Loading…
Loading…
10,910 results • Best match
Painting Block Letters on the Toilet, G.I. Tank / P.V.C. Tank at different Bus Buffer Zone from Pailan to Kakdwip in connection with Ganga Sagar Mela -2026
Exterior and interior painting of School Building repairing of doors and windows sanitary and plumbing works and other allied works at Govt Model School Baghmundi Purulia
Repairing and painting of the facia of the old steel racks at 6th 7th and 9th floor of Central library College street campus University of Calcutta.
WASHING AND PAINTING OF ROAD SIDE VERTICAL KERB AND RAILING ON CHITTARANJAN AVENUE FROM JN. OF LENIN SARANI TO JN. OF B.B.GANGULI STREET UNDER BR- VI.
Special repairing and painting inside at the Two Storied Residential Bungalow of S.D.O., Tehatta Sub Division under Plassey Sub Division P.W.D. during the year 2025-2026
PAINTING AND MINOR REPAIRING OF PAY AND USE TOILET AT NEW ALIPUR TRAINGULAR PARK,ROSSUI VAT,TOLLYGUNGE POST OFFICE ETC IN WD NO -81,BR-X
Internal Painting and other allied works at SDO Bungalow of Manbazar Sub-Division under Purulia Construction Sub-Division of Purulia Division during the year 2024-25
Minor repairing and painting of all Iron Stair case of Presidency University, College Street Campus, and Eden Hindu Hostel, Kolkata 700073 during the year 2023 2024.
Painting and minor repairing work Urban Welfare center at Susma Mansion, Kalibabur bazar, shibpur for shifting of Dy-ii section staff(O/o the CMOH , Howrah)
PAINTING OF KERB AT DIFFERENT PLACES IN WARD 54 SUCH AS DR S.S. RD, G.C. BOSE RD. SARAT GHOSH ST, HARALAL DAS ST, PAN BAGAN ETC
Repairing and painting at inside of Electrical Machine Room and rest room of LT Sub_Station at MLA Hostel- 2- Kyd Street_ Kol_16 R and B Work
PAINTING OF MEDIAN STRIPS FROM GALLIF STREET TO HARISHA MARKET AND FROM NANDAN BAGAN ST TO BEADON ST X-ING THROUGH A.P.C. ROAD UNDER BR-II
REPAIRING AND PAINTING OF GI RESERVE TANK AND OTHER RELATED WORKS FOR DISTRIBUTION OF FILTERED WATER AT DIFFERENT FESTIVALS UNDER CENTRAL DIVISION OF WATER SUPPLY DEPARTMENT.
Painting, Sanitary AND Plumbing and Plinth Protection work at ground floor of science block of Malda College under English Bazar Municipality in the district of Malda.
Repair of distresses and painting of the ceiling of Establishment Section and Accounts Section Goenka Block, Office of CSS, COGCH, Kolkata during the year 2025-26.
Emergent painting to concrete crash barrier railing inner face and Top and guard rail Up and Down at Kolkata side upto Main bridge of Vidyasagar Setu.
PAINTING OF MEDIAN STRIPS FROM GALLIF STREET TO HARISHA MARKET AND FROM NANDAN BAGAN ST TO BEADON ST X-ING THROUGH A.P.C. ROAD UNDER BR-II
Painting to kerb stone at C.R. Avenue footpath (Eastern and Western side) and Beadon Street Footpath (from Rabindra Sarani to A.P.C. Roy Road) Under Br IV
MAINTENANCE OF ROAD BY PAINTING KERB AT AJANTA ROAD, KALIKAPUR PATWARI PARA, EASTERN PARK, FRIENDS ROW AND SURROUNDING AREA FOR PUJA FESTIVALS , IN WD. NO.104
WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT HEM CHANDRA NASKAR ROAD FROM JN. OF BELIAGHATA MAIN ROAD TO NARKELDANGA MAIN ROAD UNDER BR.- III
Painting of Bridge Railing with Dressing and Chilchalling of approach road of bridges and clearance of rubbish, earth from bridge carriageway portion of Kandi-Bharatpur Road
Repairing and painting of boundary wall for ED Block Children Park (Abol Tabol Park-G Block) within Ward No.32 under Bidhannagar Municipal Corporation. (Councillor Fund)
JOB WORK FOR CLEANING AND PAINTING OF VARIOUS PUMPSET INCLUDING OPERATING OF WATER SUPPLY PUMP HOUSE AT SOUTH ZONE ANDE CENTRE ZONE UNDER GE (SOUTH) BINNAGURI
Cleaning and removing of choked Pipe and Pit within Smart Connect Complex and Painting of Blacony of living block of Smart Connect within New Town Kolkata.
Chittaranjan Seva Sadan College of Obs. Gynae. and Child Health Kolkata -Repair ,renovation and painting of Server room of CSS COGCH, during the year 2024-25.
Emergent painting to concrete crash barrier railing Inner and Top and steel crash barriers with guard rail from Main bridge to Toll Plaza of Vidyasagar Setu
Repairing, replacement and painting of steel windows of barrack no.5 (2nd Floor and 3rd Floor) at Body Guard Lines, Kolkata during the year 2024-2025.
Repair and Maintenance of Boundary Wall, painting of structures and other allied works at Sehagori 33/11 KV Sub Station in the District of Howrah, WBSEDCL.
Renovation of Paver Block footpath including painting of Kerbs and restoration of Power cable distribution for Street No-20 and 26 in Sector-v under NDITA.
Repairing and maintenance of gate shutter and hoisting arrangement incl painting of HR gate of Dy 11L of MMC at Block Chopra, PS Chopra, Dist UttarDinajpur
Emergent repairing and painting with some other allied works at 1st floor of rear side corridor of Civil Court Building Howrah during the year 2025 26
Urgent repairing of railing and footpath painting road marking and allied works at Charial Bridge in connection with Gangasagar Mela 2024 during the year 2023 24
Sambhu Nath Pandit Hospital --- Rehabilitation of distressed concrete and painting at the Corridor of Ground floor , JD Building of SNPH, Kolkata during the year 2025-26.
Sambhu Nath Pandit Hospital --- Rehabilitation of distressed concrete and painting at the Corridor of 1st Floor, JD Building of SNPH, Kolkata during the year 2025-26.
Repair and painting of outside wall with other allied work of Annex Building with two adjacent room at ITI Tollygunge. Building and S and P works.
DEVELOPMENT OF CHAKRABERIA PARK BY PROVIDING OPENABLE M.S. GRILLS AND PAINTING AND OTHER ANCILLARY WORKS AT ROY STREET PARK WITH IN WARD NO.70, BR-VIII
Emergent maintenance and repairing work at 44 Iron Side Road repairing of damage plaster painting ply with lamination fittings S and PP works in different flats
Sambhu Nath Pandit Hospital --- Rehabilitation of distressed concrete and painting at the Corridor of 2nd Floor , JD Building of SNPH, Kolkata during the year 2025-26.
Furnishing by painting, polishing with allied works at Brown Dining room on 1st floor, within Kolkata Raj Bhavan Main Building under SGE/WB during 2025-26
Dressing of Coconut Trees along the main Water Body and Painting of MS Fencing from Gate No.-1 to Mistika within Eco Park, New Town Kolkata.
ONE YEAR PERIODIC CLEANING, WASHING, PAINTING ETC. AT C.R. AVENUE MEDIAN STRIP FROM BENTINCK STREET CROSSING TO SHYAMBAZAR FIVE POINT CROSSING FOR THE YEAR 2026-27
REPAIRING AND PAINTING OF UDAY SHANKAR UDYAN ADJACENT TO CHALACHITRA SATABARSHA BHABAN IN WD. NO.94 AND BANGUR PARK IN WARD NO.-93,UNDER BOROUGH-X.
Special repair and painting for external face of North Block, eleven storied building of Jalasampad Bhavan, Salt Lake office building of Directorate of Commercial Taxes, WB.
Beautification of adjacent footpath of ALLEN Park surrounding, including laying of coloured paver block, painting of kerb and railing and other ancillary civil works at Kolkata.
WASHING AND PAINTING OF GUARD RAILING INCLUDING KERB AT MANIKTALA MAIN ROAD FROM JN. OF E.M. BYE PASS TO JN. OF KANKURGACHI MORE UNDER BR III
Repairing and painting and rectifying the roof shade of the laboratory room at roof top of Applied Physics Building at Rajabazar Science Campus, University of Calcutta.
Supply fitting and fixing of new Undersluice Gate Truss along with FF of rubber seal painting at Saharajore I scheme PO P S Bagmundi District Purulia
Repair renovation and painting of Police office under CID WB at 3rd floor of Bhabani Bhawan main building Alipore Kolkata 700027 during the year 2025 2026
Painting and Colour Works of Inner Walls and Class Rooms of Burdwan Harisava Hindu Girls High School Morn., Subhaspally in Ward No 2 under Burdwan Municipality.
Basinda Bridge guard railling repairing, rehabilitation, painting and allied works (at Ch. 6.00 Km) Gopiballavpur - Nayagram Road under Jhargram Highway Division in the district of Jhargram.