Loading…
Loading…
9,139 results • Best match
DNA Evidence Sample Collection Kit (IO) - Crime Scene Investigation Kit for Investigating Officer (Q2)
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) (3 (3 ))
Facility Management Service- Manpower based (Version 2) - Healthcare; Patient Support Services; Highly-Skilled, Facility Management Service- Manpower based (Version 2) - Healthcare; Patient Support Services; Unskilled
Evaporative Air Coolers (Desert Coolers) Conforming To IS 3315 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6451525 Dated : 14-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 68240 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Antiwear Hydraulic Oil (V3) as per IS 11656 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6957773 Dated : 03-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 43711.5 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover
Battery Secondary Lead Acid MT Type (Defence) (Q2) MSE Exemption for Years of Experience and Turnover
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6788569 Dated : 14-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 54396.8 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3) MSE Exemption for Years of Experience and Turnover
Mild Steel Wire for General Engineering Purpose as per IS 280 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6718176 Dated : 23-09-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 615550 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank HDFC Bank EMD Amount 12311 ePBG Detail Advisory Bank PUNJAB NATIONAL BANK (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 8 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Container Corporation of India Ltd ICD Tughlakabad. Container corporation of India Ltd New delhi-110020 (Container Corporation Of India Ltd) 2/7 Splitting
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6792982 Dated : 15-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 259600 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Platform Step Ladder (V2) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6623002 Dated : 29-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 80950 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Portable Single Operated Rectifier Type DC Arc Welding Set Suitable for Manual Arc Welding Process as per IS 4559 (Q2) MSE Exemption for Years of Experience and Turnover
Mild Steel Wire for General Engineering Purpose as per IS 280 (Q2) MSE Exemption for Years of Experience and Turnover
Mild Steel Wire for General Engineering Purpose as per IS 280 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7007346 Dated : 16-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 611455 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank HDFC Bank EMD Amount 12230 ePBG Detail Advisory Bank PUNJAB NATIONAL BANK (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 8 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Container Corporation of India Ltd Container Corporation of India Limited, Inland Container Depot, Tughlakabad, new Delhi- 110020 (Container Corporation Of India Ltd) 2/7
Air Circulator Type Electric Fan as per IS 2997 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6915786 Dated : 21-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
the 33 KV power line coming out from 220 KV sub-station RC Green Greater Noida under Dadri and feeding the 33/11 KV sub-station Kot, which is at km 1412/11-13 of Ghaziabad Tundla railway section under North Central Railway in Gautam Budh Nagar distri
Ward No.-5 me Purwa road Railway crossing ke pahle puliya se Mahendra Gupta ke ghar tak RCC nali nirman karya.
WARD NO 6 BADA GAON RAILWAY PHATAK SE JAGMOHAN KE PLOT SE NALE TAK MUKH SADAK KE BAYI AUR RCC NALE
WARD NO 6 ME BADA GAON RAILWAY PHATAK SE JAGMOHAN KE PLOT NALE TAK DAYI AUR RCC NALE KA NIRMAAN KARYA
Vidhyut Vitran Mandal Ghaziabad kr antergat vidhyut vitran khand muradnagar me railway crossing pr 33 KVA ka cable badalne ka karya.
Ward No 14 nadrai gate dindayal puram kaloni or purane etah road par railway line ki or interlocking nav nirman karya.
Ward No.(07/05/04) mein Railway chauraha omaprakash ke dukan se chaudhari charan sinh tiraha tak nala Safai ka kary
Construction of RCC Nala in Mohalla Avas Vikas I from house of Satveer Singh towards Railway line via Durga Saini house.
WARD NO 05 PATEL NAGAR ME VIDYUT TRANSFARMAR SE RAILWAY LINE KE SEEMA TAK INTERLOCKING ROAD V NALI KA NIRMAN KARYA
Mobile Storage Compactors (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance *In case any bidder is seeking exemption from Experience ... NCR, Indian Railways , ... Central Railway , ... of Railways 2/12
High Visibility Warning Clothes (V3) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance *In case any bidder is ... NCR, Indian Railways , ... Central Railway , ... of Railways (Pfa/ncr/pryj)
All in One PC (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder ... NCR, Indian Railways , ... Central Railway , ... of Railways (Sr
PIPE AND CABLE LOCATOR ROUTE TRACER (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In ... 221002, Indian Railways , ... Eastern Railway , ... of Railways (Fa ...
Zila Nidhi
5th state finance commission
AS PER BOQ
civil work in jila panchayat prayagraj
WORK
KHADANJA KARYA
CIVIL WORK
Refer to Tender Description.
Cutting Oil, Soluble as per IS 1115 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In ... Raebareli, Indian Railways , ... of Railways (Pfa/mcf/rbl/llj) ...
Toilet Soap as per IS 2888 (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case ... Varanasi, Indian Railways , ... of Railways (Pfa/blw)
Ward No.19 Thakurmanpur Chiriyakot Road Railway Crosing Darbari Vastralay Se Kaajha Khudra Mod Tak LED Street Light 120W With 7mtr Octagonal Pole Single Arm All Equpment Purchase And Installation Work, Ward No.19 Thakurmanpur Javahir Ke Ghar Se Baralai Gov School Se Pahle Tak LED Street Light 120W With 7mtr Octagonal Pole Single Arm All Equpment Purchase And Installation Work, Ward No.8 Mohalla Tajopur Rajbhar Basti Main Forlain Se Paniyra Nale Ke Pul Tak LED Street Light 120W With 7mtr Octagonal Pole Single Arm All Equpment Purchase And Installation Work, Ward No.14 Bakval Ke Dr. D Kumar Ke Aage Se Tempil NPP Sema Tak LED Street Light 120W With 7mtr Octagonal Pole Single Arm All Equpment Purchase And Installation Work, Ward No.14 Bakval Main Raj Inter Collage Mod Se Rahul Store Ke Aage Tak LED Street Light 120W With 7mtr Octagonal Pole Single Arm All Equpment Purchase And Installation Work
Nikay ke Ward No-15 me Bamba Road Par Railway Line ke Pass 40HP Motor Boring, Tubell v Kamra Nirman ka karya.
33 KV Line Shifting at Gwari Crossing (Northern Railway) near Janehwar Mishra Park under Deposit Scheme and related work Semi turnkey basis
Ward No 14 me bablu ke makan or purv me karaye gaye nale se lekar railway line or RCC nala nirman kary
Ward No 2 Harijan Basti Me Sri Virendra Madheshiya Ke ghar se Railway Border Line tak CC Road and Nali Nirman Karya
work of 11 KV underground cable of Bakalpur Feeder which is passing over Railway Line in deposit scheme under EDD Ist Etah.
WARD NO 4 MOH IDGAH ME KALIMUDDIN KE MAKKAN SE RAILWAY ROAD TAK C.C. SADAK VA U TYPE NALI KA NIRMAAN KARYA
STRUCTURAL STEEL WORK FOR BRIDGE SUPERSTRUCTURE STEEL GIRDER IN CONNECTION WITH EARTHWORK IN FORMATION INCLUDING FILLING,CUTTING AND COMPACTION,SUPPLY AND LAYING BLANKETING MATERIAL ON EMBANKMENT,EXTENSION OF EXISTING MINOR BRIDGES BY RCC BOX..
Please refer uploaded tender document
civil work
CONSTRUCTION