Loading…
Loading…
1,597 results • Best match
SPLICE MACHINE FOR OFC CABLE JOINING (Q3)
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable route at different places in Dala-Rbts OFC route
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable route at different places in Dala-Htnl OFC route
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable route at different places in AD -MRZ OFC route
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable route at different places in AD-KP OFC route.
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable route at different places in MJN-BND OFC route
Annual Maintenance Contract for all Railway owned optical fiber cable between PT. Deen Dayal Upadhyaya to Prempur section including Naini to Manikpur and Chunar to Chopan section for Two years.
Custom Bid for Services - LAYING OF OFC CABLE
OFC cable 6 core fiber single mode armoured
OFC cable 6 core fiber single mode armoured
Laying of PLB pipe/ Duct and associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes in Kanpur-Unnao OFC Route.
Electric Cabling Service - OFC LAYING OF 1100 METER; OFC LAYING OF 1100 METER; 10 sq. mm to 100 sq. mm
E-Tender for Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fiber Cable Pulling/Blowing and splicing works etc., for NTR Patch Work Agra Division
VINYTICS Plastic fiber optic cable and Step index fiber optic cable and, VINYTICS Plastic fiber optic cable and Step index fiber optic cable and Multimode fiber optic cable Kit For Educational Purpose
Unitec Plastic fiber optic cable and Multimode fiber optic cable Kit, Unitec Plastic fiber optic cable and Multimode fiber optic cable Kit For Educational Purpose
OFC Cable, Exchenge Inverter, EPBAX Digital DB HF 50 Complete, Nails for Patti, Insultion Tape, Flexible Pipe, Adoptor, U Clip, Hooter, Casing Cape, Casing Cape Mait
Fiber optic networking
OFC Laying work in Lakhaothi Block under NOFN Project
Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes at different places in Allahabad Division.
Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes at different places in Varanasi Division.
Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes at different places in CNTX Varanasi Division.
Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes at different places in CNTX Allahabad Division
Supply of HDMI Optical Fiber Cable Length 20 meter make Impression or Similar with following technical specifications 1)Support- 4K 2) Version V2.0 3)Band Width -16 Gbps 4)Plug and play device no
Supply of HDMI Optical Fiber Cable Length 20 meter with following technical specifications. (1) Support- 4K. (2) Version V 2.0. (3) Band Width - 16 Gbps. (4) Plug and play device no external power s
optic fibre cable (Q3)
E-Tender for Laying PLB pipe Duct and Associated work by Open Trench Method Trenchless Technology Optical Fibre Cable Pulling Blowing and Splicing works etc for Patch work in existing Optical Fibre Cable route at different places.
Supply 6 core OFC Cable (Armoured) as per annexure-A enclosed.
Fiber Optic Patch Cord
Fiber optic CCD spectroradiometer
Fiber Optic Fusion Splicer
Fiber Optic Patch Cord
Fiber Optic Patch Cord
Fiber Optic Fusion Splicer
Fiber Optic Patch Cord
Fiber Optic Patch Cord
Fiber Optic Fusion Splicer
Fiber Optic Patch Cord
Fiber Optic Fusion Splicer
Fiber Optic Patch Cord
Fiber Optic Patch Cord
Fiber Optic Patch Cord
KEYBOARD MOUSE COMBO, OPTICAL FIBER CABLE
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes at different places in Ayodhya Division
Laying of PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc., for patch works in existing Optical Fibre cable routes at different places in Gorakhpur Division