Loading…
Loading…
20,369 results • Best match
Road safety works on major district roads/other district roads/rural roads under road safety in the financial year 2024-25
CARRYING OUT ROAD SIGNS AND ROAD SAFETY WORK AS PER ROAD SAFETY IMPROVEMENT PLAN UNDER GUIDANCE OF TRAFFIC POLICE ( PART 2 )
Road Safety Work 2022-23(Non plan)-Providing Sign boards and Other road safety boards in various roads under Perinthalmanna Section-
GENERAL-Road Safety 2022 - 2023 - Providing road safety measures infront of various schools in various roads under PWD Roads Section Pala
Sabarimala Road safety works 2025-26 - KRSA - -Providing painting and other Road safety items for various roads under Roads Section Konni
GENERAL-KRSA- Sabarimala Road Safety Work 2025-26-Providing Road safety measures in various roads in Kottayam section-General Civil Work
ROAD SAFETY ESTIMATES FOR THE FINANCIAL YEAR 2021-22- Providing Road safety measures in various roads under PWD road section payyanur
Road safety works on major district roads-other district roads-rural roads under road safety in the financial year 2024-25
Short and long term improvement work related to road safety on black spots identified on various MDR ODR under road safety
GENERAL-Road Safety on Valanchery koppam road-Providing road safety work between km 5/029 - km 13/525-General Civil Work
GENERAL Providing Road safety works at Sankaramangalam Kovilthottam road in Chavara LAC Road safety work-General Civil Work in Chavara LAC
GENERAL-Road safety-Road safety works at 10th mile in Ettumanur-Ernakulam road at Ch.43/000-General Civil Work-1
Road Safety work Km. 281.00 to 307.600 of NH 53 (Old NH 06) Raipur-Durg four lane road (Road Safety measures)
Providing for Thermoplastic paint on various roads under Provincial Sub Divisional P-II PWD BandR Br., Bahadurgarh (For L and C Society)
Providing road safety works
Construction of link road from Dehrian to Balah km 0/0 to 3/450 Formation cutting Passing places Retaining walls Breast wall Crash barrier Cross Drainage Works GSB WBMII WBMIII Tarring works Cement concrete pavement Interlocking paver block Drain Pa
Installation of Crash Barrier in 03 (Three) different stretches in between 20 Km to 41 Km of Malda -Manikchak - Ratua - Samsi Road (SH-10) under Malda Division, PWD, in the district of Malda, during the year 2023-2024 (2nd Call).
Improvement of black spot on Chamba Sahoo road km 0/0 to 16/0 (SH Providing and fixing crash barrier at Rd 5/800 -6/020 ,6/210 to 6/330 , 7/010 to 7/070 , 10/800-10/860 ).
Improvement of black spots on Jhurni More Chintpurni Talwara road) to Nangal via Sunhet road SH Providing and fixing crash barrier between RD 0/550 to 0/650 150mtr and RD 1/200 to 1/300 180 mtr TOTAL 330 Rmt
Request for Proposal (“RFP”) issued by NHIT Eastern Projects Private Limited (NEPPL) for Engagement of Agency/Firm for Construction of RCC Crash barrier in Place of existing RCC/Steel Railing for Orai-Bara Project in the state of Uttar Pradesh.
Restoration of Rain Damages on Chamba Tissa road Km. 0/0 to 5/500(SH Construction of PCC B/wall at RD 1/060 to 1/067 and Retaining wall at RD 1/060 to 1/071 with Crash Barrier )
AR and MO PWD Roads under Division SER 1 during 2021 22 SH Providing water tanker with GPS tracking system and hydraulic jet facilities for day to day cleaning of kerb stone crash barrier footpath railing plants and planters etc
Sarak Suraksha Karya ke antargat Stop Sign board, Speed limit sign board, Hazard sign board, Chevaran sign board Cautionary sign board, Edge line, Centre line, Delinators Post, Crash Barrier, Repited bar etc work on Blackk Spot and important road CD2
Construction of Protection wall at km 3/700, minor bridge at km 5/200, Crash barrier and R.C.C.gutter from 13/00 to Km 14/00 on Banpuri Kargani Chinchghat to join SH.151 road MDR-51 in Tal-Atpadi Dist-Sangli.
CONSTN OF RUMBLER STRIP,METAL CRASH BARRIER,RETAINING WALL,INFORMATION BOARD ON CHINCHOLI WAGHOLI INZALA PIMPALGAON YERANWADI ARVI WADNER TEMBHA DONDUDA SHEKAPUR ( BAI) SELOO KOLHI DHIVRI PIPARI SAWNGI YERLA TO NH7 RD MDR-41 IN KM45/00 TO55/00 TAL HI
A/R and M/O to various roads under North East (B and R) Maintenance Division dg. 2023-24. (SH- Providing and Fixing RCC Crash barrier along the open drain at Service Road from Fire Station to drain No. 01 at ....
Improvement of Central Verge with Precast RCC Crash Barrier under Shalimar Bagh Elevated Flyover, Grass paver Block and Toe wall at Ring Road from Azadpur to Britannia Flyover and fixing of polycarbonate sheet at Wazirpur Flyover under PWD Division N
P. W. North Division, Pune in the jurisdiction of the division. Installation of metal crash barrier, construction of parapet wall and other ancillary works for traffic safty inthe Ghat length of State Highways (SH) in Ambegaon, Shirur, Junnar, Khed a
Construction of link road from Dini Kumb Dhanara road km 0.0 to 5.040 Under NABARD RIDF XXIX SH Construction of 5.7mtr. wide formation cutting and Retaining walls Brest walls and crash barrier cross drainage Providing and laying GSB Wet Mix Macadam
PROVN OF CRASH BARRIER AT VARIOUS LOCATIONS ALONGWITH PROVN OF DRAINAGE, COVERED SLAB SYS FOR DISPOSAL OF ANIMALS WASTE AND URINE INCLUDING 02 NOS SOAKWELL AT ANIMAL TRANSPORT DETACHMENT 852 AT COY ASC (GS MULES) TENGA UNDER GE 859 EWS
Construction of Crash Barrier wall in central verge at Vikas Marg after Yamuna Bridge stretch and RCC toe wall at Yamuna Bridge to Delhi Sachivalaya Loop under Sub-Division East Road-IV of PWD Division East Roads, Delhi during 2022-23
A/R and M/O various road under PWD division south west road-I during 2023-24. (SH- Improvement of central verge with RCC crash barrier and upliftment of toe wall at BJ Marg under sub division-I, New Delhi).
Const. of crash barrier, road delineator, parapet, etc. in (1) Majra Bhuddi Shekhowala Dharmawala (SH-80), (2) Laxmipur Langha road (3) Langa Madrasu road and work of installing signage for traffic safety on other rural motor roads in Distt. D.Dun.
Improvement of Blackspots on Parel Kohlari road Km. 0/0 to 12/500 P/F crash barrier in Km. 1/460-480, 3/320-350, 4/300-332, 5/230-278, 5/520-550, 5/820-862 and 7/10-150)
Construction of crash barrier, wing walls, wearing coat, retaining wall, approach slab and balance work for construction of new culvert over Nala near khanajiguda petrol bunk junction in ward no -135 , Alwal Circle-27, GHMC.Administrative sanction Dt:26.05.2025.(2nd Call)
Construction of approach slab, crash barrier, retaining wall, footpath and CC road of balance work for construction of new culvert over Nala near khanajiguda petrol bunk junction in ward no -135 , Alwal Circle-27, GHMC ( 2nd Recall) ( Item No.04)
Providing and applying white cement base putty and Painting on Crash barrier (Inner Side) of V.R Bridge of WJC Main Branch at RD 59500, RD 75200, Budhakhera Disty at RD 0, RD 2100, RD 8100 and Jundla Disty. at RD 0.
Repair and raising of existingdamaged RandomRubble Masonry roadside drain cum footpath at Km.324 and Km.325 (at Jakhalabandha Town), providing hardshoulder with ICBP at Km.337, 338 and 339 including wire-rope crash barrier at stretches of Burapahar A
Redevelopment of Central Verge on various Roads under Division WR-2 Delhi during 2025-26. (SH Providing and Fixing of Precast crash barrier/Jersey barrier at Central Verge on Vishal cinema road, Shiv Mandir road, Road no. 28, Shivaji college road
Supplying and Erection of Crash Barrier at different locations on roads- Budhan to Lancha, Budhan to Thurooback, Chaklass to Dharian, Chaklass to Pari, Shajroo to Chakrass, Kund to Cheeral, Shajroo to Malas and Lancha to Hariwala of PMGSY Div Mahore
Short Term Maintenance Contract STMC of Guhagar Chiplun Helwak Karad road NH 166e from Existing Km 26.890 to Km 41.200 and Km. 54.260 to Km. 74.600 Total Length.35.31 Km District Ratnagiri and Crash barrier painting ,MBCB,Sign board,Culverts,Bri
Providing and fixing Crash barrier km. 11.230 to 11.480
Painting lines,dashes,zebra crossing,crash barrier,studs etc.
Providing and Fixing Crash Barrier in Adali Industrial Area
SH CO Crash Barrier at RD .79.080 to 79.130
SH Providing and fixing Crash Barrier at various RDs
P/M of D/sala Dadh Plp Holta Chadiyar Sandhol road DRRP No. HP 0402 MDR078 (AMP 2023-24 MDR Roads) (SH- P/L 30 MM thick B.C. with Paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 28/00 to 29/00)
P/M of D/sala Dadh PLP Holta Chadiyar Sandhol road DRRP No. HP 0402 MDR078 (AMP 2023-24 MDR Roads) (SH- P/L 30 MM thick B.C. with Paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 32/00 to 33/00)
P/M of D/sala Dadh PLP Holta Chadiyar Sandhol road DRRP No. HP 0402 MDR078 (AMP 2023-24 MDR Roads) (SH- P/L 30 MM thick B.C. with Paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 29/00 to 30/00)
PROV LAY AND COMPACT WITH SENSOR PAVER OF READY MADE BITUMINOUS HMP MIX FOR DBM 50 MM THICK COMPACTED BC 40 MM THICK COMPACTED INCL ROAD MARKING WITH THERMOPLASTIC PAINT FOR SURF WKS BET KM 0 TO KM 3.495 ON ROAD PT NT AND FROM VIKRAM POST TO KALI