Loading…
Loading…
1,061 results • Best match
MOEI & Fans, W/s pump set, street light / compound lighting at GSI Office, daganiya raipur. Subwork/Packages: Providing Maintenance Staff.
lighting pole or post and hardware- tubular street light poles, power cord-Flexible electric cable Heating cables or Wire cotton Power for Heater, insulated electrical conduits Pipe, miniature circuit breakers
DESIGN, MANUFACTURING, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 04 NOS HIGH MAST WITH LED FLOOD LIGHT SYSTEM ALONG WITH 2 YEARS AMC FORNTPC GADARWARA STADIUM
MW C to illumination of monument and installation of high mast for National flag at Narayan Temple, Narayanpal, Distt. Bastar CG in time bound period
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING/EARTHING FOUNDATION ANDANY CIVIL WORK FOR 30M HIGH MAST ALONG WITH 16 NOS. 350W LED FLOOD LIGHTFOR ASH DYKE AREA
MW C to Illumination of Monument and Installation of high mast for National Flag at Laxman Temple, Sirpur, Distt. Mahasamund, CG in time bound period
MW C to Illumination of Monument and Installation of high mast for National flag at Ratanpur Fort, Ratanpur, Dist. Bilaspur, CG in time bound period
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
SUN ENERGY INDIA ENTERPRISES LED Luminaire For Road And Street, SUN ENERGY INDIA ENTERPRISES LED Luminaire For Road And Street Lighting Rating - 90 Watt
SUN ENERGY INDIA ENTERPRISES LED Luminaire For Road And Street, SUN ENERGY INDIA ENTERPRISES LED Luminaire For Road And Street Lighting Rating - 150 Watt
LED Panel Light 6W, LED Panel Light 12W, LED Street Light 36W, LED Panel Light 18W, +4 more
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover
LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5/Section 3) (Q3) MSE Exemption for Years of Experience and Turnover
Facility Management Services - LumpSum Based - Industrial; Fixing and removing of high mast flag from LMVs; Consumables to be provided by service provider (inclusive in contract cost)
Dismantling, shifting and erection 04 Nos of high mast lighting tower 20/30 mtrs height in different location as per requirement of mines under Kusmunda OCP
AS PER BID DOC
Custom Bid for Services - Repairing of LED street light for Rajgamar, DSB, SRK, MKP and SRPL Sub Area for lighting illumination improvement in Mines and Colony Similar Category Repair and Overhauling Service
Providing and fixing of Solar LED based street light set at different locations of AHQ Establishment of Raigarh Area .
REPAIR AND MAINTENANCE OF STREET LIGHT, CABLE, MCCB, PANELS AT NAYA RAIPUR MIL STN UNDER AGE (I) NAYA RAIPUR
REPAIR AND MAINTENANCE OF STREET LIGHT, CABLE, MCCB, PANELS AT KOTA RAIPUR MIL STN UNDER AGE (I) NAYA RAIPUR
MW C to installation of high mast for National Flat at arge Vishnu temple, Janjgir and Narain temple, Narainpal, CG in time bound period. For details please refer tender document.
COMPREHENSIVE REPAIR AND MAINTENANCE OF SECURITY LIGHTS STREET LIGHTS ETC AT SATWARI RIDGE AREA RAULKI AREA MH RAIPUR SATWARI UNDER AGE EM AT MIL STN JAMMU
Custom Bid for Services - FABRICATION OF PLATFORM FOR 21 AND 30 METRE HIGH MAST TOWERS INCLUDING OVERHAULING AND MAINTENANCE WORKS AT LOADING PLANT OF NMDC BACHELI COMPLEX
Dismantling, Shifting of 25 mtr High Mast Lighting system 03 nos. of Robertson Railway Siding and Re-erection job of the same at Chhal OCM , Raigarh Area .
Dismantling, shifting and re-installation of one number High Mast Tower (20mtr height) from KCC Chowk (Chandni Chowk) to new location at quarry of Dipka Expansion Project.
KONARK--KONARK ENTERPRISE 12 Watt WHITE-LED BASED SOLAR, KONARK--KONARK ENTERPRISE 12 Watt WHITE-LED BASED SOLAR STREET LIGHTING SYSTEM With 30 Ah Battery Capacity
Power LED RGB Flood Light With, LED Flood Light 100W, LED Spot Light 6W, LED Street Light 45W, +9 more
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Exemption for Years of Experience and Turnover
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), PVC Insulated Unsheathed Cable with Flexible Conductor ISI Marked To IS 694 (Q2) (3 (3 ))
Providing and Fixing of LED rope light (tricolor) in street light poles at NSN, VVC and IVC Colony, SECL, HQ, Bilaspur.
Painting Works of Transformers, Panels, Bus Ducts, Motors, Electrical Structures,Street Light Poles and Other Associated Electrical Equipments at NTPC Simhadri
Astronomical Timer for Street Light Control (Timer Controls) as per IS 9000 (Q3) MSE Exemption for Years of Experience and Turnover
Custom Bid for Services - Supply and Installation of 20 M Stadium High Mast 4 Nos at Cricket Ground Rajhara Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Operation and Maintenance of Transformer, Panels, DG Set Substation, STP, WTP, AHUs SCADA and Internal and External Street Lighting and Electrical Installations at Indian Institute of Management Raipur
Part A MOEI and Fans i/c RMO of Pump sets, street light compound light Income tax office Bldg. and Resdl. Qtres Civil Lines at Raipur. 2. MOEI and Fans i/c RMO OF Pumps sets street lights in compound light I/T Office Bldg. and Resdl. Qtrs at Bhilai ... sets street light in ... sets street light 66 ...
COMPREHENSIVE REPAIR AND MAINTENANCE OF SECURITY LIGHTS GARDEN LIGHTS STREET LIGHTS ETC AT SATWARI RIDGE AREA RAULKI AREA MH RAIPUR SATWARI ETC OF AGE E/M UNDER GE SATWARI
Dismantling of one number High Mast Tower (20 mtr height) from KCC dumping yard and re-erection at coal stock no. 16 at quarry of Dipka Expansion Project.
Dismantling of three (03) numbers high mast tower (20 mtr height) from 15 no. stock and re-installation at safe distance from HEMM movement at quarry of Dipka Expansion Project.
Erection of overhead line LT and HT along with connection of 200W street light for starting of Jainagar Siding of Bishrampur Area
Supply, Installation, testing and commissioning of LED street light, OHTL overhauling, Cabling and Wiring -electrical works at Korba Exploration camp, Korba (C.G.)
Installation of Solar Street Light at Khorkhori Para (Salhi) and Sapkara Chowk at Surajpur District Under CSR activities of SECL Bishrampur Area.
2200001799, HIGH MAST LIGHTING TOWER, INSTALLATION AND COMMISSIONING OF HIGH MAST LIGHTING TOWER
Work of Power Supply arrangement to High Mast Lighting Towers of 20 meter height - 09 nos, 30 meter height - 04 nos. proposed to install at various places in T.A.,Gevra Area.
Supply, Installation, testing and commissioning of LED street light, OHTL overhauling, Cabling, Wiring and other electrical works at Kudumkela Exploration camp, Raigarh (C.G.).
Operation and Comprehensive Annual Maintenance Contract of Street Light and High Mast Lighting System along with Associated Electrical System Installed in Nava Raipur Atal Nagar, Distt. - Raipur (C.G.)”(1st Call)
1.MOEI and Fans i/c RMO of Pump sets, street light, compound light income tax office building and resdl. qtrs at Raipur. 2. MOEI and Fans i/c RMO of Pump sets, street light in Income tax office building at Rajnandgaon. SH:- Comprehensive Maintenance of Johnson lift & Escalators Make lift (2nd Call)
Custom Bid for Services - Supply Erection Commissioning of 30meter long High Mast Lighting Poles including all accessories at Talaipalli Coal Mining Project Raigarh CG Similar Category Piping Erection Service Electric Cabling Service
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING/ EARTHING/ FOUNDATION ANDANY CIVIL WORK FOR HIGH MAST LED LIGHTING TOWER OF HEIGHT 30M ALONG WITH16 NOS. 350W LED FLOOD LIGHT AT NTPC SIPAT FOR STAGE-III
PROVN OF 20 LED BASED SOLAR STREET LIGHT OF 20 WATT AT CQA(I) ESTATE LADPUR, RAIPUR, DEHRADUN UNDER GE(I) (P) (FY) KANPUR.
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7133568 Dated : 21-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 50 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 9000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/6 Beneficiary : Commandant bijapur cg, Home Department Chhattisgarh, Chhattisgarh Police, (The Commandant 15th Bn Caf Bijapur C.g.)