Supply, erection, testing and commissioning of DTC and LT line to the consumer affected due to submergence area of Lower Wardha Project at Rajapur and Itlapur, Tal. Arvi, Dist. Wardha
Est.No./ 122063 /2024-25 / Providing 315 KVA Transformer, HT line MCCB panel And Providing 250 KVA Diesel Generator with Allied Accessories at Cardiac Cath lab Unit of District Hospital Dharashiv Tq.Dist Dharashiv(Recall)
Providing, installing, testing and commissioning power supply for New L.T. connection with HT Line and other allied electrical work for making power supply for PW pumping at WTP Site in Gat No 39.
Dismantling of existing 22KV Pargaon Waghivali HT Line obstructing NMIA project by conversion of existing 22KV Supply feeding to Waghivali village in to 11 KV supply from 220KV TATA Power switching station at Waghivali
DESIGNING, PROVIDING, ERECTING, TESTING AND COMMISSIONING OF 11 KV EXPRESS FEEDER INCLUDING DISTRIBUTION TRANSFORMER, 11 KV HT LINE FOR AVAILING POWER SUPPLY FOR HEAD WORKS LIMBOTI DAM AND WATER TREATMENT PLANT AT BANVAS SHIVAR
Est.No. OW/Pbn/ 101 /2024 25 PROVIDING EI , 10KWP SOLAR ROOF TOP, FIRE FIGHTING ARRANGEMENT, LIFT (6 PASSENGER), STREET LIGHT, 200 KVA TRANSFORMER AND HT LINE IN NEWLY CONSTRUCTED NAGARPALIKA BUILDING AT GANGAKHED DIST PARBHANI.
PROVIDING ERECTING TESTING AND COMMISSIONING LT LINE CONNECTION WITH 22 KV/0.432 KV / 100 KVA TRANSFORMER SUB STATION FOR POWER SUPPLY CONNECTIONS AT RAW WATER PUMPING STATION AT LONAVLA. TAL - MAVAL , DIST - PUNE.
Est.No.OW/Pbn/ 39 /2024-25 Providing E. I , Street Light ,Fire Fighting , LT Line and Solar Rooftop in Proposed New Administrative Office Building at Parbhani Dist Parbhani ( PART-A,B,C,D,E)
Providing, installing, testing and commissioning power supply to New H.T. connection (Express Feeder) with HT Line and other allied electrical equipment for making power supply for RW pumping at NimnaDyanganga Dam site from MSEDCL Rohana substatio
Est.No.111081 of 2025-2026 Prov. Shifting of 11 KV and 33 KV HT Line and Feeder Pillers due to road Widening and Prov. Steert Light at SSC Board Rajendra Nagar Morewadi Road Kolhapur, Dist.kolhapur. Dist.Kolhapur.
Shifting of HT/LT Line network due to proposed road widening work at Ekatmata Chawk to D.K.Corner under USD II s/dn in 1.3perc shifting work. (Part I- Ekatmata Chawk to college stop LHS
E.No. 1299 of 2020-21 Prov. and erecting HT, LT Line and 100 KVA T.F. centre for Agriculture Connection in Dhule Rural Constituency at Kuvthal, Tal. and Dist. Dhule. (Recommended by Public representative M.L.A.)
Est No N1 2025 2026 27 Providing Shifting of DTC HT LT Line due to road widening work from Ekdara Pati MDR 22 12 350 12 450 To Ekdara Village Tq Nanded Dist Nanded
Conversion of overhead HT Line into UG Cable due to Proposed Road widening work at Ekatmata Chawk To MSG College under USD II s/dn in 1.3per Shifting work. ( Underground 11 KV Malegaon I and II feeder)
pole
E.No. 4117 of 2020-21 Prov. shifting of 11 kV Devi Feeder and LT Line due to road widening for Khare Kharjune - Hingangaon - Kedgaon Burudgaon Road near FCI Godown at Kedgaon Tal. and Dist. Ahmednagar.
Shifting of LT Line Electrification of Grampanchayat Building Providing Electric supply to Smashan Bhumi and Dafan Bhumi Under 1.3 percent DDF Scheme of MSEDCL at Rehabilitated Village Sonarli Tal Hatkanangale Dist Kolhapur under Warana Project
pole
Providing installing testing and commissioning power supply for New LT connection with HT line and other allied electrical work for making power supply for RW and PW pumping machinery at Head works Gat No. 188 site and WTP Site
Shifting of LT Line at S.No.212, Azad nagar in Prabhag No.16 under USD III s/dn in 1.3 per DDF Scheme. Sanction No.MPSL / MLG / USD-III / Shabbir Nagar / 1.3 per Shifting / 2020-21 / 12 date
pole
Providing installing testing and commissioning power supply for New LT connection with HT line and other allied electrical work for making power supply for RW pumping machinery at Gat No 17 at village Kahupatta shivar and PW pumping machinery etc....
Providing installing testing and commissioning power supply to New HT connection Express Feeder with HT Line and other allied electrical equipment for making power supply for PW pumping at Gut No 170 at Village Hiwara BK Tal khamgaon Dist Buldhana
Supplying, Erecting, Testing and Commissioning of 3 phase 11/0.433KV, 50Hz, 25 KVA Outdoor Type, Aluminium Wound Transformers and 11KV HT Line etc. for Power Supply to jack Well at G. No.-550, A/P - Kadgoan, Tal - Gadhinglaj Dist - Kolhapur.
pole
pole
pole
Supplying and erecting solar street light ,solar highmast,DTC centre,LT line at Diliprao Lande wasti parisar,Badhade wasti,Magar wasti,Adhat wasti,Shinde wasti,Newasa road Lande wasti,Bairagi wasti,Kshitre wasti,Maliwada,Dake wasti,Harijan wasti,Sath
Est. No. 3104,3105/2022-23 Providing Electrical Installation ,Street light , HT LT line with 63 KVA Transformer at Newly Constructed PHC Bulding and 2 no MO Qurter and 4 no Staff Qurter at Kanegaon, Makani ,TQ- Lohara , Dist. Osmanabad.
Providing internal electrification to new Samaj Mandir,Bus Shed, Funeral Shed, Public Toilet, Public School building for village Berdi(New) to be rehabilitated , LT line for extended area , area street lighting and off Grid Roof top solar power pack
Est.No.132333 of 2025.26 Prov. Replacement of Flood Light, Tube, Fan, cable, MCB, DB etc, for Workshop No.02 Power Wiring MCB, Dpan etc for Workshop No.01 and Underground cable supply and Replacement of HT line at ITI Karad Tal.Karad Dist. Satara.
Providing installing testing and commissioning power supply for New L.T. connection with HT line and Other allied electrical work for making power supply for RW pumping machinery at Ajispur having gat No. 32 on Yelgaon Dam site and for PW PM etc.....
Supply erection testing and commissioning of 11 KV Transmission line from 11 KV MSEDCL Parale Kodali Line Tapping Point To Tilari Chowk Sub Station for Tillari Dam Colony and 3 Phase 5 Wire LT Line for water supply arrangement at Tillarinagar
Shifting of HT / LT Line network due to Proposed Road widening work at Old Aagra Road from Ansar Patra Depot To Owadi Nala along the Left side of road under USD I s/dn in 1.3 perc Shifting work.(PART I )
Prov. shifting of LT single phase 3 wire over head line, 3 phase 5 wire over head line near Yantrik cycle mart LT Line affecting to road widening work at Satana Bhakshi-Dodheshwar road at Satana, Tal. Satana, Dist. Nashik.
Shifting and conversion of LT line by means of laying of new U/G cable abstacle to road construction from yerame to gurnule madam house to ajay tepalwar house at ward no 15 nr shopping complex under municipal council mul
pole
electric
Est.No./ OW/Pbn/26/2024-25 Providing EI work, Fire Fighting System and Transformer HT Line,Pump and solar rooftop in Newly Constructed Type-I Qtr (24 Nos ) in the premise of PWD Parbhani Dist - Parbhani (Part-A,B,C,D,E)(2nd call)
Est.No.Pbn/ 35 /2024-25 Providing EI work, Street Light, LT Line, Fire Fighting, and 3 KWP on Grid Solar Rooftop in Proposed New Qtr (6 Nos) for officer of Trauma care centre at Rural Hospital Jintur Dist Parbhani ( Part A,B,C,D,E )
Est.No.Pbn/ OW/27/2024-25 Providing EI work, Street light,Transformer HT and LT line,Fire fighting, Pump and 3 KWp on Grid Solar Rooftop in Proposed Type II Common Pool Qtr (16Nos) at Parbhani Dist Parbhani ( Part-A,B,C,D,E,F)(2nd call)
Est.No.Pbn/OW/41 /2024-25 Providing EI work, Fire Fighting System, Street Light, Transformer HT LT Line,Pump and Solar Rooftop in Newly Constructed Residential Qtr of Type-I (12 Nos ),Type II (24 Nos), Type III (8 Nos), Type IV ( 1 Nos ) in the pre
Est.No.Pbn/ OW/22/2024-25 Providing EI work,Fire Fighting Arrangement,100 KVA TF with HT and LT Line,Street Light,Submersible Water Pump and Solar on grid Rooftop in Proposed Class-3 and 4 Qtr (16Nos),Class-2 Qtr(3Nos),Class-1(1Nos) Quarter at Purna
Estimate for providing of 1 no of 100 KVA ,22/0.43 KV Dist. Transformer, 0.10 km 22 KV HT Overhead line with 0.5 Km LT line by Aerial Bunch Cable for giving fresh 1 No of 3-ph Public Services Connection in respect of M/s. Mukhyadhikari Mokhada
Shifting of HT/LT Line at Nijamiya Masjid To Pawar wadi Road (Nomani Nagar 60 ft. Road) in Raunkabad-II section of USD III s/dn in 1.3per Shifting work. Sanc. No. MPSL/ MLG /USD III/ Raunkabad-II/ 1.3 Shifting/ MMC/ 2021-22/35 date 06/08/21
Technical Estimate For Shifting Of Existing 01 No Of PWW Consumer In R/O Sarpanch Grampanchayat Samode (Consumer No 086105000440) From 11KV Samode AG Feeder To 11KV Samode Gaothan Feeder At Village Samode Total Load 13 HP Raquired 11KV HT Li
Est.No.Pbn/12/2024-25 Providing EI work,FireFighting System,Street Light,100 KVA Transformer,HT and LT Line,Pump and 3 KWp on Grid Solar Rooftop in Newly Constructed PWD Qtr Type-II(12Nos)Type IV(1Nos)at Selu Dist Parbhani(Part-A B C D E F)(2nd call)
VV-SAMPLE ISO LT,SS316,7BAR, ROTAMETER,GLS TUBE INDCTR,0-29LPH,ST-5, VV-SAMP ISOL VLV-HT,SS316,280BAR, REGULATOR,PRESS-PRVDT14N,SEPL, VALVE,HT LINE SAMPLE ISO,SE-HTV-14OD, PR REDUCER -VRTS,SS316,SEPL,VRTS-4-400, BACK PRESS RED VALVE,SEPL,BPRV-4-250, PRIMARY COOLER ASSY,SC-6-18-INCO,SS316