Procurement of Conveyor Body Liners for Coal Mill from Unit 1 to 6.
Procurement of rollers for Apron Feeder and Dribble Conveyor installed at CHP, RTPS
Lagging of different conveyor drums by cold vulcanizing process at Bhojudih Coal Washery.
Proposal for site preparation for Installation of Belt Conveyor at Jhanjra Project Colliery
Lagging of different conveyor drums by cold vulcanizing process at Bhojudih Coal Washery.
ARC for Refurbishment of different types of pulley for conveyor at CHP, KTPS
Dismantling of Conveyor Structure and allied structure Including CHP at Tilaboni UG Mine.
Repairing of conveyor belt for Atlas Copco make CHP no.B at Damagoria Colliery.
Domestic open e-tender for procurement of different types of PVC Conveyor Belting.
Repairing of tail drum structure of Horizontal belt conveyor of Bhojudih Coal Washery
Maintenance of Conveyor feeding to ROM Screen No.-2 at Bhojudih Coal Washery
Dismantling conveyor 33A/B gallery with the help of mechanized process at STPS.
Repairing of tail drum structure of Horizontal belt conveyor of Bhojudih Coal Washery.
Repairing of 05 nos. different size drive conveyor drum at Bhojudih Coal Washery.
MODIFIED SAND CONVEYOR TRAP ASSEMBLY TO RDSO DRG. NO. SK.DL-2148 specn: 17300331
9040M26B42 PROCUREMENT OF SLAT CONVEYOR CHAIN FOR BITUMEN FILLING STATION IN HALDIA REFINERY
Roller Conveyor Chain, Plasser Part No. SU-3" P, Make: Plasser, Rollan, MP.
Construction of Concrete road for Coal transportation from ICL crusher point to CHP under Sonepur Bazari Area ECL
Procurement of Crusher internals like Screen plates, kick off Plates, Breaker Plates for crushers installed at CHP,STPS
Erection of HT line 6.6kV grade from near New CHP to new mobile crusher at Sonepur Bazari Project.
Procurement of Clinker Crusher Complete Assembly for Unit 2 OH Scheduled in 2024 under AHP-MM,Stg-1
SUPPLY AND DELIVERY OF ECCENTRIC CRUSHER ASSEMBLY FOR OVERHAULING OF AHP OF UNIT 5 UNDER AHP MM KTPS
SUPPLY AND DELIVERY OF CAGE FRAME FOR CRUSHER-1 and 2 AT CHP, UNDER CHP-M/M, KTPS
Loading of 1,00,000 Te of Coal into Tippers by pay-loaders at the Crusher Point of Jambad OCP
Repairing of Apron Feeder Chute -01 no. of Crusher-Apron feeder unit-02 at CHP, S. B. Project.
Procurement of End Disc and Center disc for Crusher of stage#I and stage#II at Chp,KTPS
Installation of 200W LED light fittings for crusher, weighbridge, Loading unloading point at Bonjemihary colliery under Salanpur Area.
Procurement of Bearing for Crusher RG 733H Rotor Shaft Assembly at CHP MM Department STAGE II SGTPP WBPDCL
Procurement of Kick off plate for Crusher for Coal Handling Plant Stage I AND II at SGTPP WBPDCL
2nd Stage Gear (Part No. 302) for triple stage bevel helical gearbox of type & size CKC-450 with 31.5:1 nominal ratio
Tepper Gasket, Fan Belt New Model, Pressure Plate OM, Clutch Master Cylinder Assy, Gear Lever Kit, Speedometer Cable, Gear Box Seal, Transfer Case Seal, Front Hub Oil Seal, Rear Wheel Seal, Air Compressor Gasket, Fuel Pipe 19x19, Radiator Hose Pipe, Coolant Hose, Cabin Lifting Pipe, Wiper Blade, Centre Bolt, Rubber Hose, Front Brake Actuator, Rear Brake Booster
BOILER AND AUXILIARY EQUIPMENT WASHING WITHIN 48 HRS. OF SHUTDOWN AND BOILER GROUND FLOOR CLEANING WITHIN 07 DAYS OF SHUTDOWN FOR OVERHAULING OF UNIT-5 AND 3 AT BKTPP
BOILER AND AUXILIARY EQUIPMENT WASHING WITHIN 48 HRS. OF SHUTDOWN AND BOILER GROUND FLOOR CLEANING WITHIN 07 DAYS OF SHUTDOWN FOR OVERHAULING OF UNIT-4, 2, 1 AT BKTPP
Custom Bid for Services - Annual Rate Contract of Boiler and Boiler auxiliaries of Unit12 2X500 MW of DSTPS DVC ANDAL Similar Category Customized AMC/CMC for Pre-owned Products
Annual Maintenance of electrical installation at Haringhata Diary for the year 2025-2026 -- Repairing and maintenance of KC - 4 Ammonia Compressor make Kirlosker Ammonia Compressor.
Annual Maintenance of electrical installation at Haringhata Diary for the year 2024-2025 -- Repairing and maintenance of KC - 4 Ammonia Compressor make- Kirlosker Ammonia Compressor.
Supply and installation of Complete set of two (2) numbers of feed Pump for Boilers installed at JK Unit of Siduli Colliery
Supply and fitting of 65mm CI double post high lifted safety valve AND steam wheel valves for boilers at Khas Kajora Colliery
Unbranded Very Light Grade - VG5 General Purpose Machinery and, Unbranded Very Light Grade - VG5 General Purpose Machinery and Spindle Oils in Drum
Custom Bid for Services - Conveyor belt insertion, vulcanization, repair and pulley lagging at LDCP & BOF Similar Category Customized AMC/CMC for Pre-owned Products
Transportation , changing and salvaging of three Reels i,e, . 600 Meters ( 200 Meter each Reel) 1200 mm, Type -6, PVC conveyor belting in old 2nd belt conveyor of MIC unit of J.P.Colliery
Cleaning Spillage Coal and debris at 21R belt conveyor (21R/27L to 21R/21L) and 21EL belt conveyor (21D/21L to 23D/21L) in R-IV Seam of Khottadih Colliery, Pandaveswar Area.
ANNUAL CONTRACT FOR CHAIN CONVEYOR INSPECTION, MINOR WORKS FOR CONVEYOR AND OTHER MACHINERIES, ASSISTANCE IN VARIOUS MAINTENANCE WORKS AND MAINTENANCE OF ALL PNEUMATIC SYSTEM INCLUDING VALVE, CYLINDERS, ETC LPG BOTTLING PLANT, RANINAGAR
Repairing and replacement of pressure drum at TB 1 belt discharge point and other repairing and replacement job releated to conveyor Belt in different conveyor Belt (as per BOQ) at Shankarpur Colliery
Custom Bid for Services - Rate Contract for Third Party Testing of Conveyor Belt Samples at NTH Kolkata for the Conveyor Belts to be supplied for CHP U 18 MTPS DVC through GeM
AIR FILTER ELEMENT FOR ELGI MAKE SCREW COMPRESSOR, ELGI PART NO. B004700770036, ELEMENT PRIMARY SEPARATOR FOR ELGI MAKE SCREW COMPRESSOR, ELGI PART NO. B006700770023, OIL FILTER ELGI P. NO. -B004800770001, COUPLING ELEMENT FOR ELGI MAKE SCREW ... SCREW COMPRESSOR , ... SCREW COMPRESSOR , ... SCREW COMPRESSOR , ...
Overhauling of Boiler and its auxiliaries of 210 MW Unit2, MTPS,DVC
OVERHAULING OF BOILER PRESSURE PARTS OF UNIT-4 DURING OVERHAULING AT BKTPP
ARC for attending Boiler Tube Leakage and other allied works at STPS.
Service Contract for Unit-5 Boiler Pressure Parts Overhauling under BMD, STPS