Loading…
Loading…
14,524 results • Best match
OFC Laying and other associated works between Numaligarh-Jorhat (rehabilitation works)
FIBER OPTIC CABLE ASSEMBLY
TRANSMITTER/RECEIVER FIBER OPTIC
FIBER OPTIC CABLE BOOT
Optic fiber Transmitter/Receiver
PROCUREMENT, DIGGING, LAYING AND COMMISSIONING OF 18 KMS OFC CABLE WITH ACCESSORIES
Restoration of Berms (damaged) due to laying of optical fibre by Jio Reliance Company on right side of App Shambu Road in Upper Roop Nagar, Housing Colony, Jammu
GROUP-A-PART I DESIGN, SUPPLY, INSTALLATION, CUSTOMIZATION,CALIBRATION, TESTING AND COMMISSIONING OF AN OPTICAL FIBRE BASED PIDWS AND PART II AMC for 5 year of part I
Supply of Perforated G.I. pipe of 100 mm dia with socket, optical fibre joint closure and double walled corrugated pipe 6 mtr in length as per item description.
OFC Construction works in Sec-4 of Hangal - Hirekerur OFC Route
OFC Construction works in Sec-4 of Kanakapura - Malavalli OFC Route
OFC Construction works in Sec-2 of Hangal - Hirekerur OFC Route
OFC Construction works in Sec-1 of Kanakapura- Malavalli OFC Route
OFC Construction works in Sec-3 of Hangal - Hirekerur OFC Route
OFC Construction works in Sec-2 of Kanakapura - Malavalli OFC Route
OFC Construction works in Sec-5 of Kanakapura - Malavalli OFC Route
OFC Construction works in Sec-3 of Kanakapura - Malavalli OFC Route
OFC joint Closure, Patch Cord, OFC Sleeves, Isopropyl, Plan Rosette Box
ERECTION AND COMMISSIONING OF SIMPLEX TYPE 220KV AND 132KV FEEDER CONTROL AND RELAY PANEL WITH ETHERNET SWITCH AND OPTICAL FIBER AT 220KV SUBTSTION CHANDAUSI UNDER ETD SAMBHAL
DESIGN REIVIWE SUPERVISION AND PROJECT MANAGMENT CONSULTANCY FOR BALANCE WORKS OF IMPLEMANTATION OF EQUITABLE WATER SUPPLY SYSTEM (24X7) AND CONSTRUCTION OF OPTICAL FIBER DUCTS IN PUNE CITY
SLA Based OFC Route Maintenance and OFC improvement work under DE CNTx (W), OFC (Mtce.) Yavatmal FRT at Pandharkawda
E-tender for SLA based OFC maintenance and OFC improvement work under DE CN-Tx (W), OFC Mtce. Nagpur
CCTV camera CP plus PTZ 2MP IP 25X, CCTV camera CP plus 2MP 6MM Bullet, CCTV camera CP plus 4MP 3.6MM Bullet, CCTV camera CP plus 4MP 3.6MM Dome, NVR 16 port CP plus 4K double SATA, NVR 32 port CP plus 4K double SATA, Hard disk 4TB surveillance, D ... 1000, Optical fiber cable 12 ... core, Optical fiber cable 6 ... 9U, Optical fiber patch ... adaptor, Optical fiber splicing, ... copper, OFC cabling ...
Deposit work 2020-21for Restoration of Road cutting on Edathirinji katoor road 6/200 to 6/300 and karuvannur katoor road in ch 9/100 to 11/750 km of PWD roads section Irinjalakuda under road subdivision Irinjalakuda for OFC laying and MH installation
Custom Bid for Services - Laying PLB Pipe Duct and Associated Works by HDD or Open Trench Method, Optical Fibre Cable Pulling/Blowing and Splicing Works etc IN NASHIK BA OF BSNL MAHARASHTRA to restore faulty BBNL Incremental OFC to activate pending.. ... – OFC Network ...
LAYING OF OFC (Q3), SPLICING OF OFC CORE (Q3)
E- Tender for 58.4 Kms 12F/24F/48F/96F/288F OFC Laying PLB pipe/Duct and Associated work ,O FC Pulling/Blowing and Splicing works etc., for Rehabilitation/Development/Patch work in existing O FC route at different plac
Restoration of B T Road at 23rd kmp ch due to cutting done by jio Digital Fibre P Ltd for laying optical fibre cable under Kolkata North Division PWD in the District of North 24 Parganas during the year 22 23
Co Laying of PLB pipe,Duct and Associated works by Open Trench Method,Trenchless Technology, Optical Fibre Cable Pulling,Blowing and splicing works etc., in NFS Common Trench, for patch works at different places in NTR Jhansi to Mauranipur Panwari48F
Restoration of road cut made by PRESTO for laying Optical fibre cable from Bakargarh Border to Gobona Village Issapur Village Road to Majri Village Issapur Village Pusa Farm to Badli Village Issapur Nahar Road to Majri Village Main Dhansa Border Deve
Restoration work of damage done by JIO Digital due to cutting of mastic Asphalt on Dum Dum Road near Seven Tanks more for laying Optical Fibre Cable by Open Trench method under Kolkata North Division PWD during the year 23 24
Restoration of road cut made by PRESTO for laying Optical fibre cable from Kair Rd., Mundhela Khurd, Delhi, MCD School Mundhela Khurd Village Mundhela Khurd Village to Crossing Nala Near Luksar Village (HR) Mundhela Khurd Village to Crossing Nala Mun
NETWORK SWITCHES, Fiber switch gigabite, SFP, optic fiber cable 12 core frp supreme starlight, CAT 6 cable drum digisol, Rack 4U dlink, Rack 12U dlink, io Boxes, Fiber optic patch panel, patch cord, pig tail
DE OFC/CNTXW KPR/KPR OFC MTCE /2022-23 Dt 25.02.23
DE OFC/CNTXW/PNS/PNS OFC MTCE/2022-23 Dtd 20.03.23
DE OFC/CNTx-W/SAN OFC MTCE/23-24 Dt 22.12.23
DE OFC/CNTXW/LTR/LTR OFC MTCE/2022-23 Dtd 02.03.23
DE OFC/CNTXW/ANR/SRM/OFC MTCE/23-24 Dt 23.05.23
DE OFC/CNTXW/PNN/OFC MTCE/2023-24 Dt the 28.04.23
DE OFC/WTR/LTR/OFC MTCE/2020-2021/4 Dated 28.12.2020
DE OFC/CNTXW/SAT/SAT OFC MTCE/2022-23 Dtd 02.03.23
DE OFC/CNTXW/ANR/OFC MTCE/2023-24 Dtd the 13.07.23
OFC rehabilitation / OFC Patch work in Udaipur OA (Ghata-Kuntha-Mungana)
Supply and Installation of OFC & E1 Integrated Device with OFC ports
Supply of SMPS, OFC Termination Box, OFC, Media converter, HDD etc
DE OFC/CNTXW/PNS/BMT OFC MTCE/2023-24 Dt 04.11.23
DE OFC/CNTXW KPR/SAN OFC MTCE /2022-23 Dt 25.02.23
Electric Cabling Service - 24 CORE ARMOURED CABLE; OFC; 24 CORE OFC
E-Tender Enquiry document for Laying of PLB pipe/ Duct and associated works by Open Trench Method/Trenchless Technology ( HDD) , Optical Fiber Cable pulling/Blowing and splicing works etc.for Rehabilitation of WTR patch works in AMBIKAPUR BARIYO 12 2
E-Tender Enquiry document for Laying of PLB pipe Duct and associated works by Open Trench Method Trenchless Technology HDD Optical Fiber Cable pulling/Blowing and splicing works etc for Rehabilitation of WTR patch works in Katghora-Pasan-Pend