Loading…
Loading…
13,555 results • Best match
Set of spares for RR20100 Compressor consists of 2 items as given below: 1) HP Cylinder Dia 100 as per ELGI Part No.070300540 - 1 No/Set 2) Piston & GP Dia 100 as per ELGI Part No. 00047770 - 1 No/Se
Set of Spares for RR20100 Compressor consists of 3 items as follows: 1) LP Cylinder dia 127 as per ELGI Part No.070200100 - 1 No/Set 2) Piston & GP Dia 127 as per ELGI Part No. 000477780 - 1 No/Set
SET OF PISTON RINGS FOR TRC 2507 COMPRESSOR CONSISTING OF SL.NO.1) PISTON RING SET DIA 197 TO ELGI PART No. 022401079 QTY/SET - 01 No, SL.NO.2) PISTON RING SET DIA 127 TO ELGI PART No. 072403479 QTY/S
MAIN COMPRESSOR WITH MOUNTING ACCESSORIES ALONG WITH MOTOR AS PER RDSO SPEC No. 1) RDSO/2018/EL/SPEC/0137 REV-0 0, 2) SPEC/E-10/3/09 MOTOR WITH AMENDMENT Nos. 01, 02, 03, 04 and 05. (SAFETY SLING
MAIN COMPRESSOR WITH MOUNTING ACCESSORIES ALONG WITH MOTOR AS PER RDSO SPEC No. 1) RDSO/2018/EL/SPEC/0137 REV-0 0, 2) SPEC/E- 10/3/09 MOTOR WITH AMENDMENT Nos. 01, 02, 03, 04 and 05 or Latest. FIRM'S
Set of spares for RR20100 Compressor consists of 2 items as given below: 1) HP Cylinder Dia 100 as per ELGI Part No.070300540 - 1 No/Set 2) Piston & GP Dia 100 as per ELGI Part No. 00047770 - 1 No/S
SET OF BRUSH HOLDER FOR AUXILIARY COMPRESSOR CONSISTING OF 2 ITEMS. (1) LEFT HAND BRUSH HOLDER CEC MODEL NO. ICF 150 PART NO. 1-09-04-05 (2) RIGHT HAND BRUSH HOLDER CEC MODEL NO. ICF 150 PART NO. 1-09
AOH kit for ELGI make RR20100 CG (M) compressor to ELGI Part No. 72403619 consisting of 32 items: (1) GASKET 0. 75C/CASE TO CYL TS05 to Part No. 00041004C-01 No. (2) GASKET 0. 75C/CASE TO 127CYL HV to
OIL SERVO PRESS 150 RR OF IOC ,HYCOM 150 P OF HPC AND MAK COMPRESSOR OIL 150 OF BPC(LUBE OIL FOR EXPRESSOR) USED FOR BG AND MG DIESEL ELECTRIC LOCOS. (OR EQUIVALENT BRAND AS APPROVED BY RDSO IN THEIR
Set of Cylinders for M/s. ELGI make compressor Model-RR-20100 of WAG9 loco. Each set comprising of 02 items in 03 nos. (1) LP Cylinder Dia127, ELGI Pt. No.- 070.200 100= 2 Nos. (2) HP Cylinder Dia 100
Set of Spares for RR20100 Compressor consists of 3 items as follows: 1) LP Cylinder dia 127 as per ELGI Part No.070200100 - 1 No/Set 2) Piston & GP Dia 127 as per ELGI Part No. 000477780 - 1 No/Se
Set of spares for ELGI make RR20100 Compressor consists of 2 items as given below: 1) HP Cylinder Dia 100 as per ELGI Part No.070300540 - 1 No/Set 2) Piston & GP Dia 100 as per ELGI Part No. 0004777
TTPS Operation Circle MPM II ACP Repairs and replacement of failed compressor in window AC split AC, air cooler, renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 08.10.18 to 31.03.19
TTPS Operation Circle MPM II ACP Repairs and replacement of failed compressor in window AC split AC , air cooler, renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 08.04.18 to 30.09.18
TTPS Operation Circle MPM II ACP Repairs and replacement of failed compressor in window AC split AC, air cooler, renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 08.04.19 to 30.09.19.
TTPS Operation Circle MPM II ACP Repairs andreplacement of failed compressor in window AC split AC, air cooler, renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 08.10.19 to 31.03.20
MTPS 1 TM Stage II Unit III IV Load testing of 2 ton capacity EOT crane movable 1 ton chain block trolleys and 1 TON Capacity Electrical Hoists in pumps Compressor and LP Bypass valves area for the year 2026 2027
CHAPATI MAKING MACHINE FCE600, BALL CUTTER MACHINE WITH COMPRESSOR
Decal, Ultra Oil - Coolant Oil for Rotary Screw Compressor
Supply of Valves and NRVs for IA/Pa compressor
supply of Gas Turbine Compressor cleaning fluid ZOK-27
TTPS Mech II BM Unit I II III Attending Breakdown works in HP valves actuators safety valves WB LRSB PRDS etc in Unit I II III boiler for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II TM I Breakdown works in boiler feed water system stator water primary secondary pumps hydrogen cooler booster pumps chemical dosing pumps and connected cooling water lines in units I II III for the period of work on or after 08 10
TTPS ES Circle EM II Dismantling Re erecting of power control cable panel to ground floor overhauling and Load Testing of 4 Nos 15 Ton capacity of electric wire rope hoist in various location of boiler area in Unit I II III and necessary testing
TTPS Mech II BM Unit V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year
TTPS Mech II BM Unit I II III Attending Breakdown works in HP valves actuators safety valves WB LRSB PRDS etc in Unit I II III boiler for the period from the date on or after 08 04 2020 and upto 30 09 2020
NCTPS I ES Circle EM II Dn SD I Time bound maintenance and breakdown works of HT and LT motors and their related local push button stations of Mill plant and Boiler area of all the three units at NCTPS I site for 360 days
TTPS Mech II BM Overhauling of sky climber air motor its auxiliaries in Unit I to V Boiler and conducting the load test of Electrical hoist in Unit III V to obtain test certificate from the Board competent person for the Year 2021 2022
NCTPS I ES Circle MRT Division SDn I II III Fixing Water Wall Soot Blower junction box enclosures Cable gland and Terminal blocks on Water Wall Soot Blower and Fixing of power and control cables gland for Turbine and Boiler side valves for all
TTPS Mech II TM I Breakdown works in boiler feed water system stator water primary secondary pumps, hydrogen cooler booster pumps chemical dosing pumps and connected cooling water lines in units I II III for the period from 01 04 2026 to 31 03
TTPS Mech II TM I Breakdown works in boiler feed water system stator water primary and secondary pumps hydrogen cooler booster pumps chemical dosing pumps and connected cooling water lines in Unit I II III for the period of work on or after 08.04.202
NCTPS I ES Circle EM I Dn S Dn IV Annual Overhauling of HT LT motors Boiler Feed pump motor 2B Condensate Extraction pump motor 2B Auxiliary oil pump motor MOT 2B Auxiliary cooling water pump motor 2A 2C Sea water booster pump mot
TTPS Mech II BM Unit V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year 2
TTPS ES Circle MRT I Annual Overhauling works in Boiler side Valves Dampers ID FD PA fans lub oil panels and Turbo Generator AC DC Lub Oil and Generator DC Seal Oil AC Seal oil system in Unit II for the year 2025 26
TTPS Mech II BM Unit V Renewal of worn out cladding sheet plastering and insulation from the critical pipe lines repacking of insulation wool plastering and cladding at various locations from 8 m level to 54 level in Unit V Boiler during overhaul for
TTPS Mech II BM Unit IV Renewal of worn out cladding sheet plastering and insulation from the critical pipe lines repacking of insulation wool plastering and cladding at various locations from 8 m level to 54 level in Unit IV Boiler during overhaul f
TTPS ES Circle MRT I A Preventive Maintenance works of Boiler Side Valves Damper actuators control panels in plant auxiliaries area pertaining to SUB DN I of MRT I in Units I II and III for the for the period from 08.10.2022 to 31.03.2023
MTPS I Mill Plant Unit III Inspection and replacing inverting of 8 Nos eroded Orifices dia 415 mm 2 Nos dia 406mm 1No dia 400mm 2Nos dia 410mm 2Nos dia 396mm 1No in coal pipes at boiler side 8 locations during AOH 2022 23
TTPS Mech II BM Unit I II III Attending Breakdown works in HP valves actuators safety valves WB LRSB PRDS etc in Unit I II III boiler for a period from the date on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II BM Unit IV Renewal of worn out cladding sheet plastering and insulation from the critical pipe lines repacking of insulation wool plastering and cladding at various locations from 8 m level to 54 level in Unit IV Boiler during 2021 2022
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year
TTPS Mech II BM Unit I II III Attending Breakdown works in HP valves actuators safety valves WB LRSB PRDS etc in Unit I II III boiler for the period from the date on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the ye
MTPS I Boiler Maintenance Providing one number Diesel Petrol driven Tata Sumo Mahindra Bolero Mahindra Xylo Chevrolet Tavera on hire basis for the official use of the EE BM MTPS I for the period of one year from the date of utilization of vehicle
NCTPS I ES Circle EM II Dn SD III Carrying out Time bound maintenance works for maintenance of adequate illumination in Boiler Mill and ESP SWGR area of all three units buildings and surrounding areas of FOPH DM plant AHP Chimney of NCTPS-I en
SP.109 NCTPS-II ES circle MRT Division Unit II Generator Turbine and Boiler areas and their Auxiliaries Time Bound Contract works for the Routine Maintenance of MRT equipment for a period of 360 Days upto 31 03 2026 from the date of taking over
TTPS MII TM I Breakdown works in boiler feed water system stator water primary secondary pump HC booster pumps chemical dosing pumps and connected cooling water lines in units I II III from the date of commencement of work and upto 31 03 2022
TTPS ES Circle Instn II Maintenance of Control panels of EAST Hitachi Upgraded DCS HIACS 5000M Pro Control Turbodem 9020 HP Bypass PRDS and STC of Unit IV V and maintenance of various Transmitters and Switches in Units IV V Boiler Turbine areas M
TTPS Mech II BM Unit IV Certain specified works to be carried out in different locations of Unit IV boiler in Final SH LTSH LTSH terminal tubes SH hanger tubes steam cooled wall tubes Eco hanger tubes Economizer coils etc during overhaul for the year
TTPS Mech II TM I Breakdown works in boiler feed water system stator water primary secondary pumps hydrogen cooler booster pumps, chemical dosing pumps and connected cooling water lines in units I II III for the period from 01 04 2025 to 31 03 2026