45
COMPLETE DEFLECTOR DRUM ASSY 75KW PART NO CA637510, COMPLETE LT SNUB DRUM ASSY 75KW PART NO CALTSD7510, COMPLETE TANDEM DRV DRVN DRUM ASSY 650MM PART NO CA469010, COMPLETE HT SNUB DRUM ASSEMBLY PART NO CA629010, COMPLETE TAIL DRUM ASSEMBLY PART NO CATD9010, COMPLETE TAKE UP DRUM ASSEMBLY PART NO CATUD9010
Removing Bushes, Heavy Jungles, Sectioning and Leveling the Proposed Play Ground by Deploying JCB (Earth Moving Machinery) at Padmini Garden in Ward No.49.
ECHP-I- Operation of electromagnet in Conveyor-17 head end CBMS and removal metal pieces picked by the magnet under works contract from the date of entrusting of work and upto 31.03.2026.