Loading…
Loading…
23,131 results • Best match
CONSTRUCTION OF 11 KV LINE FOR BELPATTI JAL JEEWAN MISSION JJM SCHEME UNDER EDD PITHORAGARH
Providing for Shifting/Dismentling of 11 kv Line at Barman Tendukheda Dhobi Road Distt. Narsinghpur.
Construction of 11 KV Line under Business Plan 2025-26 EDD Deoria Gauribazar and Salempur
11 KV line shifting work in deposite scheme in the area of EDD-2 Moradabad.
11 KV line shifting work at Sanchi University of Buddhist Indic Studies Salamatpur distt Raisen.
02 NOS WORK OF BIFERCATION AND CONSTRCTION OF 11 KV LINE UNDER EUDD VII NOIDA
shifting of 11 KV Line by underground cable Ranjeet Nagar GSS to 200 Bypass Alwar
VARIOUS SITE EXISTING 11 KV LINE SHIFTING WORK IN NAVEEN JILA VIDHUT VIKAS NIDHI YOJNA
The work of 11 KV Line Augmentation under EDD, Banda-Rural (Business Plan 2025-26)
VARIOUS SITE 11 KV LINE DAMAGE SINGLE POLE DOUBLE POLE REPLACE AND OTHER MAINTENANCE WORK
Stringing 11 KV line using ABC from Konnakkoottam to Chitra Jn under Electrical Section Ezhukone
VARIOUS SITE EXISTING 11 KV LINE SHIFTING WORK IN NAVEEN JILA VIDHUT VIKAS NIDHI YOJNA
Work regarding 11 KV line against deposit scheme in the area of EUDSD-III, Muzaffarnagar
kothari nadi kshetra me ban rahe bridge ke liye 11 kv line shifting ka karya
200 feet ring road par nahar ke pass 11 kv line underground karne ka karya
Estimate for Replacement Theft conductor 11 KV line at various locations Feeders in Hastinapur Dc
100 K V TRANSFORMAR AND 2 KM 11 KV LINE WORK AR BHADERU TRENCHING GROUND
Work of Construction of 11 kv line and feeder Biferfaction under Summer plan 2022-23
Utility Shifting of 33/11 KV Line at Shabhalpura Stand to Bhadhadar Chauraha Distt. Sikar
Work of Construction of 11 kv line and feeder Biferfaction under Summer plan 2022-23
Construction of 11 KV line under Electricity Distribution Division-Kopaganj in Business Plan 2025-26
11 KV Line AND Other Maintenance Work under M AND R / O AND M Head
Work for Maintenance 33/11 KV Line, Pol etc, R/L Under EDD-II Baghpat
Shifting of 11 KV line and Transformer at Parikrama Path near Gauri Somnath Mandir Omkareshwar
Business Plan 2025-26 11 KV Line Work Under EDD-Kulapahad Mahoba (Semi-Turnkey Basis)
WORK PROPOSED FOR NEW 11 KV LINE AND DISTRIBUTION TRANSFORMER INSTALLATION UNDER VIDHAYAK NIDHI HEAD
CONSTRUCTION OF 11 KV LINE CONECTION FOR WATER SUPPLY PLANT AT NIGAI GHAT (DEDICATED FEEDER)
Supply of 5 KV Insulation Tester for 11 KV line at Teesta-V Power Station
Constructing 11 KV line of 1.1km from Ottamaram DTR to Kanchiyar Gurumandiram under ES Kanchiyar
CONSTRUCITON OF 11 KV LINE FOR GWASIKOT PEYJAL PUMP UNDER JJM SCHEME UNDER EDD PITHORAGARH
11 KV Line extension and substation work at Way side amenities at Rahatgarh distt Sagar
Construction of 2.1 KM 11 KV line for providing Power supply to Singhanath Pitha, Badamba.
Reconductoring 11 kV line with Covered conductor from Gosthalakkavu to Sambranikkodi under Electrical Section Kanjiramkuzhy
CONSTRUCTION OF 11 KV LINE USING RACCOON FROM PATTARMOOLA TO BAMBRANAI UNDER ELECTRICAL SECTION, CHERKALA
Work regarding 11 KV Line against deposit scheme in the area of EUDD-III, Muzaffarangar.
Utility Shifting of 33/11 KV Line at NH 27 to Pumping House Distt. Baran
Estimate for 11 KV Line form S s Garethi to Garethi Pump under Piprai Dc
Shifting of 11 KV Line at Sharda Nagar Nehru Ward Multai under Multai (T) DC
Work of Giving Various type connection and 11 KV line shifting under EDD-I Amroha.
11 KV Line Shifting Work at Amlawadiya Road Behind Housing Board Colony Ward No. 24
Providing electric connection and Construction of 11 kv Line under Vikash Nidhi Yojna 2023 24
CONSTRUCTION AND BIFURCATION OF 11 KV LINE UNDER BP 2023-24 IN EDD I BHADOHI
Estimate. for 11 KV Line Interconnection under SEMRIHARCHAND D/c O and M DN SOHAGPUR
CONSTRUCTION OF 11 KV LINE FROM PERIYATTADUKKAM TO EMRALD TRANSFORMER UNDER ELECTRICAL SECTION, PERIYA BAZAR
STRENGTHENING OF 11 KV LINE WORK IN BP 2026-27 UNDER EUDD 11 KV YEIDA
11 KV LINE CONSTRUCTION USING ABC 120 SQ.MMUNDER MALAPPURAM PACKAGES-No .2 under ES Karuvarakundu.
Regarding removal of wires and poles of 11 KV line in Alamganj Ward No. 17
The work of Construction and Bifurcation of 11 KV line Under EDD, Chandpur and Noorpur.
Estimate for 11 KV Line form S s Garethi to Garethi Abadi under Piprai Dc
Construction of 11 KV line with 11KV/0.415KV, 63 KVA substation for CGS Jalalgarh, Purnea