Loading…
Loading…
9,870 results • Best match
RESTORATION OF PAVER BLOCK FOOTPATH WITH ALLIED WORKS AT BOTH SIDE OF PAHARPUR ROAD (DISTURBED BY S AND D DEPARTMENT ) IN WARD NO -133 BR-XV.
RESTORATION OF IPS AND PAVER BLOCK FOOT PATH AT 3/1B MI LANE,19A AND 11/2/B DR. SURESH SARKAR RD ETC. IN WD-54..
RESTORATION OF ASPHALTUM ROAD AND PAVER BLOCK FOOTPATH AT 12, MARCUS SQ. TO 164A, C.R AVENUE DUE TO DISTRUBED BY CESC DEPT. IN WD NO 039
REPAIRING OF IP ,PAVER BLOCK SURFACE AT 252/2 APC ROAD,3B NANDANBAGAN ST,32/1A,GOURI BARI LANE, MUNSHIPARA LANE ETC IN WARD NO.15
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR EKDALIA RD, BONDEL RD ETC. IN WARD NO 68 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
REPAIRING CEMENT CONCRETE and PAVER BLOCK PASSAGE WITH ALLIED WORKS AT DIFFERENT UTTARAN AREA, SHIMPUKUR LANE ,DEWAN BAGANMUDIALY ROAD ETC IN WARD NO-136, BR XV.
REPAIRING OF BUSTEE IPS AND PAVER BLOCK PASSAGE AT SEVAK NAGAR AND DIFFERENT BUSTEE AREA IN WARD NO-031. DUE TO MAINTENANCE AND LAYING OF SEWER.
CONSTRUCTION OF CC PAVEMENT WITH PAVER BLOCK 1) SURENDRA ROY RUAD 2) KUNDAN DAS ROAD AND 3) CHOTU SAHANI ROAD AT GANGA NAGAR, WARD NO. 05
Construction of Paver Block road from Subal Barman Shop to Shiv Parbati via Bandh within Domohani-I G.P. under Maynaguri Block in the district of Jalpaiguri.
MAINTENANCE OF PAVER BLOCK FOOTPATH ALONG JAMES LONG SARANI (BOTHSIDE) FROM BHUPEN ROY ROAD CROSSING TO R. R. M. ROY ROAD CROSSING IN WARD NO. 121.
REPAIRING OF PAVER BLOCK FOOTPATH AT HARISH MUKHERJEE ROAD DAMAGED DUE TO LAYING CABLE DUCT ( FROM HAZRA ROAD TO SUHASINI GANGULY SARANI) IN WARD NO 73.
Construction of Paver Block road from Gopal Debsharmas house to Kali Dass house at Belbari 1 G.P under Gangarampur Block. in the District of Dakshin Dinajpur
REPAIRING OF PAVER BLOCK PASSAGE AND FOOTPATH AT 15_27, 15_35, NARKELDANGA NORTH ROAD, 8_13, N.M ROAD, 243 M.M RD AND OTHER PLACES IN WD NO-29.
DEVELOPMENT OF BUSTEE PASSAGE BY PROVIDING PAVER BLOCK AT K.G. RD (BAROGALI) FROM 144 K.G.RD TO B/144/H/7 K.G. RD IN WARD NO. 83
Construction of Concrete Paver Block Road from Alom Sarkar House (Solakuri) to Raghabpur Hat at Hazaratpur G.P under Tapan Block in the district of Dakshin Dinajpur
Construction of Paver Block Road from Dhanir Hat to Goabari via Babul Master house in Ghirnigaon GP, under Chopra Block in the district of Uttar Dinajpur.
Repairing and renovation of paver block footpath from BA-4 to BA-16 and CA-15 and 16 within Ward No.39 under Bidhannagar Municipal Corporation.
Urgent maintenance work by setting paver block at Satyen Bose Road Ch. 0.700 to Ch. 0.740 towards Nazirgung under Howrah Division during the year 2024-2025
Construction of concrete paver block pavement at 28.20 Km to 28.50 Km of Manbazar-Bandwan-Kuilapal Road under Purulia Highway Division in the district of Purulia.
Construction of paver block road from the NH to LO Ratan Sikdar at sansad X part no 13/146, Jateswar under Jateswar-II G.P. (2023-24)
Construction of Concrete road by Concrete Paver Block from Dinesh Kirtaniya Land to Charabagan under Charkrishnabati GP within Balagarh Block area in the District of Hooghly.
Construction of Paver Block Road at Authpur Bank of River Ganga from Over Head Water Reserver to chinging room in Ward No. 21, under Bhatpara Municipality
External repair of three buildings by cement work, replacement of all category of pipes, paver block, easing of rolling shutter, roof treatment by A.P.P. sheet etc
IMPROVEMENT OF PASSAGE BY PROVIDING PAVER BLOCK AT PREM. NO. 63,63A, 63/2, 56/1,T.G. ROAD ETC. (SLUM AREA) IN WARD NO-81, BR-X
Renovation of and upgradation of paver block and National Flag Stand at Kestopur Junction Auto Stand of Ward No.24 under Bidhannagar Municipal Corporation. (BEUP Fund)
Restoration of road with Paver block at Netaji Sangha club to Neheru Market Soni Mandir via Authpur Natunpally in ward no -23 and 29under Bhatpara Municipality
Construction of road by paver block in at various places in Ward Nos. 1, 2, and 3 within Budge Budge Municipality with Total Scheme 2 nos.
On call repair of road surface and footpath by providing bituminous works and paver block (Zone -A, EP and GP block) at Sector-V, under NDITA
Maintenance of Road by Paver Block and Cement Concrete work (RMC) to maintain pot-holes free road at different spots under jurisdiction of Borough-III, HMC.
RESTORATION OF PAVER BLOCK FOOTPATH AT 81A JATINDRA MOHAN AVENUE TO SHYAMBAZAR ST AND 102, BHUPEN BOSE AVENUE TO RAMKANTA BOSE STREET IN WD NO-008
Maintenance of Road by Paver Block and Cement Concrete work (RMC) to maintain pot-holes free road at different spots under jurisdiction of Borough-VI, HMC.
Construction of Paver Block Pavement from H/o Late Bikash Roy to Eti Kundu at Ward No 7 under Dhupguri Municipality out of fund 14th F.C.
REPAIRING OF DISTURBED IPS, PAVER BLOCK, ROAD SURFACE AT 11,10 BALLYGUNGE ST. RD, 20,21 PANCHANATALA AND OTHER UTTARAN AREAS IN WD 090 DISTURBED BY WS DEPT.
DEVELOPMENT OF FOOTPATH BY LAYING PAVER BLOCK AT 8/2, MOHAN CHAND ROAD AND ITS SURROUNDING AREA IN WARD NO.76 (APAS/01/158/223/0001)
Footpath by inter locking paver block painting of boundary wall and earth filling and beautification of DC Park within Ward No.40 under Bidhannagar Municipal Corporation.
DEVELOPMENT OF PASSAGE BY LAYING PAVER BLOCK AT 3/47, 3/62, 3/67A, 2/86, 3/88 AZADGARH COLONY IN WD NO-95,BR-X
IMPROVEMENT OF BUSTEE PASSAGAE BY LAYING PAVER BLOCK NEAR PREM. NO-78, 74, SANTIGARH, 195, REGENT COLONY, 2/71, ASHOKE NAGAR ETC.IN WD-97, BR-X
Construction of Paver Block Road from Maraikura Malay Pal Home to Baul Math under 10 No. Maraikura GP. Raiganj Block in the Dist of Uttar Dinajpur.
Construction of Road by paver block for inter connecting road of Dariapur WTP campus of Southern Sector under Malda Arsenic Area W/S Division PHE Dte.
Periodical Repairing Pot Holes during the monsoon with Paver Block on both Main Carriageway Service Road of N S Corridor in Action Area II Newtown Kolkata
Construction of parking place with paver block at front of canteen, near Sabhadhipati Bungalow, front of District Panchayat Training Centre in compound of Msd. Zilla Parishad.
(B) Picking up and resetting of existing disturbed paver block throughout the Eco Park, New Town, Kolkata during the year 2025-26. For 12 (twelve) months.
Maintenance of Road by Paver Block and Cement Concrete work (RMC) to maintain pot holes free road at different spots under Jurisdiction of Borough-V, HMC.
RESTORATION OF PAVER BLOCK AND IPS FOOTPATH NEAR 41,2A PARASHAR RD, 58,35 LAKE AVE. ETC IN WD 87 DISTURBED BY CESC AND NATURAL WEAR AND TEAR.
REPAIR OF PAVER BLOCK AT 157 DR S.C. BANERJEE ROAD,39/1 BAROWARITALA MAIN ROAD AND DIFFERENT PLACES IN WARD NO-034 DISTUREBED BY PU AGENCY
RESTORATION OF FATHEPUR VILLAGE ROAD BY PAVER BLOCK WITH ALLIED WORKS NEAR PREMISES NO J9.J9/1, J39/2 ETC IN WARD NO-134 BR-XV.
Construction of RCC BOX CULVERT with 2 sides (50m x 2) paver block pavement at Ghosh Para at Ward No 10 out of fund 14th FC
RESTORATION OF PAVER BLOCK FOOTPATH FROM 60 TO 61/1A NIRMAL CH. ST. TO BE DISTURBED BY KMC LIGHTING DEPT. IN WARD NO-48, BR-V
Urgent Flank protection work by setting paver block at College Road near 3 no Shalimer Rail Gate under Howrah Division, PWD during the year 2023-2024.
RESTORATION OF PAVER BLOCK SURFACE DISTURBED BY LIGHTING DEPT. AT HAZRA RD FROM FIRE BRIGADE TO K.G.RD XING, D.DAS ROW , N.B 1ST LANE IN WD 083