Loading…
Loading…
971 results • Best match
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
Portable Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
ICU Ventilators (V2) (Q2)
STATUS MEDICAL EQUIPMENTS Uroflowmetry System having Warranty 5 year
High End Intra operative Ultrasound for Surgeries (Ultrasound Machine)
Medical equipment for CSR Activity at Mohali ASF
Supply of medical equipment at North frontier locatio
Portable X - Ray Machine (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7126122 Dated : 19-01-2026 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : IOCL-Gujarat Refinery IOCL- Gujarat Refinery, INDIAN OIL CORPORATION LIMITED, INDIAN OIL Corporation Limited, Ministry of Petroleum and Natural Gas (Iocl-gujarat Refinery) UIN Number NCTGC2415P
Portable Ultrasound
Defibrillator (Q2) (3 (3 ))
Biphasic Defibrillator Cum Monitor
Defibrillator (Q2) ( ( 3 3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Automatic External Defibrillator (AED)
Automatic External Defibrillator (AED)
Automatic External Defibrillator (AED)
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Cardiac Monitor with defibrillator
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Defibrillator (Q2) (3 (3 ))
Multipara Monitor - Low End (Q2), Electrocardiography (ECG) Machine (V2) (Q2), BP APPARATUS, BED SIDE STOOL, BED SIDE LOCKER, EMERGENCY CRASH CART, DRESSING TROLLY, ELECTRICAL SUCTION MACHINE, INFUSION PUMP, INSTRUMENT TROLLEY, FULL FOWLER BED, MAYO ... FOLDABLE, ECG MACHINE TROLLEY, ...
Portable Ventilator (Q3)
ICU Ventilator (Q3)
MRI 3T Scan System (Q3)
MRI Compatible Multipara Monitor (Q3)