Loading…
Loading…
903 results • Best match
Estimate for construction of speed breaker Installation of retro-reflectorised traffic Signs and Road Marking for different black spot of Churaman Natunbazar to Madhabpurghat Road under Uttar Dinajpur Highway Division in the District of Uttar Dinajpu
As per bid document
Carrying out Road Safety Audit of existing roads of State Highways of SH10, SH12 and SH16 in Package 1, in the State of West Bengal.
Naxalbari--Ambari Road from 0.00 kmp to 14.00 kmp for Surfacing work including Road safety works under North Bengal Division in the district of Darjeeling.
Road safety measures on PMGSY roads wlthin the Raipur Block (4 Nos Road) WB03776, WBO3417, WB03665 under WBSRDA, Bishnupur, Division in the District of Bankura.
Road safety measures for Pathar Kumkum at 17th Km of Kalaberia - Pirakata - Dhansole - Lalgarh Road under Midnapore Highway Division in the District of Paschim Medinipur
Mirzapur Banshihari road (SH 10), from 22.09 Km to 32.09 Km, Road Safety work, under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur.
Providing, fitting and fixing road signage by writing This Road is Maintained by P.W.D., Govt. of West Bengal n This Bridge is Maintained by P.W.D., Govt. of West Bengal under Baruipur Sub-Division PWD during the year 2019-2020.
Additional work for Road marking for safety point of view at Kalitala to Situlia Bazar road via Bishpur, Rupamari, Banstali from 33.4 kmp to 42.00 kmp under Barasat Division PWD in the district of North 24 Parganas.
Urgent remedial measures to reduce road accidents including fixing of mandatory road singes, road marking an allied items at very important road junctions namely Venus More and Hospital More at Kutchery Road, Siliguri under North Bengal Construction
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Putty for use on Window Frames as per IS 419 (Q3), Ready Mixed Paint for Road Marking as per IS 164 (Q3) (3 (3 ))
Road safety measures on PMGSY roads within the Kotulpur Block (O4 Nos Road) WB0575,WB03565,WB03643, WB03ADBO1 under WBSRDA, Bishnupur Division in the District of Bankura.
Strengthening of wearing surface by providing mastic asphalt and surface drainage work, road safety works for the road from Jorebunglow to Tiger Hill, GTA Length 5.00Km.
Bolpur Nanoor Road - Road Safety Works and Protective Work for newly constructed Culverts under Birbhum Division PWD in the district of Birbhum during 2023_2024 Balance Work
Emergent Road Safety work for slip occurd at 23.20km of Bagora -Kalijhora Road under Kurseong Sub Division, PWD in the district of Darjeeling during 2025-26
Karimpur town bypass road (Natna more to Bathanpara via Kolaberia) at chainage 1.00 Kmp road safety work under Nadia Division P.W.D. during the year 2025-26.
Road safety measures on PMGSY roads within the Sarenga Block (04 Nos Road) WB0320, WB0321A, WB033O, WB00144, under WBSRDA, Bishnupur Division in the District of Bankura.
Road Safety Measures On PMGSY Roads Within the Indus Block (5 Nos Road) WB0311.WB0358,WB0359, WB0370, WB0374 Under WBSRDA, Bishnupur Divlslon In theDistrlct of Bankura.
Improvement of riding quality of Carriageway of Gariahat Flyover by repair of potholes, premix carpet, application of seal coat, application of thermoplastic paint etc. during the year 2025-2026.
Improvement of riding quality of Carriageway of Khidderpore Flyover by repair of potholes, premix carpet, application of seal coat, application of thermoplastic paint etc. during the year 2025-2026.
Road Marking Paints to Kachuberia Gangasagar Road, Road No. 5 and Chayergheri to Sridham via Chemaguri Road instretches at sagar Island under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G.S Mela 2022.
Road marking on existing speed breaker/table top/bumper at Haripal Block and Tarakeswar Block for upcomming Shrabani Mela 2025 and also for road saafety on Baidyabati-Tarakeswar-Champadanga Road under Hooghly Construction Sub-Division-III, PWD under
Providing Retro reflective Road Marking, Supplying and fixing of raised Cats Eye reflection panels at Aurobinda Pally main Road starting form Netaji Subhas road to river Jorapani and construction of Height barrier at ward - 19, 20 and 22
Road safety works for Black Spots at Bongaon- Bagdah- Boyra Road under Barasat Division PWD in the district of North 24 Parganas during the year 2021-22..
Road safety measures for Midnapore - Keshpur Road (SH-7) at Elahiganj (3rd Kmp) and Keshpur (20th Kmp) under Midnapore Highway Division in the District of Paschim Medinipur.
Krishnagar-Karimpur-Jalangi Road (SH-11) - Temporary road safety measures on Black spots under Nadia Division, P.W.Dte. in the district of Nadia during the year 2025 - 2026
Road safety works for Black Spots at Halencha- Sindrani- Duttafulia Road under Barasat Division PWD in the district of North 24 Parganas during the year 2021-22
Road safety work for Implementation of Traffic Calming Measures and development of Junctions where lower hierarchy road (VOR/ODR) meets higher hierarchy road (NH/SH/MDR/ODR).
Road safety measures on PMGSY roads within the Patrasayar Block (5 Nos Road) WB0346, WB0373, WB03508, WB03509, WB03519, under WBSRDA, Bishnupur Division ln the District of Bankura.
Traffic Calming Measures and other road safety works along Ranihati - Haridaspur - Amta road under Howrah Highway Division in the district of Howrah during the year 2025-2026
Emergent road safety work at 15.805 km of Suri-Rajnagar Road(SH-6) under Suri Highway Subdivision of Birbhum Highway Division-II, in the District of Birbhum.
Improvement of riding quality of Carriageway of Park Street Flyover by repair of potholes, premix carpet, application of seal coat, application of thermoplastic paint etc. during the year 2025-2026.
Painting of road kerb including road marking and other allied works of D H Road in between metro pier no 160 to 120 in different stretches under Alipore Division in connection with Gangasagar Mela during the year 2024 25
Painting of road kerb including road marking and other allied works of D H Road in between metro pier no 80 to 40 in different stretches under Alipore Division in connection with Gangasagar Mela during the year 2024 25
Painting of road kerb including road marking and other allied works of D H Road in between metro pier no 200 to 160 in different stretches under Alipore Division in connection with Gangasagar Mela during the year 2024 25
Painting of road kerb including road marking and other allied works of D H Road in between metro pier no 120 to 80 in different stretches under Alipore Division in connection with Gangasagar Mela during the year 2024 25
Painting of road kerb including road marking and other allied works of D H Road in between metro pier no 40 to 9M in different stretches under Alipore Division in connection with Gangasagar Mela during the year 2024 25
Painting of road kerb including road marking and other allied works of D H Road in between metro pier no 240 to 200 in different stretches under Alipore Division in connection with Gangasagar Mela during the year 2024 25
Fulbari to Ambari-Falakata road for emergent repairing of potholes and damaged road surface (in stretches) from chainage 1.00km to 2.00km and 6 nos. junction point improvement by speed breakers, road marking and allied road furniture items under Jalp
Balurghat Laskarhat Road from Ch-4.10km to 5.40km, Urgent Road Safety Work under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the Year 2024-2025
Implementations of Road Safety Measures of Uluberia Shyampur Road under Uluberia Highway Sub-Division of Howrah Highway Division in the district of Howrah during the year 2024-2025
Road safety measures on PMGSY roads within the Jaipur Block (6 Nos Road) WB03317,WB03307,WB03309, WB03454, WB03585,WB03641 under WBSRDA, Bishnupur Division in the District of Bankura.
Matigara Kurseong Road from 11.00 Kmp to 15.00 Kmp in stretches, Surfacing and Road Safety works under Darjeeling Highway Division, in the district of Darjeeling., Project ID PD222365439S000.
Road Safety measures at Kharagpur-Keshiyari Road SH-5 from 0.000 Kmp to 27.00 Kmp under Midnapur Division ,P.W.D in the District of Paschim Medinipur, Project ID PD222367218S000
Installation of Cautionary / Regulatory / Informatory Signs and Road Safety Furniture at various Roads under Quality Control Sub-Division under Murshidabad Highway Division No.II during the year 2019-20
Construction of pedestrian pathway with railing, drain, landscaping and road safety works from Circuit House to Nadia Collectorate Office in the district of Nadia under Nadia Division, P.W.D.
Road safety measures on PMGSY roads within the Simlapal Block (6 Nos Road) WB03687, WB0363, WB03674, WB03478, WB03402, WB0319, under WBSRDA, Bishnupur Division in the District of Bankura.
Estimate for road safety work at Elahiganj at 3.20 km on Midnapore - Keshpur Road under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Improvement of riding quality of Carriageway of Cossipore Lock Gate Flyover by repair of potholes, premix carpet, application of seal coat, application of thermoplastic paint etc. during the year 2025-2026.
Khatra Ranibandh Road, Ranibandh Jhilimili Road, Simlapal Khatra Road repairing work of worn out thermoplastic paints over table top and allied work under Bankura Highway Division in the district of Bankura.