Loading…
Loading…
11,279 results • Best match
Repairs of 5000GPHx150mtrs head Sub. pump installed at T/well Naryna (new) ,Repairs of 5000GPHx130mtrs head Sub. pump installed at T/well Choudrywala (new) and Repair of 5000GPHx225mtrs head Booster Pump installed at P/stn Sarmala.
Repair of 5000GPHx150mtrs head Booster Pump installed at T/Well Badgal New ,Repairs of 5000GPHx200mtrs head Booster pump of P/s Manani 2nd and Repairs of 10000GPHx90mtrs head Sub. pump installed at T/well Lower Naiwala
Repair of 1500GPHx60mtrs head sub Pump installed at T/Well Thandi choi, Repairs of 5000GPHx150mtrs head Sub. pump installed at T/well Panjtoot and Repairs of 5000GPHx200mtrs head Sub. pump installed at T/well Kallha old
nstallation of Hand Pump at Village Khiram Mohalla Ashdar Tehsil Srigufwara Anantnag.
Complete overhauling of Rotary Pump Assy, Repair of Front Half Shaft Assy
Portable Fire Pump Repair kit, Fuel pipe, Fan Belt, Spark Plug Cap, Benjo Bolt
Restoration of flood hit pumping machinery by repair/servicing of motor, starter, foot valves along with allied electro-mechanical works at LIS Pandorian.
Restoration of flood hit pumping machinery by repair/servicing of motor, starter, foot valves along with allied electro-mechanical works at LIS Seelam.
SUPPLY PUMP, TD PISTON, PRV VALVE, SOLENOID SWITCH, SERVICE KIT, MAIN SHAFT OIL SEAL, ARMATURE ASSY, FIELD COIL ASSY, POLE SCREW, BRUSH PLATE
Fuel Pump, Tie Rod assy, Regulator, Stator, Excle RH, Gear Shaft Rod 2.5 TATA, Brake Pipe, Pressure pipe, Brake pressure pipe, Half moon
PUMP COOLANT, ROTOR ASSY, CONTROL VALVE, ROLLER BEARING, NEEDLE ROLLER BRG, ROLLER BRG INNER, SLAVE CYL, CLOSING VALVE, SWITCH BRIDGE ASSY, FIELD COIL
Restoration by impregnation,rebuilding,strengthening of 02 No. 40 HP motors of pumping unit no. 1 and 2, strengthening and cleaning of 02 No. 3.5 cusec discharge H.C. Pump sets at LIS Saranoo Old.
photo frame, chari cushion, pannal light, T lamp, submersible pump, trimmer machine, scissor small, scissor big, hair brush, barber shop chair, calling bell, ups 1kv, odonil BOQ Title boq boiq boq
Fuel pipe tank to pump, Carburetor for Water pump, Fly wheel ring for 30 KV, Hour meter, Fan Belt, Washer, Fuel Filter, Oil Filter, Fan Belt 1135, Air Cleaner, Over Flow pipe, Air Cleaner element
REPAIR/ MAINTENANCE AND SERVICING OF DG SETS, PUMP SET ENGINES, REPLACEMENT OF OTHER ALLIED ACCESSORIES UNDER THE AOR OF AGE B/R-II OF GE 881 EWS
REPAIR/ MAINT AND SERVICING OF DG SETS, PUMP SET ENGINES, REPLACEMENT OF OTHER ALLIED ACCESSORIES UNDER THE AOR OF AGE B/R-II OF GE 881 EWS
Pump Assy Fuel, Coil Assy Ignition, Shoe brake rear, Bearing, Pad, Cable Assy Clutch, Unit Head lamp, Absorber Assy Shock, Cover Assy Clutch, Joint Assy Universal, Bush spring shackle, Oil seal rear axle, Belt water pump, Coolant pump Assy, Convoy lamp, Speedometer Cable, Wiper Motor, Water Separator, Starter Motor, Door lock Assy RH, Pressure pad torsion, Assy rear view mirror, Wiper arm and Blade, Handle Assy door, Regulator Assy RH, Regulator Assy LH, Strainer Filter
Compt overhauling of rotary pump and injector, Labour charge, Repair of complete assy of crown wheel pinion with brg, Compt overhaul of rotary pump and injector labour charge
SA of Pump Coolant, Armature Assy, Door Lock Assy LH, Solenoid 24V, Regulator Assy LH, Ram Hydraulic
PUMP FUEL INJECTION ROTARY, MOUNTING RUBBER, KIT EXHAUST BRAKE, HIGH PRESSURE PIPE, PIPE NON METALIC DIA 6
PUMP FUEL FEED COMPLETE, DG CONTROLLER UNIT, STOP SOLENOID, OIL SENDING UNIT, FAN BELT, ROCKER ARM, BOLT
Feed Pump Fuel, Side Mirror, Pilot Bearing, Hub Seal, Door Lock, K M Cable, Indicator, Water Saparator, Dueal Brake Valve
Fuel Feed Pump, Injector Assy Nozzle, Carburetor Assy, Brake Shoe Assy, Brake Disc Pad, Suspension Bush Kit, Hand Brake Cable
FUEL FEED PUMP, ASSY FUEL FILTER, FUEL FILTER, SPARK PLUG, KNUCLKE BRG, SENSOR, BOLT, G BOX HOUSING COVER FRT TOP
VANE PUMP REPAIR, GEAR BOX REPAIR, STRG GEAR BOX REPAIR, TFR CASE REPAIR, FRONT HUB SHAFT REPAIR, TURBO CHARGER REPAIR
PUMP ASSY FUEL, RELAY STARTER SOLENOID, SWITCH ASSY, BATTERY CUT OFF SWITCH, DOOR TRIM PANNEL RH, WEATHER STRIP F-7400850
Vane Pump Assy, Kit Pad Assy Front, Sensor Wheel Speed Rear, ABS Sensor, Assy Parking Cable, Sensor Wheel Speed Front
Redevelopment Stabilization and Providing Installation Commissioning of New 63 KVA Manual Voltage Stabilizer, cables, Three Phase Submersible Pumpset 15 HP 17.5 HP and automatic Star delta control Panel and Accessories for Tube well Station Sai B I
Providing, installation, testing and commissioning of 35,000 GPH x 68 mtrs. head submersible pumpset and 150 KVA voltage stabilizer along with allied works at Tube well Science College old feeding CPS Company Bagh under District Capex Budget
PITC of 40,000 GPH x 80 mtrs. Head HC pumpset for unit no. 01 and design, fabrication, installation, testing and commissioning of LT control panel along with allied electromechanical works at CPS Dhounthly under state capex budget
Repairs to VT Pump
Feed Pump, Brake Shoe Lining Assy Rear, Injector Assy, Pipe Radiator Outlet, S A Spring Shackle, U J Kit, Hose Nonmetallic, Tie Rod End
HYDRAULIC PUMP, CANOPY HOOD, COOLING FAN, LOWERING ROD, LOWERING ROD LINK, THERMOSTAT VALVE, DRIVER SEAT, AIR CLEANER, HOSE, OIL FILTER, FUEL FILTER, TOP LINK
Pump Element, Gasket Cylinder Head, Repair Kit Dual Brake Valve, Assy Radiator Pipe with Hose, Wiring Harness, Hose engine to radiator, Front Weather Strip
Restoration by way of supply installation of 3 ton capacity gantry inside the pump house with allied works at LIS Gurha 1
Repair and tuning of Rotary pump, Repair of Distributor head, Replacement of Delivery valve, Replacement of pump housing, Replacement of Sealing kit, Replacement of Roller, Replacement of Camplate, Replacement of Crossed disc
Rotory Pump Over Hauling Rotar Head TD Piston Pump Body Packing Kit Roller And Pin Valve New Fitteted, Inline Pump Over Hauling D Valve Packing Kit Govener Roller New Fitted, Radiator Assy Repair And Water Tank New Fitted, Brake Shoe Linnner New Fitted And Riviting, Cylinder Head Re Boraring
Repair and Overhauling Service - EDC Pump Overhauling and Repairing of Self Starter; EDC Pump Overhauling and Repairing of Self Starter; No; Buyer Premises
Balance work of pump room at stage 1 and construction of retaining wall and approach track stage 1 at pump room at bhawan.
Shifting of electro-mechanical components and other allied works from old pump room to newly constructed pump room at pumping station Kootha, Hiranagar
Overhauling of Rotary pump of Stln incl repair and replace of kit comma distributor head, Supply Pump, TD Piston, Vane Pump, Roller Shoe
Please refer BOQ
Day to day Electric Repair, Maintenance and service of Motor pumps installed at Gandhi Nagar Section Jammu for the period of ending September 2024. CNO13
Electric Repair and maintenance of motor pumps installed at Gandhi Nagar section for the period of April 2022 to September 2022. CNO04-NP (4th Call)
Day to day Electric repairs, Maintenance and service of motor pumps installed at Gandhi Nagar section for the period of April to September 2023.CNO05
Electric Repair and Maintenance of Motor Pumps installed at Gandhi Nagar section during the period of Sept 2021 to March 2022. CNO408-NP (3rd Call)
For fixing of rate contract for repairs to different types of damaged pumps and motors installed at various WSSs of District Ganerbal, Budgam and Srinagar
Day to Day Electric repairs, maintenance and service of Motors pumps installed at Gandhinagar section for the period of ending March 2026. CNO-410 NP