Loading…
Loading…
4,569 results • Best match
Raising of poly bagged saplings
Planting of saplings in pits of size 45cmx45cmx45cm within the available blanks of identified site including extraction/carriage/lifting of plants from different nurseries of Forest Department at 50 SL Dardpora, Lolab
Planting of saplings (polybags) in pits of size 45cmx45cmx45cm within the available blanks of identified site at 09 Nos. of different locations which are already fenced during 2022-23 of Sunderbani Range
Planting of polypots, naked root saplings in Comptt. 19a/l, 16a/l, 55b/l, 52b/l ,13b/l and 36c/l of Forest Range Mattan and Pahalgam of Lidder Forest Division Bijbehara.
fencing work using PCC Sq fence post, plantation of polybaged plants in pit and agave bulbs plantation in open space in comptt 73 siraj under CAMPA for the year 2023-24
Establishment of plantation closure under CAMPA Addl.CA for the year 2024 in comptt 23 siraj of Siraj Range with wooden fencing, plantation of PB, NR plants, Patch Sowing and Grass Slip
Establishment of plantation closure under CAMPA Addl.CA for the year 2024 in comptt 35c keshwan of Thakrai Range, with wooden fencing, plantation of PB, NR plants, Patch Sowing and Grass Slip
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer Plants, Broad Leaved Plants, Fruit Plants and Medicinal Plants in Comptt. No. 9/L and 52b/L Mattan Range. Lidder Forest Division Bijbehara.
Rehabilitation of Degraded Forests by carrying out afforestation by means of Planting of Conifer plants, Broadleaved plants, etc. and all other associated operations as per site conditions in Ajas and Soil Range of Bandipora Forest Division.2022-23.
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer, Naked Root plants in the different compartments of D.H.Pora Range, Forest Division Kulgam and all other associated operations, under Scheme CAMPA 2024-25.
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer, Naked Root Plants in the different compartments of D.H.Pora Forest Range, Kulgam Forest Division and all other associated operations as per site conditions
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer, Naked Root plants in the different compartments of Kulgam Range, Forest Division Kulgam and all other associated operations, under Scheme CAMPA 2024-25.
Beauting up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer, Broadleaved, Fruit bearing Plants in different CAMPA Closures established during the year 2021-22, Shopian/ Romshi Range of Shopian Forest Division 2024-25
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer, Naked Root plants in the different compartments of Veshew Range, Forest Division Kulgam and all other associated operations, under Scheme CAMPA 2024-25.
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer, Naked Root Plants in the different compartments of D.H.Pora Forest Range, Kulgam Forest Division and all other associated operations as per site conditions
Beating Up of Casualties (BUC) by carrying out afforestation by means of Planting of Conifer Plants, Broad Leaved Plants, Fruit Plants and Medicinal Plants in Comptt. No. 31/L and 34b/L Pahalgam Range, Lidder Forest Division Bijbehara.
Providing and fixing of 05 strands Barbed Wire (Area 1600 RFT) with angle iron fence Posts (50x50x5mm) in cement concrete blocks (1.5x1x1 feet ) and planting of naked root sapling plants 1625 No.s in staggered trenches of size 90cm x 45cm x 45 cm wit
Providing, Installation, Testing and Commissioning of Electro- Mechanical Components with allied works at Govt. Fruit Plant Nursery Sangaldan Distt. Ramban.
Raising of Conifer Poly Pots in S.A Nursery Kanidijan Doodganga Range of Pir Panjal Forest Division, Budgam. Year 2022-23.
Raising of 65000 plants in polythene bags of size 9x6 conforming to product code PB-60-90 at Seela nursery
Procurement of sand for top Dressing Greens , Tees, Fairways turf nursery etc for the year 2025-26 at RSGC Srinagar.
Raising of 60554 plants in polythene bags of size 9x6 conforming to product code PB-60 90 at Budhan nursery.
Construction of water Harvesting Structure and Water Distribution System for Harbel Garden and Nursery at Kahmoh, Rafiabad Langate Forest Division
Maintenance operation in Forest Nurseries including weeding and hoeing of polypots at Langate and sanzipora nursery of Langate Forest Division
Construction of chain link fencing on three sides back lift and right of Govt fruit plant nursery Chamba Distt reasi
Const. polyhouse in Wazir bowli Nursery Compt 36/R Reasi Range in Reasi Forest Division under CAMPA NPV 2023-24
Drilling of 200 mm dia Bore hole and installation and commissioning pumpset at G F P Nursery Chack Shiba Nagrota
Construction of deep drain with slab and iron janglas Ravinder Sharma upto main nallah towards Nursery W. No. 02 Nowshera
Construction of Approach path (Laying of Tiles) for Awantipora Nursery at Awantipora Forest Division under CAPEX Budget, year 2024-25.
Repair and Renovation of Mali Hut at Anji Nursery Katra Range in Reasi Forest Division under CAMPA NPV 2023-24
Creation of 25kVA Sub-Stations for providing of power supply to Nursery Cum Orchard at Panzmulla Salia under MIDH Scheme.
Providing and fixing Chain Link fencing of Fruit Plant Nursery at Bandipora adjacent to graveyard of Chinar Masjid Bagh Bandipora.
Maintenance of Plants in Ziren Nursery of Special Forest Division Tangmarg under Scheme CAMPA (NPV) for the year 2026-27.
Maintenance of Conifer Plants in Raithan Nursery, Raithan Range of Pir Panjal Forest Division, Budgam for the year 2026-27.
Maintenance of Plants in Harran Nursery under Scheme CAMPA (NPV) for the year 2026-27 in Sindh Forest Division Ganderbal
Maintenance of Plants in Hayan Nursery under Scheme CAMPA (NPV) for the year 2026-27 of Sindh Forest Division Ganderbal
Construction of Approach Road from Govt. Fruit plant Nursery at Bhagatpur,JammU under Capex Budget for the year 2026-27
c/o p/bund with Filling of link road mulbary nursery near l/o Khurshid bhat at WATHOO BLOCK KELLER
Maintenance of Plants in Ziren Nursery of Special Forest Division Tangmarg under Scheme CAMPA (NPV) for the year 2026-27.
BUC Plantation of Grass slips in Patches of size 45cmX45cmX15cm and poly bagged fodder plants in pit of size 45cmX45cmX45cm in Co. No.4/N, Kalajard Nagrota, Jammu in Agrostology Range, Jammu/ Samba under CAMPA Budget 2024-25.
BUC Plantation of Grass slips in Patches of size 45cmX45cmX15cm and poly bagged fodder plants in pit of size 45cmX45cmX45cm in Co. No. 14/B, Madana-III, Samba in Agrostology Range, Jammu/ Samba under CAMPA Budget 2024-25
Fencing and Plantation in Co. No. 50/R Upper pullulian in Rajouri Range
Const of one Check Dam along with Plantation and fencing at Qila Darhal
BUC Plantation in different units of Basantgarh Range under CAMPA (NPV) 2023-24
Plantation work at Co. 109, Co. 07 and Co. 106, Sudhmahadev Conservation Reserve
Pit Plantation in Co. 2/P Nizam Basti, Jammu Range, Jammu Forest Division
Plantation works in co. 12/Ramkote under CAMPA for the year 2024-25
Plantation and Patch Sowing work in Co. No. 42/S of South Range
Fencing, Raising, Maintenance, Plantation, Grass Slips, Patch Sowing and DRSM Work at Barnood
Fencing, plantation and patch sowing in Co.40/K Neeli Pray Kandi Range