Withdrawing and relaying of 150mm dia DI pipe with necessary guard piling and all allied works at Ranibadh railway crossing of Joypur Water Supply Scheme, Joypur Block under Purulia Sadar Sub-Division, Purulia Division, PHE Dte
Open e-tender for the work of Different type of track activity like casual renewal of rail-sleeper-switch-SEJ, tamping of track, deep screening, casual renewal of fittings, assisting track machine and cleaning of drainage system etc. with other ... Engineer-II/Eastern Railway /Malda.
Manufacture and supply of Pre-Stressed Mono Block Concrete Sleeper (sets) (pre-tensioned type) for 1 in 8.5 B.G. (1673 mm) 60 E1 Turnout with 6400 mm 60E1A1 Thick Web Switch (Curved) with R260/R350HT grade rail for 25T Axle load with Weldable CMS ... Indian Railway Standard ...
Zone No. 3 (General zone) under AEN/2/HWH,, PE 30.06.2027 [Jurisdiction - All Civil engineering works : All staff Quarters and service buildings covering the area of Orthopaedic Hospital, Colvin Court, ChurchRoad, Cambridge Terrace, Telkal ghat, ... mansion, Railway Officers' ...
Open e-tender for the work of re-girdering of steel girder of Major Bridge No. 340/A (Span: 2x18.3 + 3x76.25 M) at Km. 211/7-9 in between station: Sujnipara - Jangipur Road in New Farakka - Azimganj section, Bridge no. 383/D DN line of Span (2x18.3 + ... Eastern Railway .
Running contract for Manufacture and supply of Pre-Stressed Mono Block Concrete Sleeper (sets) (pre-tensioned type) for 1 in 16 B.G. (1673 mm) 60 E1 Turnout with 11200 mm 60E1A1 Thick Web Switch (Curved) with R260/R350HT grade rail for 25T Axle load ... Indian Railway Standard ...
Zonal Contract for upkeepment of structures and repairs and replacement of pipe line, Fire Hydrants, water supply arrangements, sanitary and drainage arrangements inside and outside of RTS Box including all service buildings from km 01/4 to 07/14 ... Metro Railway ,
Zonal Contract for up-keepment of building and structures, water pipe line connections and water treatment plants and GM Bunglow at 8, Belvedere Park, Officers Flat at 90, Chowringhee Road, 6, Ramesh Mitra Road and 200X, S.P. Mukherjee Road, Officers ... Metro Railway , ...
Monthly Basis Cab & Taxi Hiring Services - SUV; 1000 Km x 360 hours; Local 24*7
Goods Transportation service - Monthly Based Service - Within city; Machinery & Equipment, Open tender for Hiring of one vehicle Truck for transportation of track and other Railway materials required for day to day maintenance of Track under SSE PWA..
Construction of Two numbers Electric Sub-Station for WTP and Pit Line and Nine numbers biodigester at different location along with one UV tank at Shalimar Station in Howrah District for South Eastern Railway in West Bengal
Reconstruction of cement concrete High Drain in place of damaged brick boulder high drain Starting from near House of Arun Kumar Patra to existing high drain beside railway coal yard within ward no. 04 under Bankura Municipality.
Different works related (sinking of Tube-wells at Maro Dakshin Para, LDSs, Interconnections, FHTCs, Construction of MARO P.W. Supply Scheme for obstruction of Railway under Galsi-I Block, of Durgapur Sub Division, under Burdwan Division, PHE Dte.
RESTORATION OF ROAD DISTURBED BY W.S. DEPARTMENT FOR LAYING OF 800MM DIA RESERVE MAIN ALONG E.M. BYE PASS FROM METRO PIER NO. P-25 NEAR BAGHAJATIN RAILWAY CROSSING TO PATULI CROSSING IN WARD NO. 110, BR-XI.
Improvement Bituminous road 1) S/f Railway Hospital to Sani Mandir (Bazar Road) with Mastic Asphalt over Bituminous Macadam Paver Finish and 2) Bazar Road to H/o Poritosh Biswas at Matangini Colony Ward No- 28 (RETENDER)
MS Pipeline Crossing by adopting Trenchless Technology for RAILWAY CROSSING in between Bamangachi and Duttapukur Station incl. the cost of casing and carrier pipe,all labours,materials tools and tackles,cleaning of site etc.of Habra-Gaighata mouzas
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with clearing of jungles from the bank and slope of Adiganga Channel inbetween Laxmikantapur Railway Culvert downstream Ch 13200 m and Bhadurighat upstre
Repairing of Drain with Slabes over Drain at No. 6 Railway Siding Bye Lane, from house of Faiz Ahmad H/No. 67 to house of Mr. Murtaza H/No. 49, in Ward No. 9, Under Bhatpara Municipality.
Relaying of duly laid 200mm dia CI Distribution main at Bundla village with 400 mm dia MS casing pipe (Partly) for crossing proposed railway track of RTPS under Raghunathpur W/S Project of Purulia Mechanical Division, PHE.Dte
Surveying, design, drawing ,Supplying and laying of M.S. Conduit 600mmdia. (internal)10mm thick. as casing pipe and 300 mm dia.(internal) 8mm thick. carrier pipe across, underneath the Railway Track in between Bongaon Jn.to SatberiaHalt Pit -67.09mt
Emergent Rain damage repairing work at the Diversion Road beside under construction R.O.B. over 14 no. Railway Level Crossing Gate at Chainage between 15.00 kmp and 16.00 kmp of Baidyabati Tarakeswar Champadanga Road under Hooghly Construction Divisi
MS Pipeline Crossing by adopting Trenchless Technology for RAILWAY CROSSING in between Chandpara and Bibhutibhusan Station incl. the cost of casing and carrier pipe,all labours,materials tools and tackles,cleaning of site etc.of Habra-Gaighata mouzas
MAINT. OF PAVER BLOCK FOOTPATH FROM TIPU SULTAN MOSQUE TO TOLLYGUNGE RAILWAY BRIDGE ALONG D. P. S. RD AND TIPU SULTAN MOSQUE TO DHAKA KALI BARI ALONG P. A. SHAH RD IN WARD NO-89, BR.-X
Procurement of flood fighting materials along with close surveillance of Mayurakshi Right Embankment in between Ch. 18.29 Km (Downstream of Sainthia Railway Bridge) to Ch. 41.95 Km (Shaogram) in Block PS-Sainthia Labpur, Dist-Birbhum during monso
M/R to clearing and removing weeds and water hyacinth inbetween D/S of Rathtala weir and U/S of Railway bridge of river Banka within Burdwan Municipality under Edilpur(I) Sub- Division within Damodar Canal Division,
Improvement Bituminous road With Mastic Asphalt over Bituminous Macadam paver Finish i) s/f Railway Traffic to Mugaram Sweet Shop (Bazar Road ) ii) Desh bandhu para Bottle Factory to Mazdoor colony .... under ward no-28. (3rd Call)
Supply and erection of Containerized Cabins with suitable Furniture, Split AC, Electrical fittings etc wherever applicable for site offices for use as office cum shelter at road weigh bridge, Railway siding and at mines areas of WBPDCL
Laying of new water pipeline with supplying and laying of 200 mm dia., 150 mm dia. And 100 mm. dia DI(K7) pipe from and near Panchbaga Railway Crossing Katjuridanga within ward no. 24 under Bankura Municipality
Supplying, fabrication, insertion of 600mm dia. (ID) 10mm thick MS casing pipe line 75m. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique underneath the Railway Track under Zone-I, Mathurapur-I Block within Falta-Mathurapur Mega Scheme.
Cleaning, Jungle Cutting, removal of debris, water Hyacinth, weeds and floating materials time to time (as and when required) of Borrowpit adjacent to railway line within Dum Dum Municipal area, for maintaining smooth drainage path throughout for
Cleaning, Jungle Cutting, removal of debris, water Hyacinth, weeds and floating materials time to time (as and when required) of Bhutbagan AC Club to Eastern railway WTP Within Kanchrapara Municipal area, for ....6(six) months. (2nd call).
Design Supply Erection Testing and Commissioning 25 kV 50 Hz Single Phase Conventional type Overhead equipment and Associated modifications at GM Yard and BH Yard of HDC Railway Network under Haldia Dock Complex SMPK on Kharagpur Division
Custom Bid for Services - Maintenance & Up keeping of Digha officer rest house (ORH), Digha subordinate Rest House (SRH) for a period of two years (24 months each) S E Railway Similar Category Facility Management Service - Outcome Based
Custom Bid for Services - Mechanized cleaning with removal of Industrial Waste and Material handling work at Loco shed Bardhaman, Eastern Railway for a period of 02 (two) years Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
Custom Bid for Services - Mechanized cleaning with removal of Industrial Waste and Material handling work at Loco shed Bardhaman, Eastern Railway for a period of 02(Two) years Similar Category Cleaning, Sanitation and Disinfection Service - Outcome Based
DVC/DSTPS/Electrical Maint.- 2/SnT/34
AS PER NIT AND BOQ.
Bashudevpur Railway crossing to Dakbanglow Road from 0.00 kmp. to 0.60 Km., 2.30 km. to 2.80 km., and 4.50 km. to 5.66 km. patch repairing work (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027.
INSTALLATION OF 2 NOS SOLAR LIGHT NEAR RAILWAY OVER BRIDGE WITH IN BANCHUKAMARI WITHIN KHAGRABARI GP, COOCH BEHAR PANCHAYAT SAMITY CODE APAS/01/003/232/0001 CODE APAS/01/003/232/0002 CODE APAS/01/003/232/0003
Laying of pipeline at left out portions of secondary grid in different locations (Near NP 26 Along the railway track, Jointing at Mollapukur, Jointing both side of Bunorhat more, Jointing near Rakhal thakur mandir Netra, Jointing near Sonamukhi
Laying of 33 KV 3X400 Sq.mm XLPE UG Cable for Mogra 33/11KV Substation from existing 4pole structure to 4pole structure under Railway track crossing near Ashokenagar saswanghat, Bay to terminal DP Kaipukur Kalimandir under.under Barasat RE Projec
Supplying, fabrication , insertion of 700 mm dia (ID) 12mm thick MS casing pipe line 75 mtr. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique underneath the Railway Track in between Basuldanga station and Gurudasnagar station and in betwee
Cleaning and removing Water hyacinth , floating materials debris ,jungle cutting for 6 month of Kaccha Khal of Kaccha Khal from Nimtala via railway culvert near Sadhu Ashram towards SonaliShibir Club(Badekhalinagar M.F.P school) in ward no-14,15 und
Providing Functional Household Tap Connection (FHTC) from existing dist. system within the command area of NANDAI PWS Scheme at opposite site of railway track at Malatipur, Nagargachhi, r, Durgapur habs,Kalna - I Block under Burdan Division. PHE Dte.
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles along with clearing of jungles from the bank and slope of Adiganga Channel inbetween Kalyanpur downstream Ch 10020 m and Laxmikantapur Railway Culvert Ch 13200
Sinking of Tubewell with installation of Submersible Pump at Balidangri UHandWC Ward no 06 and at laying of pipeline beside mansur ali house from sanu house near railway jhil at kanakpur under Ward no -01 within Panskura Municipality .
MS Pipeline Crossing by adopting Trenchless Technology for RAILWAY CROSSING in between Guma and Ashoknagar Station incl. the cost of casing and carrier pipe, all labours,materials tools and tackles,cleaning of site etc. of Habra-Gaighata mouzas.
Railway crossing at Dakshin Bishnupur Rail gate for laying 1422mm dia for 1000mm dia MS Rising Main with suitable protection against extreme sand blowing by using jacketing and soil stabilization by concrete grouting with compressor under Mega Surfac
Design, supplying and Laying of 250 mm dia M.S pipe through 800mm dia. M.S casing ( not below 20 mm thick ) for a span of 45 Mtr.(approx.) by jack pushing method under Eastern Railway track underneath Mogra Tribeni......
MS Pipeline Crossing by adopting Trenchless Technology for RAILWAY CROSSING in between Sanhati and Maslandapur Station incl. the cost of casing and carrier pipe, all labours,materials tools and tackles,cleaning of site etc. of Habra-Gaighata mouzas.