Loading…
Loading…
8,376 results • Best match
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Sabdulpur Piped W/S scheme at Kaliachak-III Block under MAAD.(3rd Call)
Tube well, Pump House ,150 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1018 nos) under JJM with allied work for Nonakourda- PWSS in Pata
Construction of 450 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and Providing FHTC for Hamidpur Piped W/S scheme at Kaliachak-II under MAAD. (3rd Call)
Soil Investigation work in connection of construction of RCC Over Head Reservoir (Capacity-400Cum) due to change of land with Laying of Balance Distribution Pipe Line for provided balance FHTC and other allied works of Narandiha Piped Water Supply
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Gayeshbari Piped W/S scheme at Kaliachak-I Block under MAAD. (2ND Call)
Construction of Pump House for installation of pump machineries and L.T.panel at tail regulator gate at TMLC of IandWD department for alternate arrangement of intake at fulbari along with soil investigation for the construction of pump house for inst
Construction of 300 cum cap. 20 Mtr. staging height RCC Over Head Reservoir including pipe contn. and cost of pipes, specials including soil investigation for DEBSALA and its adj.Mouzas W.S. scheme under Durgapur Sub-Divn.under Burdwan Divn._PHE Dte.
Pump House ,200 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (1373 nos) under JJM with allied work of DAKSHIN PATHAR BERYA AND ITS ADJOIN
Bilaspur (Zone-I) Water Supply scheme with LDS, Rising main, FHTC work, Pump House, 450 cum capacity OHR with 20 mtr. staging height including soil investigation at Jangipara Block in Serampore Sub-Division, DiSt- Hooghly under Hooghly Divn.PHE DTE.
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 99 Nos) under JJM with allied work for KANPUR (Zone-III) PWSS within Ramnagar-II Block under Digha Sub-Division
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Mosimpur Piped W/S scheme at Kaliachak-I Block under MAAD. (3rd Call)
Pump House ,250 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (475 nos) under JJM with allied work of KAYEMGIRI PWSS within Bhagwanpur-II B
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 267 Nos) under JJM with allied work for SANKARPUR (Zone-III) PWSS within Ramnagar-I Block under Digha Sub-Divisi
Sinking Of Tube Well ,Laying distribution pipe line, Pump House , Boundary Wall soil investigation , 600 cum OHR (Intze type with pile foundation) and Accommodate FHTC under JJM with allied work for Sabra and its adjoining mouzas W/S scheme
Detailed topographical and hydrographical survey including Soil investigation on Lower Bagjola Khal and BB-1 khal for a approx length of 31.73 KM consisting of survey and preparation of maps, plan, cross section and long section within Block- Rajarha
Pump House ,200 cum OHR (Intze type with pile foundation), Rising main, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (845 nos) under JJM with allied work of KAPASDA PWSS within Contai-I Block under Contai Sub-
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 355 Nos) under JJM with allied work for SANKARPUR (Zone-I) PWSS within Ramnagar-I Block under Digha Sub-Division
Construction 350 cum capacity of RCC OHWR and Soil Investigation and laying of Rising Main, Distribution Main with FHTC from existing and new proposed distribution system at Purana Bongaon WS Scheme under Bongaon Sub-Divi,PHE Dte.(New Scheme)
Pump House ,300 cum OHR (Intze type with pile foundation), Rising main, Head work site, Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC (500 nos) under JJM with allied work for URURI- PWSS in Bhagwanpur-II Block
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 50 Cum OHR Accommodate FHTC ( 158 Nos) under JJM with allied work for Jhaugerya Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I Block un
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 250 Cum OHR Accommodate FHTC ( 294 Nos) under JJM with allied work for SANKARPUR (Zone-IV) PWSS within Ramnagar-I Block under Digha Sub-Division
KUSHA PWSS with sinking of Tubewell LDS Rising Main FHTC Cons of 150 cum capacity RCC OHR with 20.0 mtr. with Sta soil investigation cons switchrooms boundary walls at different TW site under BardhamanII Block Dist PurbaBardhaman NEW SCHEME
Construction of 500 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design Drawing including pipe connection, Soil Investigation and FHTC for Mobarakpur Piped W/S scheme at Kaliachak-II Block under MAAD.(3rd Call)
Pump House,350 cum OHR (Intze type with pile foundation), Laying distribution pipe line, Boundary Wall, Soil investigation Accommodate FHTC under JJM with allied work for TIKASHI- PWSS in Khejuri-I Block within Contai Sub-Division under Tamluk Di
Constn. of 400 cum capacity 20 Mtr. staging height RCC O.H. Reservoir including pipe connection and cost of pipes,specials including soil investigation for AMRARGARH and its adj.mouzas W.S. scheme under Durgapur Sub-Divn. under Burdwan Divn, PHE Dte
Const. of 700 Cum capacity 20 Mtr. staging height RCC Over Head Reservoir as per Departmental Design and Drawing including pipe connection, Soil Investigation and Providing FHTC for Deonapur Piped W/S scheme at Kaliachak-III Block under MAAD.
Const of 5.90 m X 4.10 m Pump room with sanitary arrangts, 250 and 350CuM OHR (ZONE-Iand II) Soil Investigation, Land development, Laying distribution, road restoration and Providing FHTC at MASHRA WS scheme under BIRBHUM Division, PHE Dte
Construction 200 cum capacity of RCC OHWR and Soil Investigation and laying of Rising Main, Distribution Main with FHTC from existing and new proposed distribution system at Paschim Huda WS Scheme under Bongaon Sub-Divi,PHE Dte.(New Scheme)
C/o Deep Ocean mission-Vertical Microbial Repositary and laboratory facilities for NIOT at Chittedu,Tirupati.AP. Subwork/Packages: Conducting soil investigation and Bearing capacity by drilling of bore holes and laboratory analysis for recommodations about appropriate types of foundations.
Estimate for Soil investigation Gobindapur by pass to Mukundapur road via baganchara bhaluka from Ch 5.5km to Ch 19.95 Km under Ranaghat Highway Sub Division of Nadia Highway Division no II PW Roads Directorate in the district of Nadia
Sinking of Tubewell, Laying of Rising Main, Providing FHTC, Construction of 600 Cum capacity OHR with 20m Staging Height including with Soil Investigation, Repairing of Pump House and Blower Room etc. for Augmentation of K.D. Trimohini Zone-II PWSS.
Soil Test of Construction of G plus 2 building for pay and use toilet stall, rest room, ticket counter etc. at Township Central Bus Stand under ward no -29 within Haldia Municipality.
Construction of 750 cum capacity 20 mtr staging height RCC Over Head Reservior with Pile foundation including Soil test , pipe connection and cost of pipes, specials for NANDAI and its adjoining mouzas
Laying distribution pipe line, soil test and construction of R.C.C. Over Head Reservoir of capacity 550 Cum and staging height 20.00 mtr ... within Midnapore Sadar Sub-division under Midnapore Division, PHE Dte.
Please refer to BOQ
Investigation work
Please refer to BOQ
PLEASE REFER TO BOQ
see NIQ
Soil investigation, Construction of 50 cum OHR (tourch type with pile foundation) under JJM with allied work for Bhatsalia PWSS within Egra-I Block including Supply of all labour materials under Digha Sub-Division of Tamluk Division, PHE Dte. (PART
Soil investigation site, Construction of 100 Cum OHR at HW Construction of P/H 2nd and 3rd site, laying of rising main distribution line and providing FHTC as per departmentalDesignDrawing for DALMONI TG Zi ZI ZII underBirpara S-D Alipurduar Division
Details of Soil Investigation work for the proposed minor bridges at Ch. 1.85 km, 5.95 km and 8.10 km on Memari Jougram Road (0.00 kmp to 10.33 kmp) under Burdwan South Highway Division in the district of Purba Bardhaman. (Non-Plan)
Construction of High lift Pump House, 450 cum OHR along with soil investigation work, boundary wall and laying of rising main under Augmentation of BARJORA Water Supply Scheme (Left out mouzas of Barjora Block under B.R.G.F Phase -I) (Zone-III)
LOAPUR PWS Scheme with sinking of Tube-well,LDS, Rising Main,FHTC, Constn. of 600 cum capacity RCC OHR with 20.0 mtr. Staging ht. including soil investigation ......... at different TW site under Galsi-I Block, District- Purba-Bardhaman. NEW SCHEME.
Aug of DHATRIGRAM PWSS with LDS, FHTC, Rising main, Cons. of 500 cum capacity OHR with 20.0 mtr. Staging height with soil investigation including switch-room , boundary wall and repairing of OHR, switch room and boundary wall under Kalna I Block.
Laying of Distribution System, Rising Main System, Providing FHTC, Soil Investigation, Construction of 550 cum capacity RCC OHR, Pump House Boundary Wall, Service Road, Improvement Of Land for of Z-VII AMULIA in under N 24 Pgs WS Div-I,PHEDte
Sinking of Tube Well, Laying distribution pipe line, Pump House, Boundary Wall soil investigation, 50 Cum OHR and Accommodate FHTC ( 270 Nos) under JJM with allied work for Daha daya and Its Adjoining Mouzas Water Supply Scheme within Ramnagar-I
Soil Investigation,Construction of Over Head Reservoir of capacity 350 Cum(Zone-I) AND 300 Cum(Zone-II) related to water supply scheme at SAHAPUR and its adjoining mouzas...including supply of all labour, materials ...under BIRBHUM Division, PHE Dte