Loading…
Loading…
11,287 results • Best match
SPL REPAIR OF EXISTING DOORS WINDOWS AND MISC WORK IN BLDG NO P-170 AND LOLAB PUMP HOUSE AND ALLIED INFRA IN BLDG NO P-116 AT ZANGLI GRN UNDER GE 874 EWS
Construction of 125 mm dia Machine Drilled Hand pump Wells in Govt. Schools of District Kupwara
Providing, installation, testing and commissioning of fully automatic factory fabricated pump control panel at LIS Dangiwacha.
Construction of 125 mm dia machine drilled hand pump well at Haripora Shelipora in District Anantnag
Balance work for Construction of Protection Work near Pump Room and GSR at WSS Khodmong (JJM).
Construction of 125 mm dia machine drilled hand pump well at Lachi Mohalla Goswani Wooder Anantnag
FIDELIS HEALTHCARE Hemodialysis Blood Tubing Set Post-, FIDELIS HEALTHCARE Hemodialysis Blood Tubing Set Post-Pump Adult
Repairs to 05 cusec horizontal split casing pump at lift irrigation cum dewatering scheme Trikolbal old.
Const. of Pump Room cum Chowkidar quarter at Stage-1st under WSS Khore Bani (2nd call)
Construction of 125 mm dia machine drilled hand pump well at Near Masjid Shareef Chakpath Anantnag
Construction of 125 mm dia Machine drilled hand pump well at Gujar Basti Tantraypora Litter Pulwama
Repairs to 05 Cusec end suction pump unit no. 02 at lift irrigation scheme Delina main.
Construction of 125 mm dia Machine Drilled Hand Pump Wells at Kiyani Mohalla in District Anantnag
Construction of Hand Pump wells at Mech. Field Sub Division Budgam of MED Department Constituency Budgam.
Tile work Near Patrol Pump ward no.4 Pyt Kursari Block Bhaderwah (PRI Grant) 2nd Call
Construction of pump room cum operator quarter size 18x12 at stage IstDhara under WSS KalabanGyar Languishing
Construction of 125 mm dia machine drilled hand pump well at Katshipora Batpora SALLAR Upper Anantnag
Construction of 125 mm dia Machine drilled hand pump well at Herpora Shehlipora in district Anantnag
Repairs to 05 cusec V.T pump having head 96 Mtr. Of Lift Irrigation Scheme Zandfaran Zogiyar.
Balance work of Pump Room and other allied work at base Stage Ambkhori under WSS Ambkhori
Construction of (04 No) 125 mm machine drilled hand Pump wells at Mundigam in District Kupwara
Protection of LIS Akalpur Pump Room by way of laying wire knitted crates at Head site
Const. of 10000 glns capacity Sump Tank / GSR Near Pump Room under WSS Saim samath (NRDWP)
Repairs to 45 cusec V.T pump having head 12 Mtr. of lift irrigation scheme Janbazpora-I.
Repair to 4000 GPH x 280 meter head HC pump of pumping station Chakarbhati stage-0
Repairs to 5 cusec discharge pump unit No I along with allied works at LIS Harapeer.
Drilling of 125 mm Bore Hole and installation of Mark-II Hand Pump at Tandwal Nursery
Construction of 125 mm dia machine drilled hand pump well at Khanapora Newa in District Pulwama.
Rectification of leakages to 100mm ND, GI laid rising main at pump lift station Melhura Wachi
Construction of 125mm dia Machine Drilled Hand Pump Wells in schools of Kupwara Constituency District Kupwara.
Repairing and Maintenance of 02 nos Pump room at Hqr KOS CRPF Pantha Chowk Srinagar Jk
Electro Mechanical Repairing of the 30 KW Submersible slurry pump of WSS Kanipora Kalidar. (Annexure C)
Construction of 125 mm machine drilled hand pump well near Masjid Sharief Hardukuthal. Block Dachnipora, Anantnag
Repairs to 03 cusec horizontal split casing pump at Lift Irrigation Scheme Gundmacher of MISD Handwara.
Construction of 125 mm dia machine drilled hand pump well at Fareed Khan and Others Anantnag
Repair works to 04 cusec horizontal pump (Unit 1st) at LIS Lar Chanthan of MISD Ganderbal.
LV7 TATA Complete Overhauling of Rotary Pump 2.5 Ton BA No-12C-093035A BOQ Title OVERHAULING4
Constt of L Levelling P work of Graveyard near Patrol pump Kursari Pyt Kursari Block Bhaderwah
Providing and fitting of copper cable for 2nos. pump at pumping station Dibber alongwith allied works.
Construction of 125 mm dia machine drilled hand pump well at Ward No 5 Gundijaffar Anantnag
Construction of Pump Room building near Filteration Plant Tatapani under WSS Tatapani 26 x 12 NRDWP
Construction 01 No. 125 mm machine drilled hand pump well at Kral Check in District Shopian
Maintenance and Strengthening of colony boundary wall and Kachhariyan Pump Station at Salal Power Station, Jyotipuram.
Const. of Pump Room cum Chowkidar quarter at Jabbrian Dodasan under WSS Dodasan Bala (2nd call)
High Pressure Portable Pump for large fire fighting Bidder Turnover (Last 3 Years) 50 Lakh (s)
Mechanical repair works to bearing housing of 7.5 cusec VT Pump (Unit 2nd) at LIS Manasbal.
Construction of Hand Pump wells at Uncovered Schools falling under the Jurisdiction of PHE Division Awantipora.
L/F of pipes and providing panelling to pump operator quarter WSS Banimulla GB under JJM
Construction of Boundary Wall of Dispensing Pump at Transport Nagar, Jammu Adjacent to the passing ground
Providing installation testing commissioning of electromechanical components at pump room in Kambal Danga for IPD Reasi