Loading…
Loading…
1,620 results • Best match
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bilaspur) ...
Construction of RCC Nala at Ward No 06 Malappa Camp Near Gop House to Railway Talab
Lifting and transportation of 2 LMT Coal from NLC Talabira minethrough Railway Siding under RCR mode
Supplying and Stacking of machine crushed stone ballast of 50 mm size for railway track as per RDSO specification between km 0.00 (kharsia) to km 74.00 (Dharamjaygarh) in connection with the maintenance of New BG Railway track of CERL
Loading and Transportation of Coal from Gevera Mines to Private Railway Siding Goods Shed in Bilaspur area MMBD PPBG PMBG KGB JAYRAMNAGAR NOVA PMCJ HSLH and loading of coal in Railway Wagons on RCR Mode SPOT AUCTION till JPL
Annual running maintenance contract of Rail-way siding at FSD Rajnandgaon (New Complex) (for the year 2020-21) (2nd Call)
Custom Bid for Services - Hiring of two trucks of 4 point 5 MT and two trucks of 1 MT one of each is for SSE PWay BYT and other for SSE PWay TLD for carrying of Railway materials under the jurisdiction of ADEN BYT for two years Similar Category Goods Transportation service - Monthly Based Service
"Electrical general construction work in connection with (i) Replacement of PI by EI at Kumhari and Sarona, (ii) Construction of Y-Link line from Durg direction line to Dallirajhara line at Maroda Yard and (iii) construction of EI building-01 no. & ... S.E.C. Railway "
Execution of earthwork, construction of PEB shed, DG shed, switch room, Scrap yard, Staff room, administrative building including canteen along with electrification works, Track Linking, Supply of ballast and other miscellaneous works in connection ... Central Railway .
ANNUAL RAILWAY TRACK MAINTENANCE OF JUNADIH SIDING OF SECL GEVRA AREA FOR A PERIOD OF ONE YEAR
ANNUAL RAILWAY TRACK MAINTENANCE OF WHARFWALL SIDING OF SECL DIPKA AREA FOR A PERIOD OF ONE YEAR
TRACK MAINTENANCE CONTRACT FOR PHASE-1 PRIORITY SINGLE LINE CONNECTINGNTPC LARA TO INDIAN RAILWAY NETWORK AT KOTARLIA.
Contract for housekeeping services and horticulture at Road Weighbridgesand Railway Siding Area in Talaipalli Coal Mining Project.
Button Bits for DTH Hammer (Q3)
As per SOW
Custom Bid for Services - Cleaning activities at MEMU Car Shed Bhilai for 2 years Similar Category ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) Cleaning, Sanitation and Disinfection Service - Outcome Based ... for Railways
Construction of 10 Nos. Type-II Railway Quarters under the jurisdiction of Assistant Divisional Engineer Manendagarh and improvement of way-side colony facilities including sloped roof, false ceiling, sanitary fittings, toilets, flooring, putty, doors & windows, kitchen flooring, rainwater harvesting system, chain-link fencing, and approach pathway under the jurisdiction of Senior Divisional Engineer North of Bilaspur Division.
Execution of P.Way works likes CTR(P), TRR(S), CTR(S), Renewal of turnout sleepers, Deep screening of points and crossings, and other track works in connection with Improvement and up-gradation of various railway yards (i.e.IB, BRJN, LJKR, BPH, HGR, BSMA, DAO, JMG & KRL) under the jurisdiction of Assistant Divisional Engineer/Brajrajnagar of Bilaspur division.
REPLACEMENT OF PANEL INTERLOCKING WITH ELECTRONIC INTERLOCKING, ALL INDOOR AND OUTDOOR GEARS, OFC HUTS, CONSTRUCTION OF S&T SERVICE BUILDINGS & ELECTRIFICATION OF S&T SERVICE BUILDINGS INCLUDING CABLING WORKS IN ADJOINING BLOCK SECTIONS OF BSPR, ... CENTRAL RAILWAY .
File/Folder (V3) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bilaspur) ...
Grease Graphite(V2) Conforming to IS 508 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bilaspur) ...
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bilaspur) ...
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover
thermal imager (Q2) MSE Exemption for Years of Experience and Turnover
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover
Notice inviting tender for purchase of one time unique no. wired seal to be used for locking railway wagons.
Repairing of Over bridge and fabrication of stair for coal sample collection at Railway siding of Rajnagar RO CHP.
CONSTRUCTION OF RAILWAY OVER BRIDGE ACROSS MUMBAI HOWRAH RAIL LINE ON SILIYARI MANDHAR ROAD AT LC 405 (SILIYARI GATE)
Providing consultancy services for progress Monitoring and presenting through Primavera EPPM based progress scheduler and providing a cloud-based for document controlling and storage
SUPPLY and SPREADING OF MACHINE CRUSHED RAIL TRACKSTONE BALLAST AS PER RDSO/INDIAN RAILWAY STANDARDAT TANDA/MGR BY RAIL/ROAD.
Replacement of bridge timbers with galvanised H-Beam Sleepers onexisting 03 nos steel girder bridges of NTPC-Unchahar Railway siding
Antiwear Hydraulic Oil Heavy Duty (V4) as per IS 10522 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bilaspur) ...
Augmented Welding Simulator (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case ... SECR, Indian Railways , ... Central Railway , ... of Railways (Fa ...
Silica Gel as per IS 3401 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bsp) ...
Axle Oil as per IS 1628 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate ... SECR, Indian Railways , ... Central Railway , ... of Railways (Pfa/secr/bilaspur) ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Railway Coaches at Coachinf Depot Bilaspur CG; Service Provider
1)Tyre defect gauge for Wagon, as per Indian Railway Standards made of 3.8 mm/3.1 mm thick stainless-steel plate with laser etched permanent marking used for inspection of condemn flange thickness, root, radius, sharp flange, deep flange, flatness of tread(60mm) etc., of wheel profile as per drawing attached. 2)Mechanical folding type Wheel Diameter Gauge 780 mm to 1030 mm (for B.G C&W)
Execution of earth work in formation, construction of major and minor bridges, construction of service building, retaining wall and drains, Supply and spreading of machine crushed stone ballast, transportation of P. Way materials, execution of P. Way ... Central Railway .
Transportation of 1 LMT of Coal from AKK, KARO OCP Siding of CCL toBokaro Railway Goods Shed under RCR mode for NTPC Bongaigaon.
As per SOW
LOADING AND TRANSPORTATION OF COAL FROM WCLs PENGANGA MINE TO VIMLARAILWAY SIDING (PVIT) AND LOADING IN INDIAN RAILWAY WAGONS FOR ONWARDTRANSPORTATION TO NTPC MOUDA
Handling, Transport and Other Mining Services - Percentage quote based - Loading of Coal into Wagons at Katora Railway Siding of Baikunthpur Area for 1825 Days
Handling, Transport and Other Mining Services - Percentage quote based - Loading and transportation of coal from Katkona 12 Incline bunkerpit head to Katora Railway Siding
Camera for CCTV System (V3) (Q2) (3 (3 ))
Platform Truck as per IS 10311 (Latest) (Q3) MSE Exemption for Years of Experience and Turnover
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2) (3 (3 ))
PVC Insulated (Heavy Duty) Electric Cables (V2) as per IS 1554 (Part 1) (Q2)
Radial Drilling Machine (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6464756 Dated : 04-08-2025 Bid Document 1/8 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Breath Analyser (Q3) (3 (3 ))