Loading…
Loading…
26 live19 closing this weekmost from Department Of Military Affairs and Madhyanchal Vidyut Vitaran Nigam Limited Lucknow
26 results • Best match
Revenue Based Services - H1 Evaluation - Disposal of scrap/unserviceable metallic/non metallic stores
Auction for Battery, Tyers and Condemn Scrap available in PMC.
Revenue Based Services - H1 Evaluation - Disposal of UNSV/scrap items
Revenue Based Services - H1 Evaluation - Disposal of UNSV/scrap items
Revenue Based Services - H1 Evaluation - Disposal of UNSV/scrap items
Revenue Based Services - H1 Evaluation - Disposal of UNSV/scrap items
Revenue Based Services - H1 Evaluation - Disposal of UNSV/scrap items
Revenue Based Services - H1 Evaluation - Disposal of UNSV/scrap items
SPECIAL REPAIR TO ELECTRICAL INFRASTRUCTURE WITH REPLACEMENT OF UNSERVICEABLE LT CABLE, LT PANELS ALONGWITH CERTAIN ALLIED WORKS UNDER AGE (I) AYODHYA.
Imp. Nala from sanjay Gandhi Nagar in Chaturvedi building puliya to golden armi public School via Parihar scrap and supplier in ward 65 Zone 03
Replacement of old and obsolete electromechanical type replay panel
Replacement of old and obsolete electromechnical type replay panel
Custom Bid for Services - RECOVERY OF STEEL SCRAP FROM USED RUNNER CUPS AS PER TERMS AND CONDITIONS ATTACHED ANNEXURE A Similar Category Disaster Recovery as a Service (DRaaS)
Construction of RCC drain from the Family Restaurant to the scrap shop on the eastern side opposite City Hospital in Ward No. 18 Dr. Shyama Prasad Mukherjee Nagar.
Replacement of Old and obsolete Electromechnical type replay panel at 132 KV Substation Kalpi
REPAIR MAINT OF EXTERNAL ELECTRIC, HVAC SYSTEM, FIRE FIGHTING, FIRE ALARM AND STP AND PUMPS OF PARACHUTE BLDG AT ADRDE TECHNICAL AREA AND REPAIR REPLACEMENT OF OLD UNSERVICEABLE PIPE LINE INCLUDING REWINDING OF MOTOR, AND OTHER CONNECTED WORK AT ADRD
As described in BOQ
Dismantling Demolition of existing structures buildings at Jawaharlal Nehru Commercial Complex located at Englishiya Line Varanasi UP on As is Where is basis Including Razing Knocking Down Tearing Down of All Structural and Non Structural Components ... and Unserviceable Materials, ...
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Hospital; CAMC of Greaves Make DG Set; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Hospital; Deduction of cost in terms of percentage on ... the scrap /old ...
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 90 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 90 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
PCC pole 9 m long, STP 11 mtr long, ACSR Dog conductor., 33 KV XLPE Cable (3x120 sq. mm), 33 KV O/D Cable box size 3x120 sq. mm, 33 KV I/D Cable box size 3x120 sq. mm, 34 KV I/D Straight through size 3x120 sq. mm, 33 KV line isolator, 33 KV Metering ... of scrap from ...