Supply and Erection of Conveyor Belt 35 Degree Carrying Idler Frames and Troughing Idler Rollers and replacement for a length of 200 metres from Tail end for Conveyor 54
SUPPLY AND ERECTION OF 1400 MM BELT WIDTH FABRIC STRENGTH 1750 KN per M 5PLY COVER THICKNESS TOP 5MM AND BOTTOM 2MM FR GRADE CONVEYOR BELT FOR CONVEYOR 17
MTPS I CHP I Preventive maintenance of manual segregation of coal from reject conveyor R1 and crushing and feeding through pipe duct to the running conveyor 8A1 and 8B1
MTPS I 4X210MW M II Circle Coal Handling System First Phase of initial Revamping Repair Rectification works of CHP entire Conveyor system by procurement and erection of conveyor belts
Removal, Cleaning, and disposal of spillage and accumulated coal, attending preventive mechanical maintenance works in the Conveyor 27 A 27B and monitoring the conveyor equipments round the clock etc
MTPS I CHP II M I Breakdown work preventive maintenance Attending Routine and Break Down Maintenance in Bunker Top including conveyors
MTPS I CHP II Routine preventive maintenance works in Conveyors 9A 9B 8A2 8B2 BFD 8A and 8B JT2 and TT1A
MTPS I CHP II Routine preventive maintenance works in Conveyors 9A 9B 8A2 8B2 BFD 8A and 8B JT2 and TT1A
ICHP- Operation of the electromagnets in Station A and B conveyors and removal of metal pieces picked up by the magnets.
MTPS I CHP II Breakdown work preventive maintenance Attending Routine and Break Down Maintenance in Bunker Top including conveyors 11A 11B
ICHP-Provision of rubber lagging over the pulleys in 1000mm, 1200mm, 1400mm width conveyors in Sub Dn.II Internal Coal Handling System.
MTPS I CHP II Removing of coal choking in the coal transfer chutes in SCR Machines I and II and Conveyors
MTPS I CHP II Breakdown work preventive maintenance works in conveyors 10A 10B BFD 9A and 9B JT 1 and JT2
ICHP- Operation of the electromagnets in Station A and B conveyors and removal of metal pieces picked up by the magnets.
ICHS Dn Replacement of existing damaged ACC sheets 6mm Thick and ACC ridges in the gallery of Conveyors 74B 5B sides
ICHS Dn Replacement of existing damaged ACC sheets 6mm Thick and ACC ridges in the gallery of Conveyors 4A 5A sides
MTPS I CHP II Routine preventive maintenance works in Conveyors 9A 9B 8A2 8B2 BFD 8A and 8B JT2 and TT1A
Fabrication and Erection of Dust Suppression Box in Pith Conveyors in Bagasse Yard at Pulp Mill - Mechanical in TNPL Unit - I
ECHP-II- Reconditioning of various size of impact idler rollers at Conveyors-69,70,71,72,73,48A B,RBFD-1A 1B at ECHP-II Division
MTPS I CHP II Removing of coal choking in the coal transfer chutes in SCR Machines I and II and Conveyors
MTPS I CHP II Periodical inspection and calibration of Electronic Belt weighers of coal carrying conveyors and Stacker Cum Reclaimer machines
Custom Bid for Services - Mine 2 Expansion Conveyors Lignite Bench Systems Outsourcing of Maintenance works Mechanical Electrical for 3 years period
Repair and Overhauling Service - Structural Reconditioning works in Conveyors of Mine1 NLC India Limited; NLC India Limited Neyveli; Yes; Buyer Premises
Customised White Cotton Boiler Suit. Size (M) -- specifications as per attached annexure (Q3), Customised White Cotton Boiler Suit. Size (L) -- specifications as per attached annexure (Q3), Customised White Cotton Boiler Suit. Size (XL) -- ... Cotton Boiler Suit. ...
TTPS Mech II BM Unit III Overhauling of wind box and SADC in Boiler during the year 2019 2020
Unit II - Cleaning of I and II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc., from Boiler area to debris yard for the period from the date on or after 08.10.2018 and upto 31.03.2019
Unit III - Cleaning of I and II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc., from Boiler area to debris yard for the period from the date on or after 08.10.2018 and upto 31.03.2019
Unit I - Cleaning of I and II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc., from Boiler area to debris yard for the period from the date on or after 08.10.2018 and upto 31.03.2019
Unit I - Cleaning of I and II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc., from Boiler area to debris yard for the period from the date on or after 08.04.18 and upto 30.09.18
MTPS I TM Unit III and IV Complete overhauling and painting of Instrument Air Compressors 3B and 4B
Supply of Inter Stage Cooler with Brass Baffles and cooler shells for IA/PA Compressors at KGTPS Maruthur
PROCUREMENT OF SPARES FOR INSTRUMENT AIR COMPRESSORS (122-K1-A/B/C) OF KIRLOSKAR PNEUMATIC MAKE AT COGEN
Procurement of Mop Coupling Spares for Hydrogen Pre Booster Compressors (206-K-120A/B) in REF-III, CPCL
MTPS I TM Unit III and IV Complete overhauling and painting of Instrument Air Compressors 3B and 4B
XTRA AIR--S G VAAYU EQUIPMENTS LLP Reciprocating Air Compressors - Electric Motor Driven 7 to 7.9 kg/cm2
MTPS I TM Unit III Complete overhauling and painting of Instrument Service Air Compressors IAC 3B SAC 3C
Secondary Separator Element, Part no: 250034-134 for sullair compressors, model no: LS 20S 200L AC. Make: SULLAIR.
Cooling fan to ELGI Part No.000218700 for ALCO Compressors. Firm's offer: Same as above-Make Brand: ELGI
Rear Fan Guard for RR20100 CG(M) Compressors to ELGI Part No. 070315440 FIRM'S OFFER MAKE/BRAND : ELGI
Primary Separator Element, Part no: 250034-122 for sullair compressors, model no: LS 20S 200L AC. Make: SULLAIR.
OIL RELIEF VALVE ASSY. TO ELGI PT.NO.A 07 0551/ KPC PT.NO.095.00256.50 , FOR UPGRADRD COMPRESSORS Firm's offer : ELGI
Intercooler safety valve guard for RR20100 compressors as per drawing no. Sr.DEE/RS/ED/PNEU-67 Make/Brand:Self
Secondary Separator Element, Part No: 250034-134 for Sullair Compressors, Model No: LS 20S 200L AC, Make: Sullair
Custom Bid for Services - Biennial Maintenance contract BMC of Instrument and Conveying air Compressors in AHS in NNTPS
ECHP-II- Attending Breakdown and Preventive mechanical maintenance of Primary Crusher-2A and 2B, BFD - 2A and 2B, BFD -3A and 3B, SFD-1A and 1B and RC - 2A, 2B, 2C and related equipments in Primary Crusher House-II
Battery operated hand drilling machine, Pneumatic riveting gun with portable air compressor, Cargo packing lashing tool along with belt (4 m length)
MTPSI Mill Plant Unit II Complete overhauling of gearbox Mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc.
1250MM DIA X 2700MM LONG IDLE PULLEY FOR 2400MM CONVEYOR SYSTEM. (Q3)
Supply and Erection of spool piece TOP for Conveyor 73 discharge chute
Supply and Erection of SS 304 Grade Seal Plates for Conveyor 49