Construction of New Control Room for Utility Boiler II at MFL
Supply of COMPLETE COUPLING ASSEMBLY AND FASTENERS FOR BOILER FEED PUMP
VVVF Drive for Boiler freight cum Passengers Lifts 1360 Kgs capacity
Supply of Materials for rewiring purpose at boiler area unit I
Servicing of DTP valve in Recovery Boiler#3 at SRP-Mechanical
Supply of Boiler Burner Tilt Pneumatic Actuator for Unit-I II.
BOILER FILL PUMP ASSEMBLY AND HOT WELL MAKE UP PUMP ASSEMBLY
Supply of Spares for fuel firing system in Unit V Boiler
Supply of Saw Cut Fins for Radiant roof tubes in Boiler
supply of various sizes of spare bends for boiler reheater coils
Supply of Fire Crete Super for Boiler Furnace Use Make ACC
SS Wire Mesh with suitable end finishing for Unit-I Boiler.
SUPPLY OF ROTARY AIR LOCK VALVE FOR BOILER FLYASH DUST COLLECTOR
Spares for Boiler Feed Pump (BFP) and Booster Pump (BP) (Q3)
Hand Operated Gate Valves Internal Spare Parts for Boiler Pressure Parts
Overhauling of Intermediate pressure Boiler Feed Pump no 2 at KGTPS
Repair and Overhauling Service - Thermal Power Station; Boiler; No; Buyer Premises
Supply and Erection of Nylon Nylon conveyor belt 1400 mm Belt Width of fabric strength 800KN per M 5Ply cover thickness 5 by 2mm and FR grade for Conveyor 14
NCTPS I SE M II Circle ECHS Dn Strengthening of existing severely damaged corroded structure of feeder conveyor trailer conveyor rocker assembly and head pulley frame of wagon loader I
NCTPS I MII Circle ECHS Dn. Released the steel cord belt from BCN 63 and transporting, laying, joining the belt in the conveyor BCN 52 and normalizing the conveyor system
MTPS I BM Pressure parts Units I and II Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning air washing of Boiler structures and floor and allied works for the period of 120 days from the date of commen
MTPS I BM Pressure parts Units III and IV Boiler Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism cleaning and air washing of Boiler structures and floor and allied works for the period of 120 days from the date of co
Unit II - Strengthening of structural supports, rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul 2018-19
Unit IV - Strengthening of structural supports, rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul 2018-19
Unit II - Cleaning of I and II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc., from Boiler area to debris yard for the period from the date on or after 08.04.18 and upto 30.09.18
Unit III - Cleaning of I and II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc., from Boiler area to debris yard for the period from the date on or after 08.04.18 and upto 30.09.18
TENSION END CASING WITH WIPER ASSEMBLY FOR BED ASH CONVEYOR F1, F2 AND R1
Feed Water Pump with Motor for Boilers As per CFA Speciifcation No. SPE/ME/BH/84 dated 30/06/2023 (Q3)
Custom Bid for Services - Replacement of damaged water wall tubes and panels in Stage I and II boilers of TPS II
Custom Bid for Services - Replacement of Economizer coil bends in Boilers 1 2 3 of Stage I Units of TPS II
" TAPER ROLLER BEARING NO.32212 FOR OUTPUT SHAFT OF ROTATOR GEAR BOX. MAKE:SKF/FAG/NTN/TIMKEN." SPECIAL CONDITIONS:1. VENDORS ARE REQUIRED TO QUOTE ONLY FOR THE BRANDS THEY ARE APPROVED FOR, THE OFF
Air conditioning compressor of 1.5 TR capacity, hermetically sealed, Rotary type, refrigerant
Renewal of damaged HP valves and worn out boiler tubes in steam / feed water lines of boiler during the annual overhaul 2018-19
ECHP-I- Replacement of wornout purling and tressel iron and steel structure by a new one and painting of newly erected purling and tressel iron and steel structure in Secondary Crusher top roof south side portion at Secondary Crusher House-I.
INFEED CHAIN CONVEYOR MODIFICATION WORK IN CHIPPER HOUSE AT TNPL UNIT II, TRICHY.
INFEED CHAIN CONVEYOR MODIFICATION WORK IN CHIPPER HOUSE AT TNPL UNIT - II, TRICHY.
SUPPLY OF ALLOY STEEL CHAIN FOR UNIT IV and V SCRAPPER CONVEYOR FEEDER
Cylinder liner kit for KC4 compressor Part No. 070852810 (Q3), Spare for KC4 Kirloskar make compressor Part No. 07 3364040150, Cylinder liner (Q3)
1. CENTRE IMPACT IDLER OF SIZE 219.1mm DIA X 530mm LONG FOR 2400mm Conveyor, 2. SIDE IMPACT IDLER OF SIZE: 219.1 DIA X 1000MM LONG FOR 2400MM CONVEYOR, 3. STRAIGHT ROLLER OF SIZE 219.1MM DIA X 3000MM FOR 2400 MM CONVEYER, 4. IMPACT IDLER OF SIZE ... 2000MM CONVEYOR , ... MM CONVEYOR , ... 2400mm CONVEYOR
TTPS Mech II BM Unit II Replacement of boiler pressure parts tubes and bends in I pass in Unit II Boiler during overhaul for the year 2019 2020
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes etc
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and boiler roof area etc
TTPS Mech II BM Unit III Renewal of damaged HP valves and worn out boiler tubes in steam/ feed water lines of boiler during the overhaul 2025 2026
Cleaning of Coal bunker in Power Boiler 1 to 7 and cleaning of Clinker, Bed Material in Power Boiler 4 to 7 at Energy dept., TNPL Unit I
MTPS I BM Unit II Boiler pressure parts AOH 2023 Cutting and replacement of passing defective boiler drum safety valve (WB 1740) and allied works during AOH 2023
TTPS Mech II BM Unit II Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2021 2022
TTPS Mech II BM Unit III Replacement of boiler pressure parts tubes and bends in II pass of Unit III Boiler during overhaul for the year 2023 2024
TTPS Mech II BM Unit II Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2023 2024
TTPS Mech II BM Unit II Renewal of damaged HP valves and worn out boiler tubes in steam feed water lines of boiler during the overhaul 2025 2026
MTPS I BM Unit II Boiler pressure parts COH 2024 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and boiler roof area etc