Loading…
Loading…
8,470 results • Best match
Customized AMC/CMC for Pre-owned Products - CNC Axle Turning Lathe Dept no LMS 153; SUNKAP Automation Limited; Comprehensive Maintenance Contract (CMC); As per Scope of Work; Yes
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local
Hiring of Agency for IT Projects- Milestone basis
Facility Management Service - Outcome Based
Annual Maintenance service-AIR CONDITIONER
Catering Service per Packet based - Non-Veg; Breakfast; Plate, Catering Service per Packet based - Non-Veg; Lunch; Thali, Catering Service per Packet based - Non-Veg; Snacks/High; Snacks Packet
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; upto 3; PACKAGE-4 : Water purifier and conditioning system maintenance involving basic servicing, ..
Monthly Ambulance Service (All Inclusive) - All inclusive service; Type B Patient Transport Vehicle; Single Stretcher Regular Van; Maruti Suzuki Eeco Care
Cleaning, Sanitation and Disinfection Service - Outcome Based - Workshop Premises; Mechanized Dry sweeping of the shop floor area by Push Sweeper Vaccum Cleaner Mopping Machine etc and deposition the swept materials eg dust dirt iron dust chips etc t.., Cleaning, Sanitation and Disinfection Service - Outcome Based - Workshop Premises; Collection segregation and deposition of various types of ferrous nonferrous scrap and non mettalic saleable and unsaleable scrap including Rubbish at the Nominated Pl.., Cleaning, Sanitation and Disinfection Service - Outcome Based - Workshop Premises; Mechanized Scrubbing removing and cleaning of oily greasy muddy area of the shop floor by Electric Scrubber Machine and removal of scrubbing material to the nominated .., Facility Management Services - LumpSum Based - Workshop premises; Transportation service; Consumables to be provided by service provider (inclusive in contract cost), Cleaning, Sanitation and Disinfection Service - Outcome Based - Workshop Premises; Mechanized Manual Sweeping cleaning swabbing of floors cleaning of Cobwebs Walls Window and Door Glasses Ceiling false ceiling tables and Chairs furnitures curtains c.., Cleaning, Sanitation and Disinfection Service - Outcome Based - Workshop premises; Mechanized/Manual Sweeping Washing Cleaning of Urinals toilets bathrooms service latrines wash basin water booth cleaning of cobwebs walls and removal of blockages of .., Cleaning, Sanitation and Disinfection Service - Outcome Based - Workshop premises; Intensive Pit Cleaning All mud accumulated water oil Scrap Garbage to be removed Scraping to be done until concrete floor exposed Sweeping the entire pit Collected mud..
Jack Pushing of Railway Track from station deshpran and henria of augmentation of Bajkul Zone-III piped Water Supply Scheme of 600 mm dia ms casing pipe and 150 mm dia ms carrier pipe in between mast no 29/18 to mast no 29/19 with in Contai Sub Divn
Renovation of Drains at different place at 16 no to 14 no Round Tank Lane , 13 to 10 no Round Tank Lane, 9 to 7 no Round Tank Lane, 1 to 5 no Round Tank Lane , 6 to 10 Church Road and near Orthopedic Hospital railway and near Howrah Maidan ward29
Jack Pushing of Railway Track from station nachinda and kanthi of augmentation of Contai Saline Area Zone-I (Phase-B) Piped Water Supply Scheme of 600 mm dia ms casing pipe and 150 mm dia ms carrier pipe in between mast no 47/13 to mast no 47/14 wit
Desilting of drain at,1)129 to 162/2 Bellious Road,2)Howrah Amta Road(Shanpur Pollice St,)to Howrah Amta Road (Dasnagar Railway Bridge),3)158/6 Bellious Road to 20/A Musalman Para Lane,4)26 Makardah Road to 50 Natabar Paul Road,5)14 Makardah Road to
Desilting of drain at,1)129 to 162/2 Bellious Road,2)Howrah Amta Road(Shanpur Pollice St,)to Howrah Amta Road (Dasnagar Railway Bridge),3)158/6 Bellious Road to 20/A Musalman Para Lane,4)26 Makardah Road to 50 Natabar Paul Road,5)14 Makardah Road to
Tender
Tender for ECV Above Rs.50 Lakhs (Discount Bid)
TENDER FOR ECV ABOVE 50 LAKHS
TENDER FOR ECV ABOVE 50 LAKHS
Tender for ECV Above Rs.50 Lakhs(Discount Bid)
Construction of RCC Drain with slab from 1) H/O Anish to Manoj(Railway Nayanjali) 2) H/O Nasim to H/O Moajin via H/O-Parwez to H/O-Kalu at (Uttar Dalkhola Rahmat Nagar)3.Sanjay Mahato Shop to near Kabristan(NH-34 Undepass) at ward no- 15 under HFA
Open e-tender for the work of Maharajpur- Bikramshila-Rehabilitation of bank/sub- bank by Cess repair for Senior Section Engineer/P.Way/Sahibganj Under Assistant Engineer/ Sahibganj at KM (Km 218-220.5DN,220.9-223DN,224-230.7DN,231.9- ... Engineer/II/Eastern Railway /Malda.
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2)
Foot Operated Pedal Bin or Bucket for Bio - Medical Waste Collection (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6514402 Dated : 30-07-2025 Bid Document 1/5 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 23970 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Computer Printer (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Cordless Brushless Impact Wrench (ONGC) (Q3) MSE Exemption for Years of Experience and Turnover
Rust Remover Solution (Q3) MSE Exemption for Years of Experience and Turnover
Dual Chamber Temporary Pacemaker (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6645655 Dated : 04-09-2025 Bid Document 1/6 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Household Refrigerating Appliances as per IS 17550 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6934669 Dated : 26-11-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 35000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2)
Office Chair (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6416878 Dated : 12-07-2025 Bid Document 1/6 Past Performance 30 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
CPAP Machine (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7087901 Dated : 08-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
CPAP Machine (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7044522 Dated : 26-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Calico Triangular Bandage (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7002880 Dated : 26-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 11468.32 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Microscopes Slide Coverslips as per IS 3099 (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6926532 Dated : 25-11-2025 Bid Document 1/5 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 97704 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Computer Table (V2) (Q2) MSE Exemption for Years of Experience and Turnover
Multifunction Machines MFM (Q2) MSE Exemption for Years of Experience and Turnover
Executive Table (V3) (Q2) MSE Exemption for Years of Experience and Turnover
Serological Water Bath (FSSAI) (Q2) MSE Exemption for Years of Experience and Turnover
Xlpe Cables, Category C2 - FR - LSH, for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) (Q3)
All in One PC (V2) (Q2) MSE Exemption for Years of Experience and Turnover
ECG RECORDING PAPER (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6620906 Dated : 28-08-2025 Bid Document 1/5 Estimated Bid Value 86641 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Semi Automated Urine Analyzer (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6681313 Dated : 13-09-2025 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Cotton Yarn Waste (V2) as per IS 5485 (Q3) MSE Exemption for Years of Experience and Turnover
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2)
Xlpe Cables, Category C2 - FR - LSH, for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) (Q3)
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2)
Sterile Hypodermic Syringe (V3) (Q2) MSE Exemption for Years of Experience and Turnover
Acellular Dermal Matrix (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6342708 Dated : 13-06-2025 Bid Document 1/5 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 228285 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Patient shifting rollers (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6990612 Dated : 12-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 94996.7 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2)