Loading…
Loading…
63,465 results • Best match
Construction of 10 nos. recharge shafts in Tanks/Ponds in Bolagarh Block area of Khordha district
Renovation of 3 ponds in Mugaiyur under SFC DP 19-20 in Viluppuram District Package 060
Renovation of 7 ponds in Melmalayanur Block under SFC 19-20 in Viluppuram District Package 013
Rennovation of 7 ponds in Vallam Block under SFC 19-20 in Viluppuram District Package 009
Renovation of 6 ponds in Koliyanur under SFC DP 19-20 in Viluppuram District Package 040
Renovation of 7 ponds in Mailam under SFC DP 19-20 in Viluppuram District Package 057
2025-26 Eriyad GP -Jala raksha Jeeva raksha -Cleaning of Public thodu and ponds 177/25
Renovation of 4 ponds in Vikkiravandi under SFC DP 19-20 in Viluppuram District Package 054
Desiltation of ponds for Pandripani, Bhilai Bazar, Salora KH, Amgaon and Churail Village at Gevra Area
Construction work of deepening of ponds and strengthening of water supply line at Parikshitgarh Hatchery, Meerut
Renovation of 6 ponds in Vallam block under SFC 19-20 in Viluppuram District Package 012
Renovation of 7 ponds in Melmalayanur Block under SFC 19-20 in Viluppuram District Package 017
Improvements to 5 No.of Tank Ponds in Thiruporur Block in Chengalpattu District Having Package No.08
CONSTRUCTION OF 06 NOS RECHARGE SHAFT IN TANKS AND PONDS IN SONEPUR BLOCK UNDER SUBARNAPUR DISTRICT
Renovation of 2 ponds in Kandamangalam under SFC DP 19-20 in Viluppuram District Package 036
Renovation of Ponds and Tanks Under Harithakeralam Renovation of Kavukulam in Naduvannur Grama Panchayath Kozhikode Dt
Pitching work at water storage Ponds Chak 1 F Choti MN 18 and 19, Sri Ganganagar
Renovation of 6 ponds in Melmalayanur Block under SFC 19-20 in Viluppuram District Package 014
Renovation of 3 ponds in Vanur Block under SFC 19-20 in Viluppuram District Package 027
Renovation of 3 ponds in Koliyanur Block under SFC 19-20 in Viluppuram DIstrict Package 006
Renovation of 5 ponds in Vallam Block under SFC 19-20 in Viluppuram District Package 011
Renovation of 2 ponds in Merkanam under SFC DP 19-20 in Viluppuram District Package 059
CONSTRUCTION OF TWO WATER PONDS ONE EACH AT RF-NAYAN JUNGLE AND RF-MUSNOTA DIST.- MAHENDERGARH
Construction Of c.c drain from Harinarayan pradhan ponds chhako to amulya dutta house in W - 15
Rejuvenation of Nallathanneer Kulam (Ponds and Ooranies) Lining Wall, inlet,Outlet, Bathing Ghat in Kettavarampalayam Panchayat
Renovation of Tanks and ponds under Haritha keralam Renovation of Vannathi kulam in Kathirur panchayath Kannur
Renovation of 4 ponds in Merkanam Block under SFC 19-20 in Viluppuram DIstirct Package 024
PONDS GHAT AT SARKAR PARA NATUN PUKUR AT AMLAJORA APAS/01/276/271/0002 DATED 06.08.2025
Pakage-3 Sitai-II GP a)CONSTRUCTION OF PONDS PILING NEAR GIRINDRA NATH BARMAN HOUSE AREA
Renovation of 4 ponds in Koliyanur under SFC DP 19-20 in Viluppuram DIstrict package 038
Renovation of 2 ponds in Gingee Block under SFC 19-20 in Viluppuram District Package 007
Providing Temporary Illumination And Generator at various Artificial Ponds in Koparkhairane Ward for Ganpati Visarjan (2026)
Erection of mandap pagoda for Artificial ponds 01 Girgaon Chowpatty 02 August kanti maidan D ward
R/C estimate for cleaning/desilting of ponds in Chapad Chiri Kalan village, Mohali S.A.S Nagar.
Construction of 3 Nos of Ponds in Co. No. 52/S of South Range under CAMPA
Digging of catch drain around the Kundi dump with provision of siltation ponds under Magadh OCP
Cost of desilting ponds at Moonattumukku Anakkulam Chittiri I and chittiri II in ABP Range Kottoor
PONDS GHAT AT BAGDI PARA KALO PUKUR AT AMLAJORA APAS/01/276/271/0007 DATED 06.08.2025
Constructing Cattle Water Ponds ( On Langhane Road Near Amardham ) AT Village Bamhane TAL SHINDKHEDA Dist Dhule
Providing Temporary Illumination and Generator at various Artificial Ponds for Ganapati and Devi Visarjan in Ghansoli.
Providing Temporary illumination and Generator at Various Artificial Ponds in Airoli Ward for Ganapati Visarjan 2024
Providing Temporary illumination to various Artificial Ponds in Nerul Phase 2 Area for Ganapati Visarjan (2025).
Annual Plan Pathiyoor GP 101/24 Renovation of various ponds in Pathiyoor GP General Civil Work
Repairing and Renovation of Rearing Ponds Under DBT (Himalayan Bioresource Mission), at FoFy Rangil, SKUAST-K
Renovation of 5 ponds in Melmalayanur Block under SFC 19-20 in Viluppuram District Package 016
Renovation of 8 ponds in Olakkur under SFC DP 19-20 in Viluppuram District Package 049
Renovation of 5 ponds in Olakkur Block under SFC 19-20 in Viluppuram District Package 019
Renovation of 2 ponds in Kandamangalam Block under SFC 19-20 in Viluppuram District Package 003
Water harvesting and upgradation of different ponds(8nos) in various Tehasils of Raigarh District under CSR
CONSTRUCTION OF BRICK WATER CHANNEL FOR FILLING CANAL WATER IN PONDS AT WLS NAHAR DISTRICT REWARI