Loading…
Loading…
10,908 results • Best match
IMPROVEMENT OF STRUCTURAL HEALTH OF A FOUR STORIED BUILDING (BLOCK-M), PAINTING AND OTHER ANCILLARY CIVIL WORKS AT TALLAH PUMPING STATION UNDER WATER SUPPLY DEPARTMENT.
Repairing painting along with other ancillary works at Flat No 4B and 5A at Ministers Residence under Alipore Division PWD during the year 2026 27
Repairing painting along with other ancillary works at Flat No 2A and 3B at Ministers Residence under Alipore Division PWD during the year 2026 27
PAINTING OF ROAD MEDIAN AND KERB STONES ALONG P.A. SHAH CONNECTOR FROM SAFUI PARA CROSSING TO GANGULY PUKUR MORE IN WARD NO. 105, BR.-XII.
Repairing, fitting, fixing and painting the load body and driver cabin of the Tipper Truck vide no. WB-25E-1190 under Dhapa Garage, SWM-II
Emergent Repairing and painting to the chamber of Accounts officer and HOD Dermatology in ground floor of STM main building,during the year 2024-25.
Dismantling Work, Removing Distemper, Plastering work, Putty, Painting, Tile work, Structural Steel Work, Aluminium work, Insulation work, Aluminium composite panel (ACP) work, Plumbing Work etc.
REPAIRING AND PAINTING OF POND SIDE PARK WITH ALLIED WORKS AT MANASHA ROW BOROPUKUR, PAUL PUKUR, NONA PUKUR ETC IN WARD NO-136, BR-XV.
PAINTING OF KERB AT BIDHAN SARANI FROM SHYAMBAZAR 5-POINT CROSSING TO M.G. ROAD CROSSING UNDER BR.-II and IV FOR ENSUING G-20 SUMMIT.
Repairing and renovation work with Plastering, Colouring and painting and plumbing sanitation work at Naihati Fish market building in ward no. 28, under Naihati municipality.
Repairing and painting of Female word at Swrgery Building in gorund floor under R G Kar Medical College and Hospital during the year 24 25
PAINTING AND REPAIRING MISLENIOUS CIVIL WORK OF HAJI RAISUDDIN KMCP SCHOOL AT R-22 MASJID TALAB LANE, KOLKATA -24 IN WARD NO-137, BR-XV.
Repairing and maintenance of painting Boundary wall and chain link fencing and repairing pathway at DB Park within Ward No. 39 under Bidhannagar Municipal Corporation.
Repairing and painting of the second and third floor corridor (back side) with the two rooms at Darbhanga Building, College Street Campus , University of Calcutta.
Repair works including painting in ground floor of Judicial Quarter within the compound of Uluberia Court of Uluberia Dist. Howrah during the year 2025-26.
Painting cleaning and other miscellaneous work in connection with State Program at Gandhighat on 15th August 2023 under Barrackpore SubDivision I PWDte During 2023 24
Renovation, repairing of roof shed of Filter-house including painting of structures in Water Treatment Plant at Panihara, Madhyamgram . Renovation ..Madhyamgram municipality under AMRUT 2.0
Exterior painting of Academic building,Administrative building,Student activity building and Sub Station with necessary allied work of Bankura University, in the district of Bankura.
Painting of Motor Control Centre cum Logic control Panel including pumping machinery for Firefighting arrangement at Ganga Sagar in connection with Ganga Sagar Mela 2024
Repairing painting along with other ancillary works in Flat No 7A and 10B at Ministers Residence under Alipore Division PWD during the year 2026 27
Thorough repairing and painting the inside area of room no 1,2,3,5,12,13 and 14 of P G Lady Student Hall at Radhanath Bose Lane Kolkata -06.
REPAIRING AND PAINTING OF ROOM NO 9 AND ROOM NO 16 OF CHEMISTRY DEPARTMENT AT GROUND FLOOR OF PBUILDINALIT G AT RAJA BAZAR SCIENCE COLLEGE.
WASHING and PAINTING OF GUARD RAILING INCLUDING VERTICAL KERB AT A.J.C BOSE ROAD FROM CROSSING OF S.N BANERJEE ROAD TO RIPON STREET UNDER BR- VI
Painting Block Letter on Existing WBSEDCL Cement Concrete Street Light Pole at verious loction of 01-05 No. Wards under the jurisdiction of Bolpur Municipality.
Painting Block Letter on Existing WBSEDCL Cement Concrete Street Light Pole at verious loction of 06-10 No. Wards under the jurisdiction of Bolpur Municipality.
PAINTING OF ROADSIDE KERB STONE AT DOCTOR LANE, DURGA CHARAN DOCTOR ROAD, NEOGI PUKUR BYE LANE, TALTALA LANE AND ADJACENT AREA IN WARD NO. 53
Repairing painting along with other ancillary works at Flat No 1A and 1B at Ministers Residence under Alipore Division PWD during the year 2026 27
Repairing and painting of cabin body, load body, dala portion etc. of vehicle no. WB25E-0571 (TATA 1616) of Dist-II Garage under SWM-II
Repairing and Painting (External) of the Office of ADM and DL and LRO, Murshidabad to be executed by Executive Engineer, Murshidabad Division, Social Sector, P.W.Dte.
PAINTING OF ROADSIDE KERB STONE AT OCTOR LANE, DURGA CHARAN DOCTOR ROAD, NEOGI PUKUR BYE LANE, TALTALA LANE AND ADJACENT AREA IN WARD NO. 53
Annual Maintenance and Repairing of Street Light other Lighting within Ward Lane Bye Lane including painting of S.T. Pole for Ward No-57 under HMC.
PAINTING OF KERB STONES AT DIFFERENT PORTIONS OF DR. S BANERJEE RD, LAKE TERRACE, SOUTHEND PARK, BALLYGUE STATION RD AND OTHERS IN WD NO. 090
Annual Maintenance AND Repairing of Street Light other Lighting within Ward Lane Bye Lane including painting of S.T. Pole for Ward No-53 under HMC.
Repairing Painting and other allied works at Purulia Construction Sub Division under Purulia Construction Sub Division of Purulia Division PWD during the year 2024-2025
Painting of interiors (with Wall Putty) and allied works of O/o the Assistant Director, Consumer Affairs and Fair Business Practices, Siliguri Regional Office ,Siliguri.
All as per BOQ
Electrical Work
APAS/01/194/15/0001 Manirampur
All as per BOQ
All as per BOQ
all as per Boq
As per NIT document
All as per BOQ
WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT M.G. ROAD FROM JN. OF STRAND ROAD TO JN. OF C.R. AVENUE UNDER BR.- IV AND V .
NRS MEDICAL COLLEGE HOSPITAL ABCC BUILDING URGENT REPAIRING PAINTING OTHER ALLIED WORKS FOR ACCOMODATION OF FIRST YEAR STUDENTS AT 2ND FLOOR DURING THE FY 2026 2027
Repairing and painting of Over Head Reservoir (Capacity 500 Cum., staging height 20 Mtr.), Chlorination Room, Guard Room, Boundary Wall, laying distribution pipeline to provide FHTC
Repairing and painting of the existing ornamental structure and models at wild flower meadow forest part and pathway repairing etc within Eco Park New Town Kolkata
REPAIRING AND PAINTING OF CORRIDOR Central and western portion , ROOM NO. 740,745,746,701,702 AND LABORATORIES ( ROOM NO. 710,711,712,713,714,721,722,723,724 INCLUDING PLUMBING WORKS OF THESE LABORATORIES OF BIOCHEMISTRY DEPARTMENT.
WASHING AND PAINTING OF MEDIAN VERGE AT GARIAHAT ROAD ASHUTOSH CHOWDHURY AVENUE AND SYED AMIR ALI AVENUE IN WD NO-90,86,68 AND 69 UNDER BR-VIII.
Emergent work from Fulbari to Abari-FalakataRoad from chainage 7th km Fulbari-Gazoldoba ROB Crash barrier Painting under Jalpaiguri Highway Division during the year 2024-25.