Loading…
Loading…
13,246 results • Best match
A Mtc of EPHS in Sector 3 UE Kurukshetra Construction of manhole Brick work plaster RCC slab manhole cover complete in all respect and all other works contingent there to
Construction of 2 Nos. Disposal , Laying of Storm Water Lines and Construction of Manholes
Development of Rain Water Harvesting Pits, Cleaning and Washing of Gravels, Making of Manholes
Providing fixing of SFRC manhole cover with frame complete in all respect
Construction of manhole chamber of existing sumbersible pump and Laying of Pipeline
Providing and laying of SW pipe line 200mm dia construction of manhole
Providing and laying of SW pipe line 200mm dia construction of manhole
Providing fixing of SFRC manhole covers and frames marked with IS 12592
Construction of Roads, Providing and laying of Water Supply, Sewerage and SWD Scheme for Mukhyamantri Awas Yojna in Sector-28, U/E, Pinjore Kalka Urban Complex (Deposit Work) (including three years maintenance and defect liability period free of cost
Annual maintenance of water supply pipe line for the year 2023-24 (Falling under Municipal Corporation, Karnal) Leakage Repair/Remove Sewerage waste water DI/AC/PVC drinking water pipe line in various size 80mm, 100mm, 150mm, 200mm, 250mm,(recall)
Rough cost Estimate for Providing and laying 400mm Dia. MS Pipe line and 2Nos. 50Hp (960 RPM ) Submersible andMono Block Motor Pumping set non clog for sewerage, 600KVA Transformer and Electrical item for smooth functioning sector 14 sewage Disposal
Providing and laying of 200mm id PVC 10 KGCM2 pressure pipe for rising main for disposal of sewerage effluent of Sector 19 20 Sirsa and construction of temporary disposal works Supplying erecting testing and commissioning of sewage submersible pump
Annual maintenance of Sewerage scheme in Sector 19P III Sirsa. Providing and laying 90mm outer dia HDPE pipe for supplying tertiary treated water green belt park and all other works contingent thereto Including one year maintenance and defect liabili
Daily cleaning, sweeping within the New Grain/Fruit Vegetable Market, Sector- 16 and Fish Market Sector- 22, Faridabad. All the toilets, clearing sewerage line and staff quarter area within NGM/NVM, Sector- 16 and Fish Market, Sector- 22, Faridabad
Annual maintenance of Sewerage scheme in Sector 3P I, Fatehabad. Providing and laying 90mm outer dia HDPE pipe for supplying tertiary treated water in green belts parks and all other works contingent thereto Including one year maintenance and defect
Annual maintenance of Sewerage scheme in Sector 19P I Sirsa. Providing and laying 90mm outer dia HDPE pipe for supplying tertiary treated water green belt park and all other works contingent thereto Including one year maintenance and defect liability
DNIT for Restoration of damages carried out for providing sewerge Network and all ancillary works including construction of pumping station STP Sewerage Treatment Plant on SBR technolocy alongwith O M for 5 Years in Karnal Town under AMRUT Progra
Daily cleaning sweeping within the Grain Subzi Mandi All the toilets cleaning sewerage line office premises canteen within NGM NVM Panipat SY Babarpur office building and PC Babail Seasonally are to be cleaned daily including back side of sh
Construction of Road Providing Water supply and Sewerage Scheme in Sector 19 Balance Liabilities Supply and laying of earth GSB Water Bound Macadam 20mm thick premix carpet tack coat seal coat prov lowering jointing cutting of 100mm DI pipe
PROVIDING AND LAYING 100MM DIA DI WATER PIPE LINE CONNECTING PLOT NO 617 TO 625 AND 600MM DIA SEWERAGE LINE IN PLOT NO 357 CONNECTING MAIN DISPOSAL LINE PACE CITY 2 SECTOR 37 WARD NO 9 UNDER MCG.Re-call
Annual maintenance of sewerage scheme in Sector 9 and 11, Hisar. Opening, fitting and rewinding 50HP non clog sewage submersible motor and pumping set Aqua make at disposal sector 9 and 11, Hisar and all other works contingent thereto
HEW 106 Construction of road, Providing and Laying of Water Supply, Sewerage System, Storm Water Scheme, Flexible Pavement Road and Rain Water Harvesting In Marginal Land Sector - 79, Faridabad i/c 3 yrs defect liability period free of cost
A/Mtc estimate for the expense of O and M Sewerage scheme Nilokheri Town Distt. Karnal under PHESD, Nilokheri. Contract for outsourcing of Services / Activities for job work for Sewerman in Nilokheri Town under Public Health Engineering Sub Division,
Maintenance of sewerage lines Sub City-I, Gurugram. Providing services of pump driver (Round the clock) for operation of pump, D.G. set, maintenance of pump including repairing/rewinding of 50 HP, 25 HP sewage submersible pump for continuous flow.
Daily Cleaning, sweeping within the New Grain Fruit Vegetable Market, Dabua, faridabad. All the toilets, clearing sewerage line and staff quarter area within NGM,NVM, Dabua Faridabad are to be cleaned daily dump the garbage, mud and dust daily
Operation and Maintenance of sewerage system including desilting, attending day to day complaints by Manpower and any type of machinery Like super sucker machine, jetting machine and Material in ward 29 Old Faridabad for one year in division 3rd
Annual maintenance of Water Supply Sewerage Scheme in M.T. Dabwali. Supply installation testing and commissioning One Set of submersible pumping set capable of delivery 950 LPM at 45 mtr. head on boosting station in residential area, M.T. Dabwali an
Providing outsourcing services regarding general mtc. and up keep of residential and non-residential building cleaning of roads path drain arboriculture arrangement water supply and sewerage system and watch and ward of 66 KV sub-station Sec-3 pkl
Annual maintenance of Water Supply and Sewerage scheme in MT Dabwali. Operating of machinery Pump set including operation of sluice valve and maintaining water supply system at Boosting Station, MT Dabwali complete in all respect and all other works
Annual maintenance of Water Supply and Sewerage scheme in MT Dabwali, Operating of machinery Pump set including operation of sluice valve and maintaining water supply system at Boosting station, MT Dabwali complete in all respect and all other works
Providing Sewerage Network and all Ancillary Works including Construction of Intermediate/Main Pumping Station and 8 MLD Sewage Treatment Plant (STP)on SBR Technology alongwith O and M for 5 years after 1 year successful completion of Defect Liabilit
Design, Construction, erection, testing and commissioning of main pumping station of 3 MLD with peak factor 3 consisting and sewerage Treatment Plant of 3.00 MLD based on SBR Technology disposal of sludge, construction of sump and Labour for Stringin
Providing effluent carrier from sewerage treatment plant of online water quality monitoring system parameter BOD, COD, TSS, PH for outlet with comprehensive maintenance contract for 5 years with all consumable spares at 3 MLD STP (MBBR) at Nangli Pa
A/mtc sewerage scheme Dharuhera Town. Providing and fixing of aluminium aurmed cables of 120 sq MMx 3.5 core and 185 sqr MM x 3.5 core at effluent pumping station at Dharuhera Town and all other works contingent thereto
Annual maintenance of sewerage system of Rewari Town, cleaning of silt from existing sludge drying bed no. 2 remaining part by manual labour with help of all necessary equipments like kassi, balti, tractor trolly etc. including carriage outside the
HEW 87 Providing and fixing Changeover 100A, 4-Pole, 415V, Repairing/ Services, Loading and unloading and shifting of 30 KVA silent canopy Genset from Sec-12 to Sewerage Disposal in Sec-2, Palwal and all other work contingent thereto.
Bhattu Kalan Detail Project Report for Construction of Sewerage Treatment Plant and Providing Sewerage System in Village Bhattu Kalan Tehsil and Distt Fatehabad
Construction of manhole and road gully and providing and laying of SW pipe line 200mm i/d in day to day mtc in Sector 27, Panchkula Extension (A/mtc of PH services in Sector 23 to 28, 31 and 32 and Sector 1 to 6, MDC Panchkula)
Construction of manhole and road gully and providing and laying of SW pipe line 200mm id in day to day mtc in Sector 28, Panchkula Extension complete in all respect as per satisfaction of Engineer-in-charge ( A/mtc of PH services in Sector 23 to 28
Construction of manhole and road gully and providing and laying of SW pipe line 200mm i/d in day to day mtc in Sector 28, Panchkula Extension (A/mtc of PH services in sector 23 to 28, 31 and 32 and Sector 1 to 6, MDC, Panchkula)
Construction of manhole and road gully and providing and laying of SW line 200mm i/d in day to day mtc in Sector 24, Panchkula Extension (A/mtc of PH services in Sector 23 to 28, 31 and 32 and Sector 1 to 6, MDC, Panchkula)
Construction of manhole and road gully and providing and laying of SW pipe line 200mm i/d in day to day mtc in Sector 23, Panchkula Extension (A/mtc of PH services in Sector 23 to 28, 31 and 32 and Sector 1 to 6, MDC, Panchkula)
Construction, repair of SWD manhole and repair of road gully at various points in dividing road in sector 30 Pinjore Kalka Urban Complex and all other works contingent thereto (A/Mtc . of PH Services in sector 1 to 6 MDC and Sector 23 to 28, Panchkul
Construction of manhole and road gully and providing and laying of SW pipe line 200mm i/d in day to day mtc in Sector 31, Panchkula Extension (A/mtc of PH services in Sector 23 to 28, 31 and 32 and Sector 1 to 6, MDC, Panchkula)
Construction of manhole and road gully and providing and laying of SW pipe line 200mm i/d in day to day mtc. in sector 28, Panchkula Extension (A/Mtc of PH services in Sector 1 to 6, MDC and sector 23 to 28 and 31, 32, Panchkula)
Construction of manhole and road gully and providing and laying of SW pipe line 200mm id in day to day mtc in Sector 28, Panchkula Extension complete in all respect as per satisfaction of Engineer-in-charge (A/mtc of PH services in Sector 23 to 28,3
P and F of manhole cover and frame as per requirment in ward no. 12 at various location i.e. Basai village, sec-9 B, sec-37 D Basia Enclave -I, Dhanwapur Village, Gadoli Kalan Village, Ram Vihar, Surat NagarPhase-II, tekchand nagra etc) area under t
Construction of manhole and providing and laying of SW pipe line 200mm id in day to day mtc in Sector 25, Panchkula Extension complete in all respect as per satisfaction of Engineer-in-charge (A/mtc of PH services in Sector 23 to 28, 31 and 32
Construction of manhole and road gully and providing and laying of NP3 pipe line 350mm id for day to day mtc. In sector 30 Pinjore (A/mtc of PH Services in sector 1 to 6 MDC and Sector 23 to 28, 31 and 32, Panchkula Extension)
Providing and laying of 200mm i/d SW pipe line from H.No.196 to 202, 2216 to 2222 Sector 28, 1171P to 1194P Sector 27 and SWD RCCNP-2 pipeline near H.No.1172 to 1193 Sector 27, Panchkula and construction of manhole complete in al respect