Loading…
Loading…
12,823 results • Best match
MTPS II CHP II Routine Preventive Maintenance works in Conveyors and Stacker cum Reclaimers Conveyor 8A 8B 10A 10B 11A 11B 12A 12B 13A 13B TTR 1 and 2 Flap Gates etc
ECHP-II- Upkeepment of conveyors by cleaning the Coal, coal powder and foreign materials etc., on walk ways, return belt, deck sheets, head end floor and tail end areas of conveyor-68
ECHP-I- Racking in and racking out of HT Breakers and LT modules recording of various parameters of running conveyor equipments, tracing of conveyors tripping and servicing of contactors in SS-III
MTPS II CHP II Charges for operation of conveyors 7 1 and 7 2 Drive House 9/1 and 9 2 Drive House Conveyor 8A 8B and SCR Machines I and II
ICHP- Dismantling, loading, transporting to workshop for repairing and reinstalling the reconditioned gear box in JT-3
650KW, 3.3KV, CONVEYING AIR COMPRESSOR MOTOR (Q3)
Flame scanner guide tube Assembly for Boilers
LTSH Tubes and Bends for 210MW Boilers
Custom Bid for Services - ASSISTANCE IN SERVICING OF COMPRESSORS (TA3000 & LPG COMPRESSORS) Similar Category Support Services
Supply of Spares for Exciter Gear Box and Erection in Ultra Flow Screen Series TUF 13
Repairing servicing of clarifloculator gear box arrangement with accessories components at keela vallanadu water treatment plant
Procurement of Main drive gear box reducer shaft for gravimetric feeder of XRP 1043 Bowl Mill
Premium Transmission make (or) Equivalent Cone Ring Coupling for Air Cooled Condenser (ACC) Fan Gear Box
Refurbishment of Gear Box KG71 in Unit1 of RBC Power House, Bhavanisagar as per Technical Specification
Supply of Transmission Oil required for Rolling Stock Gear Box Preventive Maintenance and Intermediate Overhauling Activity
NCTPS II M I Circle BM Unit II ESP Reconditioning of defective CERM gear box assembly
CS010100196-7.5 KW MAIN SLEWING GEAR BOX OF MTC- 7/8/9 DRAWING NO. SME-4519
CRUSHING SEGMENT-1 FOR PRIMARY CRUSHER, CRUSHING SEGMENT-2 FOR PRIMARY CRUSHER
TTPS Operation Circle CAD Unit I Annual Overhauling DG Set I Attending minor repair works, Dismantling and cleaning of heat exchanger, DM water tank and Replacement of coolant during the overhaul period
TTPS Operation Circle CAD Complete overhauling and replacement of Heat Exchanger Booster Pump Motors of 160 KW NGEF make motor 1A M10 150KW Crompton greaves make motor 1B M4 at HEBP area
Supply of Raw Material , fabrication, and Installation of Safety Exit all Metal door, installation of new FDU and associated heat exchanger, modification in ventilation ducting and replacement of radioactive pipelines at MPDD
Maintenance of existing borewell air compressor mini power pumps and submersible power pumps open well submersible motor including all labour charges and materials for attending leakages,Division No. 9 to 11 , 32 to 36 at Zone-III.
NCTPS I MII Circle AHP Dn UnitII PDFACS Renewal of corroded and worn out air compressor pipe lines and fixing of spares for PDFAC system in UnitII 3rd row Range from unitII ESP to Intermediate Surge Hopper
POH Maintenance kit for Air Compressor [Main] Type RR 20100 of M/s. ELGI make for 3 phase LOCO as per annexure attached, One set consists of 37 items 76 Nos. MAKE OFFERED BY FIRM IS "ELGI"
36 Months POH kit for MEMU air compressor Model No. 3 HC 55 as per OEM consisting of 43 items as per enclosed Annexure A in Sealed Transparent Polythene cover with packing list duly indicate S.No. Del
POH Kit for RR20100CG (M) air compressor for WAG-9/WAP-7 Locomotive as per ELGI Part No.072493269 (Consisting of 78 items annexure attached). Firm's offer: POH KIT RR20100CG(M) AS PER ELGI PART NO 07
Set of Kit spare parts (consisting of 14 items) as per annexure enclosed for Air compressor unit ELGI model TRC 2507 to ELGI Part No.072403399 for the maintenance of DEMU-DPC. Firm's Offer : Same as a
OIL FOR AIR COMPRESSOR FOR WDG4 AND WDP4 DSL LOCOS. "SERVO PRESS 100 RR" OF M/S.IOC. (AUTHORITY: MP.MI-15(REV.12) JAN-2019. (PAGE 8). THE OIL SHOULD BE PACKED IN 210 LITRES CAPACITY NONRETURNABLE NE
OIL FOR AIR COMPRESSOR FOR WDG4 AND WDP4 DSL LOCOS. "SERVO PRESS 100 RR" OF M/S.IOC. (AUTHORITY: MP.MI-15(REV.12) JAN-2019. (PAGE 8). THE OIL SHOULD BE PACKED IN 210 LITRES CAPACITY NONRETURNABLE NE
sets of spares (consisting of 02 items) for MEMU Auxiliary Air Compressor. 1) Piston with G.pin Dia 60 to ELGI Part no: 000478710-- Qty --01 no. 2) Valve Plate to ELGI Part no: 000330950 -- Qty--02 no
OIL FOR AIR COMPRESSOR FOR WDG4 AND WDP4 DSL LOCOS. "SERVO PRESS 100 RR" OF M/S.IOC. (AUTHORITY: MP.MI-15(REV.12) JAN-2019. (PAGE 8). THE OIL SHOULD BE PACKED IN 210 LITRES CAPACITY NONRETURNABLE NE
OIL FOR AIR COMPRESSOR FOR WDG4 AND WDP4 DSL LOCOS. "SERVO PRESS 100 RR" OF M/S.IOC. (AUTHORITY: MP.MI-15(REV.12) JAN-2019. (PAGE 8). THE OIL SHOULD BE PACKED IN 210 LITRES CAPACITY NONRETURNABLE NEW
Set of spare parts for Atlas Copco air compressor models no GA 160. One set is consisting of 02 items (a. Oil stop valve except valve housing part no X104145351 or equivalent Qty = 01 no b. Thermostat
Supply of Set of Pipeline and Pipe Fitting for unloader of Air Compressor Model no: TRC-2507 for 1400 HP DEMU/DPC. One set consisting of 04 items as per Annexure - A. Make: ELGI or Equivalent. Accepte
Set of spares (consisting of 02 items) for MEMU Auxiliary Air Compressor. 1) Piston with G.pin Dia 60 to ELGI Part no: 000478710-- Qty --01 no. 2) Valve Plate to ELGI Part no: 000330950 -- Qty--02 nos
36 Months POH kit for MEMU air compressor Model No. 3 HC 55 as per OEM consisting of 43 items as per enclosed Annexure A in Sealed Transparent Polythene cover with packing list duly indicate S.No. Del
Sets of spares consisting of 03 items for DEMU Air Compressor. 1) Set of Gasket Kit sealing to ELGI Part no: 072403419 (consisting of 15 items as per annexure - I)--Qty -10 Nos. 2) Oil Seal B50X72X12
Sets of condition based item for DEMU air compressor. 1) Bend suction pipe (Part no: 000320790) 2) Safety valve assembly 3/4 inch BSP (Part no:B841701) 3) Valve assembly drain 1/4 inch BSP (Part no: A
Set of gasket consisting of 02 items suitable for DEMU air compressor Model no: TRC2507. 1) Gasket dia 197 cylinder head to IC part no: 000455730 (Qty - 01 no per set) 2) Gasket dia 127 cylinder head
WORM WHEEL -MODEL NO-SNU 5 inch, WORM GEARBOX- MODEL NO-SNU 5 inch, WORM WHEEL -MODEL NO-SNU 6 inch, WORM WHEEL -MODEL NO-SNU 7 inch, WORM WHEEL -MODEL NO-SNU 8 inch, WORM GEAR REDUCER UNIT-MODEL NO-8 FSS, WORM GEAR REDUCER UNIT- MODEL NO-4 FSM
PROCUREMENT OF CONVEYOR BELTING AND NYLON CONVEYOR BELT
PROCUREMENT OF CONVEYOR BELTING AND NYLON CONVEYOR BELT
Three phase Brake induction motor with gear box (inline helical) of Capacity- 1 HP, 440 V, 50 Hz, 1430 RPM (Minimum). 2) Output RPM of the gear box - 30+/-5 RPM. Motor shall be flange mount and gear
Three phase Brake induction motor with Worm gear box of Capacity- 1 HP, 440 V, 50 Hz, Duty cycle-S4, Degree of protection IP55, Insulation class F , Gear box output RPM should be 10 -15 RPM. Motor sha
ECHPII Attending preventive maintenance works of electrical equipments in Primary Crusher HouseII Secondary Crusher HouseII.
Gear box, Motor and Drive Roll changing in Bellmer press at WWTP in TNPL Unit - II, Trichy.
Lathe Steel boring bar ISO standard designation SVQxL (Q3), CNC Lathe Steel boring bar ISO standard designation SDUxR (Q3), CNC Lathe Steel boring bar ISO standard designation SDUxL (Q3), Lathe Steel boring bar ISO standard designation SVQxR (Q3)
procurement of Rotary Gear box assembly Model WB 1E for WWSB of unit I and II
Supply of Lathe Section For Machnical Dept.
SUPPLY OF MECH WORKSHOP LATHE CONSUMABLE ITEMS