Loading…
Loading…
4,564 results • Best match
Providing and fixing of barbed wires with PCC Fence Posts and carry out afforestation work
Providing and fixing of barbed wires with PCC Fence Posts and carry out afforestation work
Repair/Mainteinance including paint works, welding works of old/broken tree guards
Planting of saplings in pits of size 45cmx45cmx45cm within the available blanks AT CO.1/C KARMULLAH TRAL
Planting of saplings in pits of size 45cmx45cmx45cm within the available blanks AT CO.RB-28 2ND KATHALLAN SHOPIAN
Planting of saplings in pits of size 45cmx45cmx45cm within the available blanks AT CO.RB-28 IST KATHALLAN SHOPIAN
Planting of saplings in pits of size 45cmx45cmx45cm within the available blanks AT VILLAGE WOOD LOT DRABGAM PULWAMA
Raising of 72000 Naked Rooted plants at Seela nursery.
Construction of Pond and Nursery Conditioning Units (50x40 ft).
Plants production at Budhan Nursery range Mahore Division Mahore
Raising of NR Plants in Kandayri Nalla Nursery (Campa)
Raising of 109220 Naked Rooted plants at Budhan nursery
Raising of 109220 Naked Rooted plants at Budhan nursery
Maintenance of naked root plants at Kandayari nallah Nursery
Repairing of existing irrigation system at SFRI Nursery Sidhra
Purchase of seeds under nursery raising Capex Seri Khawja
Upgradation of Hi-Tech Nursery at Polo Ground, Srinagar.
Development of Park near Horticulture Nursery at Zangam Pattan.
Construction of Mali Hut at Mulberry Nursery Watlab Sopore.
Supply of machinery and equipment items for the nursery
Construction of Nursery path at Maggar Khad
Bed Formation, Preparation of Soil for Raising of Broad leaved/ Fruit Bearing Prickings and Supply of Farm Yard Manure (FYM), including its carriage, application in the beds as per standard nursery practices at Awantipora Nursery and Kanjinag Nursery
Bed Formation, Preparation of Soil for Raising of Broad leaved/ Fruit Bearing Prickings and Supply of Farm Yard Manure (FYM), including its carriage, application in the beds as per standard nursery practices at Awantipora Nursery and Kanjinag Nursery
Mechanization, Automation and upgradation of nursery infrastructure
BOQ
Bed formation and preparation of soil for raising of fruit bearing / broad leaved Prickings (Naked Root) in Awantipora Nursery, Range Awantipora of Forest Division Awantipora under CAMPA-NPV for the Year 2024-25.
Bed formation and preparation of soil for raising of fruit bearing / broad leaved Prickings (Naked Root) in Kanjinag Nursery, Range Awantipora of Forest Division Awantipora under CAMPA-NPV for the Year 2024-25.
BOQ
Planting of Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks,Wooden Posts in Earthen Pits and Crate Work in Comptt. 32e Mawer,Mawer Range ,Langate Forest D
Planting of Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks, Wooden Posts in Earthen Pits, DRSM and Crate Works in comptt. 48 South Lolab, Kamraj Forest D
Planting of Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Wooden Fence Posts in Earthen Pits in comptt 70SL at Kawari Lolab South Lolab Range of Kamraj Forest Division under scheme CAMPA NPV 2025
Planting of Polybag raised saplings and Naked root saplings and providing and fixing of Barbed wire fencing with Angle Iron Posts in cement concrete Blocks and Wooden Posts in Earthen Pits in comptt. 50b/SL at Dardpora Lolab South Lolab Range of Kam
Unbranded Compostable Nursery Bags 35 microns; 0.5 Kgs; 175, Unbranded Compostable Nursery Bags 35 microns; 0.5 Kgs; 175 mm x 100 mm; 1.61 gms
Upgradation of Purmandal Nursery, repair of water Channel and path etc. in Purmandal Nursery of Purmandal Forest Range in Samba Forest Division under CAMPA
Improvement establishment of hitech Nursery for production of quality plant mterial at Jangalwar Nursery of Soil Range under CAMPA for the year 2023-24
Standard nursery maintenance operations for Polybag Plants at Central Nursery Nagbal Shopian, Forest Division Shopian under the Scheme CAMPA for the year 2026-27
G.I Barbed wire Fencing 6100 rft Using PCC Square Post at Spacing 10 ft with 4 along with brushwood, Plantation 10200 Nos. of saplings with Patch sowing and Grass Slips, DRSM Work at Compt 37/R Gourta of Reasi Range, under CAMPA Addl. CA 2024-25
G.I Barbed wire Fencing 3700 rft Using PCC Square Post at Spacing 10 ft with 4 Strands S along with brushwood, Plantation 2800 Nos. of saplings Patch sowing and Grass Slips, DRSM Work at Compt NO. 52/R Gouri Mitti of, under CAMPA Addl. CA 2024-25
PProviding and Fixing of Chain Link Fencing (1265) Rfts-with Angle Iron Posts in Cement Concrete Blocks in CO.70/Magam at Tulwari Nursery Social Forestry Division Kupwara Range Handwara
Preparation of potting mixture and mixing net quantity, followed by filling up of bags, preparation of beds and placement of such filled bags in suitable beds of nursery for raising of nursery stocks in Chitternar Nursery. Bandipora Forest Division.
Fencing and plantation work
Fencing and Plantation work
Cemented Tray for Plantation
Plantation Service - Artificial regeneration
Plantation Service - Artificial regeneration
Plantation Service - Artificial regeneration
Plantation Service - Artificial regeneration
Plantation Service - Artificial regeneration
Plantation Service - Artificial regeneration
Providing and Fixing of Barbed Wire Fencing with Angle Iron Posts in Cement Concrete Blocks and afforestation works at Mantrigam VWL (3000Rftsx5 strands )