Loading…
Loading…
55,239 results • Best match
Digging of pits and Engaging of labours for Avenue plantation from Court junction to rekurthi junction(R/S) for 7th phase Telanganaku Haritha Haram programme of MCK Estimate cost of Rs. 4.95 lakhs under PP Grants (Recall)
Raising and Maintenance of Multi Layer Avenue Plantation (MLAP) ( 0.5 KM) Double Row Both sides at Managapuram Colony Road No.1 to Loyala Degree College in Circle-27, Alwal, Kukatpally Zone, GHMC during the year 2021-22.
Maintenance of Multi Layer Avenue Plantation (MLAP) from Shamshabad to Gaganpahad Sub Station in Ward No-59, Mylardevpally Division, Circle-XI, Rajendranagar, Charminar Zone, UBD, GHMC for the year 2024-25 for 12 months (Total length-5km)
Raising Avenue plantation on either sides of the National Highways in Andhra Pradesh from Kodikonda to Anantapur (NH-7) over a distance of 20 Kms (Stretch-1) in Anantapur project division of NHAI including two years maintenance.
Raising avenue plantation on either sides of the National Highways in Andhra Pradesh from Kurnool to Gooty (NH-7) over a distance of 10 Kms (Stretch-5) in Anantapur project division of NHAI including two years maintenance
Raising Avenue plantation on either sides of the National Highways in Andhra Pradesh from Kurnool to Gooty (NH-7) over a distance of 20 Kms (Stretch-4) in Anantapur project division of NHAI including two year maintenance
Raising Avenue plantation on either sides of the National Highways in Andhra Pradesh from Kurnool to Kadapa (NH-18) over a distance of 20 Kms (Stretch-2) in Nandyal Project division of NHAI including two years maintenance
Raising Avenue plantation on either sides of the National Highways in Andhra Pradesh from Kurnool to Kadapa (NH-18) over a distance of 25 Kms (Stretch-3) in Nandyal project division of NHAI including two years maintenance
Densification of Avenue Plantation (Advance field preparation Planting and Maintenance works) along Vaggampalli to Dornala T Junction Section from Km 293.266 to Km 359.422 of NH 565 (Total length 66.150 km) in the State of Andhra Pradesh
Revised Estimate for the development and maintainanace of Avenue plantation on Colony Roads with 3 mts espacement (1345 Plants) (TREES ONLY) in Ward No: 11,12,13 &14 , Circle-3, Hayathnagar, LB.Nagar zone, GHMC.During the year 2024 -4th Recall
Infrastructure developmental works such as BT Road, Storm Water Drains, Amenities building, Internal Water Supply system, Fencing, Rain Water harvesting structures, Avenue plantation at Industrial Estate at Mancherial, Mancherial District, Telangana (Under MSE-CDP Scheme)(2nd Call).
Construction of Roads, Drains, Water Supply, Sewerage, Utility Ducts for Power and ICT, Reuse Water Line, and Avenue Plantation compatible with trunk infrastructure in layouts for the Amaravati Government Complex area in Amaravati Capital City, Andhra Pradesh
Raising and first year maintenance of avenue plantation 4.0 Km in the newly developed MC type quarter beside GM office, 3 inc bunglows and MD type quarters at Gouthampur colony, KGM area during the year 2025-27
Raising of Avenue Plantation in all major roads, sub-roads , colony roads under TKHH in ward no:2(A),circle-I, Kapra , LB,.Nagar Zone, GHMC (1504 No's) - Reserved for SC/ST & WLCCs Societies only)-2nd Recall
Repairs and maintenance of existing internal roads and avenue plantation in central verge with one year maintenance and providing Name / Sign boards and at IP-Naidupta Tirupathi District , under IALA for the year 2022-23(2nd call)
Drilling of Borewell, Electric Pole with lighting arrangements, Energy Meter Connection, Avenue Plantation (ELSR Compound and Clean Kadapa Vanam) Water Supply connections and Power Supply Connection work in Clean Kadapa Vanam near Lalithamma Temple, Kadapa Municipal Corporation
1st Years Maintenance of Plants of 78000 nos of Poly bagged saplings size 9x6 under CAPEX-2024-25
New Formation of Nursery incluidng cost of levelling, tractorization, complete work upto 1.6 to 2 formation of beds, raising of bunds formation of water channels etc at Lessu Nursery of Social Forestry Range Kokernag
Plantation work with colored interlocking tiles and tree guards on the CC road and side track on the service road from Jayna Resort (right hand side) to Mahindra Car Showroom at Meera intersection and from the boundary wall of Brijesh to the Municipa
Providing and fixing of SFRC tree guards with three years mtc and defect liability period free of cost and all other works contingent thereto
Afforestation under PMKSY WDC2 at Mouza Bataspur Suri I
Raising of 25000 No. of Naked Root saplings at Dodla Nursery of Social Forestry Range Ramnagar Social Forestry Division Udhampur for the year 2024-25 under CAPEX
Annual maintenance of tree/saplings, nursery and other horticulture work in Yantrik Niwas Hostel, SGH & QRH under the control of ATE/JMP of Z-12/26-27.
Raising of 35000 Nos Naked Roots saplings at Ghambir Nursery under CAPEX of Social Forestry Range Rajouri of Social Forestry Division Rajouri for the year 2024-25
Raising of 17610 No. of Poly Bagged saplings at Manoor Nursery of Social Forestry Range Udhampur Social Forestry Division Udhampur for the year 2024-25 under CAMPA
Raising of 36614 Nos Naked Roots saplings at Ghambir Nursery under CAPEX of Social Forestry Range Rajouri of Social Forestry Division Rajouri for the year 2025-26
Transportation of 6000 Nos saplings from Karli Nursery to the Co.4/N, Kheri site clearance, digging of pits of 45cmx45cmx45cm including excavation of soil and planting
Raising of 20000 No. of Poly Bagged saplings at Deot Nursery of Social Forestry Range Udhampur Social Forestry Division Udhampur for the year 2024-25 under CAMPA
RAISING OF 2 YRARS OLD TALL SEEDLINGS DURING 2023-24 FOR CREATION OF 2024-25 PLANTATION (YEAR-2) AT JOYPUR CENTRAL NURSERY UNDER DIVISIONAL FOREST OFFICER, PURULIA DIVISION OF 2023-24.
Supply of Strawberry Sapling under Private Sector Farm, SOPD, 2022-23
Guava Sapling (Q3) MSE Exemption for Years of Experience and Turnover
Nagercoil Corporation Supply and delivery of sapling under Wage employement scheme
BOQ
Providing kerb, borewell and pathway to the existing miyawaki plantation at Gouthaminagar and pattana Prakruthi vanam in PK Ramaiah colony in RMC (15th Un Tied Grants)
2020-Hor01-CB-160 -Proposals for Development and maintenance (45 days)of Miyawaki plantation in Shipyard layout, Bindhranagar, ward no-7 , zone-1 area.(2000 sqmtrs)
1st year maintenance of (Yadadri Model Plantation) Miyawaki at Venkateshwara Colony, Rajendranagar in Cir-XI, Charminar Zone, UBD, GHMC for the year 2021-22 (12 months)
1st year maintenance of (Yadadri Model Plantation) Miyawaki at Veternary College, Rajendranagar in Cir-XI, Charminar Zone, UBD, GHMC for the year 2021-22 (12 months)
1st year maintenance of (Yadadri Model Plantation) Miyawaki at Madannaguda Forest Block, Rajendranagar in Cir-XI, CRZ, UBD, GHMC for the year 2021-22 (12 months)
Development of Miyawaki (thick forest type open plantation) at 2 Acres of land proposed near ranganayaka sagar in SUDA Jurisdiction under SUDA General funds 2020-21.
Raising of 20000 plants at Oxygen Park in Sy.No. 309 of Rampur (v) Under Miyawaki method of plantation, under TKHH 2019-20 in Warangal (urban) District
Raising and maintenance of Yadadri Natural forest model (Miyawaki) plantation at BHEL in Circle-22, SLPZ, GHMC during the year 2023-24 under Telanganaku Haritha Haram
Raising and First year Maintenance of Plantation in YADADRI/MIYAWAKI method of planting at collectorate(Bungalows area)in 0.5 Ha at Bhupalpalli during 2020-21-Reg
2020-Hor01-CB-160 -Proposals for Development and maintenance (45 days)of Miyawaki plantation in Shipyard layout, Bindhranagar, ward no-7 , zone-1 area.(2000 sqmtrs)
Custom Bid for Services - Power Supply arrangement of Miyawaki Plantation area at Pauni II Expn OCM of Ballarpur Area Similar Category Manpower Outsourcing Services - Minimum wage
BARBED WIRE FENCING plantation of poly raised saplings plantation including earthwork with pit size (45x45x45) Dibbling of H.C. Nuts AT ZARIN EXTENSION DISTRICT BARAMULLA UNDER UT CAPEX BUDGET FOR THE YEAR 2022-23
Raising 35000 Coir root Trainer seedlings Nursery at Sanjeevini Kulathupuzha in Kollam SF Division during 2021-22 and 2022-23
Raising of 148000 plants adjecent to Gundu Cheruvu MIYAWAKI method of plantation over an area 9.15 Acres & Raising of Block Plantation over an area of 7.50 Ha (3x3m espacement) at Fort Warangal under TKHH 2020-2021
Afforestation of Sonaijhuri at Bramhananda Mahato and others
Mts of plantation and nry works
Plantation development work as per G schedule by hydraulic excavator (3D) JCB machine in various plantations under Range Bayana Advance Work Bandh Baritha.