Loading…
Loading…
5,280 results • Best match
Laying of PVC pipe line
Demarcation work of Municipal Land and Pond by Differential Global Positioning System Station Machine and Leveling works of Roads, Streets and Nalas in MC Mahendragah
Pav of firni with ILPB along Nala from h o rajinder son of kriparam to cow ghatt of chajju wala pond village bhurain Scheme HRDF
SAMALKHA -BLOCK ROUGH COST ESTIMATE FOR LAYING SEWER LINE FROM PANIHARI WELL MOHALLA TO NEPAL WALA POND AT VILLAGE- KARHANS DISTRICT- PANIPAT UNDER ( SFC FUND)
Const. of IPB Street Along PWD Asandh Road from General Shamshan Ghat to Pond Near Petrol Pump at village Assan Kalan , Block Panipat , Distt. Panipat.
Laying of RCC Pipe in place of Open Drain from Jhupa Road to Pond Corner at Sati Mata Mandir Complex, Ward No. 01 MC Loharu
ROUGH COST EASTIMATE FOR CONST. OF STORE and TOILET and LAWN AT POND NEAR BABA HARIDAS AASHRAM AT VILLAGE JOSHIJAAT WARD NO.9 MC SONIPAT
CONST. OF COW GHAT AT BARMBI WALA POND AT VILLAGE MADINA BLOCK KATHURA PROVIDING AND FIXING METAL BEAM CRASH BARRIOR AT VILLAGE MADINA BLOCK KATHURA
construction of grey water near dahia wala johad (from pilana minor mogha no. 12500/R field of naseeb jindhad to dahia wala pond ) village katesra
Estimate for Laying RCC pipeline for connecting village pond of Jhook off-taking from Km. 1.900/L of M/Garh Disty. (Under Atal Bhujal Yojana)
Constructing underground RCC NP2 pipeline drain for dewatering of floodwater of village Chetain from RD 9220 to 0 out falling into village pond of v
As per detailed of bill of quantities
As per detailed of bill of quantities
As detailed in bill of quantities (BOQ)
As per detailed of bill of quantities
Desilting of Storm Water Drain/Nala from Hanuman Mandir Bada Talab towards Aggarsain Chowk (Right side) via Ambedkar Chowk, Dharuhera Chungi, Jhajjar chowk, Railway chowk, Nai wali chowk at Main Circular Road in Jurisdiction MC Rewari
Demarcation of work M.C. BERI Land and Pond And Revenue Sazra Base Key Plan Municipal Boundary .and lal Dora By Differential Global Positioning System Station Machine.
Laying Underground RCC Pipeline 350 MM Dia NP3 To Fill Village Pond Joldi in Sureti Jhakhal Off taking from km 5.570 R/S of Dhana Minor
Laying RCC pipeline 350 mm dia NP3 pipe for Bichli Pond of village Jhanjhra Toda from RD 84800-R of Damkora Disty.To improve ground water table
Estimate for Laying RCC pipeline for connecting village pond Kheri (Mandir wala johad) off taking from km 4.000/R of Kheri Disty. (Under Atal Bhujal Yojana)
pnp const. of ghat in beniwal pond PNP compl. of valmiki plus danak chaupal const. of boundry wall in saini chaupal at village qwai block madlauda
SCOPE OF WORK CONSTRUCTION OF NALA ALONG THE ROAD OF BABAIN/ BARARA FROM RAMSARAN MAJRA POND TO SAINI COLONY VILLAGE RAMSARAN MAJRA BLOCK BABAIN DISTT KURUKSHETRA
LAYING UNDERGROUND RCC PIPELINE 350 MM DIA NP3 TO FILLING OF VILLAGE POND (KALA MORWAJOHAD) IN NAWAN OFF TAKING FROM KM 2.153/L OF BASS DISTY
Estimate for laying of pipeline to drain out flood water from abadi area pond outfalling at RD 4500-R Kharak Drain in village Kharak, Distt - Bhiwani
Estimate for Laying Pressurized pipeline for connecting Baba Bela wala and Kankar Wala pond of village Budeen off-taking from P.H MD-II of Mahendergarh Disty.
clearance of flooded water overflowing pond near abadi area of village Babepur, Block Salhawas through underground pressurized pipe line, out falling into SLC at RD23686/L
ProvidingandFixing of bench in model pond at village Aurangabad,Chandhat,Utawar,Kushak,Alimeo,Kot,Rupraka,Banchari,Bhiduki,dudhola,Sundhad,Chhainsa,Pachanka,Balai Block palwal Disst. Palwal
CONSTRUCTION OF IPB STREET FROM MAIN PHIRNI TO H/O SUBHASH MAIN PHIRNI TO POND IPB TILING IN SC CHAUPAL AND AMBEDKAR BHAWAN AAGAN VILLAGE TIGRA
Raj Kumar Saini S/O Shri Ghasitu Ram khandoja rasta from road of Fatehpur to dera of Mani Ram near Malpani pond Rajpal and Satpal saini.
Laying of RCC Pipe line from H/o Malkeet Singh S/o Mal Singh to Main Pond at Village Matter, Block Baragudha, Distt. Sirsa. (Gram Panchayat)
CONST. OF DRAIN 2 X 2 PWD ROAD TO DOHRI POND VIA PHIRNI UNDER VANGY SCHEME 2025-26 AT VILLAGE ALAWALPUR BLOCK PRITHLA and DISTRICT PALWAL
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Air compressor 300 pond double cylinder with 3 phase 3 HP motor; Service Provider
Cleaning of block main sewer line 12, 10 by the bucket type machine and labour in ward no. 20, 21 near Govt. college alongwith G.T. road and Kachha Talab Hodal Town and all other works contingent thereto
Construction of nala from H/o Jaswinder to Pond, Village Majri and Const of Nala From Naib Singh To Main Road Village Majri Block Ambalal Distt Ambala
CONST. OF B/WALL NEAR MANDIR WALA POND VILL. BADOWALA SCHEME-P/SAMITI CONST OF B/WALL IN GOVT SCHOOL,VILLAGE-DABLAIN,BLOCK-NARWANA,SCHEME-P SAMITI
Repair/Construction of Firni and Nala From (A) H/o Neeraj to Pond and (B) Construction of Nala From H/o Shiv Mandir to H/o Dharmpal
Boring of Borewell and Commissioning against abandoned T/well at village atail near pond and Dayalpur Housing Board Colony and all other work contingent thereto Distt. Faridabad
Restoration of Sh. Thakur Bir Singh Park Bhojawala pond Bhiwani and all other works contingent thereto Including 1 year maintenance and defect liability period free of cost
Estimate for Construction of Drainage Crossing on Lawan Disty. at km 3.945 and km 3.970 and releasing extra rain water in village pond Malra through RCC pipeline.
Estimate for laying underground RCC pipe line 350mm dia Np3 pipe for filling of Nai Bali Pond of village Singhani offtaking at RD 18000-R Singhani Mr.
laying underground RCC pipeline 350 mm dia NP-3 for filling of village pond Bawwa (Dada Puran Mal) off taking from 17.400-R of M/Garh Canal.
.To improve ground water table
Construction of Nahveen project Const. of Nahveen project
Constructing Sumpwell for dewatering of flooded water
As per detailed of bill of quantities
Constt of IPB street in Front of Monisar pond and Firni to SC choupal in village Parnala Constt of IPB streets in BPL Basti in Village Lowa Khurd
Operation Maintenance of 9 MLD STP MPS based on Waste Stabilization Pond Technology for Civil, electrical Mechanical works, repair of all structures and all other works contingent thereto
Supply and Erection of Electrical Cables and other electrical works for High Mast Lights At Five Pond in Ward No 02 M.C Nissing. For L and C Society
Construction of Cc Paver Block Street 1. Near Well in Harijan Basti 2. Near Pond H/o Ankush to H/o Manoj at Village Sabepur Distt Yamuna nagar
Laying of PVC Pipe line From Khera Baba to Village pond and Fixing of Paver Block in Front of Khera baba at village Kherki Bhraman , Radaur (MP LAD)