Loading…
Loading…
76,222 results • Best match
REPLACEMENT OF CLAMP, NUT, BOLT OF IPS TUBE AND MAINTENANCE OF 33 KV AB SWITCH OF KC - 2 PIT SUB-STATION UNDER KATRAS AREA
MAINTENANCE OF 440 VOLT OVER HEAD LINE AND TREE TREEMING CUTTING AT REGIONAL HOSPITAL TILATAND AND COLONY AT R.H. SUB STATION UNDER KATRAS AREA
SUPPLY AND MAKING OUTDOOR CABLE END JOINTING AND STRAIGHT THROUGH CABLE JOINTING OF AT 33 KV KC-2 PIT SUB-STATION UNDER KATRAS AREA
Augmentation of capacity of PTR from (3X10) MVA to (4X10)MVA with allied works at Bagjola 33/11KV Sub- Station under Bidhannagar II Division
Construction of Boundary wall and other allied civil works at Belgharia 33/11kV sub-station under Barrackpore Division in 24 Pgs(N) Region, WBSEDCL
Augmentation of capacity of PTR from (2X10) MVA to (3X10) MVA with allied works at Dangapara 33/11 1KV Sub-Station under Barrackpore Division
COMPLETE REWINDING/OVERHAULING OF 3 PHASE 440 VOLTS TRANSFORMER COOLING FAN AT 33 KV/6.6 KV KC-2 PIT SUB-STATION UNDER KATRAS AREA
REPAIRING OF DC CHARGER SET AND CHANGING OF GI NUT BOLTS OF BATTERY WITH FLUTE AT KC 2 PIT SUB STATION UNDER KATRAS AREA
REPAIRING OF DISTANCE PROTECTION RELAY MAIN-I OF 132 KV HATA-FCI2 CKT-II AT 132KV SUB-STATION FCI-II under ETD-I Gorakhpur
MAINTENANCE OF OLD OVER HEAD STAY WIRE AND NEW ERECTION COMPLETE STAY SET FROM KC-2 PIT SUB STATION 33 KV UNDER KATRAS AREA
Construction of 01 No. 132 KV line bay at 132 KV sub station Bhanderi to accommodate 132 KV S.C line from 132 KV Sub station Bhanderi to 132 KV Sub station Gohana
Work of re-arrangement of existing 33KV Overhead feeder no. F-1 and F-16 of 132/33KV Sub Station Sub Station feeding power to 33/3.3KV GPT Sub Station, Gevra Area.
Loading, carriage and unloading of various material for construction of 33 KV Solar Bays from 220 KV Sub-Station, Sultanpur to 132 KV Sub-Station, Payagpur and 132 KV Sub-Station, Begampur
Repair of Dhori East Sub Station and Distempering colour washing washing painting some repairing work at new Sub Station old Sub station Karkhana pump house under Dhori East AADOCM of Dhori Area.
Drawing 11kV OHL from KDH Sub-station to Karkatta Sub-station and dismantling of 3.3kV idle OHL from Bloack A Pump to AB Colony Dhamdhamia Sub-station under Purnadih OCP, NK Area.
Providing 33KV Feeder line from 400 132 33KV Sub-Station Sector 123 to 33_11KV Sub-Station Sector 122 JJ _Jhuggi and Jhopri and 33-11KV Sub Station Sector 122 B Block Noida
Repairing of overhead lines of 11KV feeder No 3, 6.6KV Dragline Feeder, S-1 Feeder, starting pole of M-1, M-2 and feeder No 16, and cable work at incomer of various panels, along with 33KV switchyard maintenance at Madhuban DG Sub-station under BII
CONSTRUCTION OF 01 No. 33 KV W.T.P BAY AT 132KV SUB STATION SARNATH
Providing Roof Truss and Renovation of Quarter E2 at 66kV Sub Station Koothattukulam
Construction of Extension in control room building at 132 KV sub-station Giddarbaha
Maintenance of 33 kV OH line F1 and F2 from 132 kV substation Nandira to 33 kV Main sub- station and Shantinagar Sub-station LOCP of Lingaraj Area for a period of one year
Fabrication galvanizing testing supply delivery including fasteners at site for the work of 132 KV structure for Ashokenagar 132 KV Sub station under Barasat Area Office WBSETCL
Fabrication galvanizing testing supply delivery including fasteners at site for the work of 132 KV structure for Basirhat 132 KV Sub station under Barasat Area Office WBSETCL
ATTENDING BREAKDOWN BY INTERNAL INSPECTION AND REPLACEMENT OF REQUIRED GASKET AND ALL TESTING OF 160 MVA TRANSFORMER AT 220 KV SUB-STATION BARAHUWA UNDER ETD-II GORAKHPUR
PREVENTIVE/PREDICATI VE OF 33KV TIE-LINE FEEDER INCLUDING DISMANTLING AND RE FITTING OF 33KV GRADE C.T AT OUTDOOR YARD SUB-STATION R/K UNDER KATRAS AREA
Shifting of Andrew Yule Make Power Transformer, 6.6KV/11KV, 5/7.5 MVA, SI. No 12379, including miscellaneous work at Madhuban D.G. Sub-station of Block-II Area
COMPLETE REPAIRING AND OVERHAULING OF 11KV, 630A, VCB A/Y MAKE SL NO 0268 OF GT/4 FEEDER AT 33 KV SUB STATION BHALGORA AT SITE JOB.
Renovation work including painting of Control room building office building, gate installation and other allied civil works at Subhasgram 220 KV Sub- Station, Under ACE KTZ WBSETCL
Reconstruction of Cable Trench and surface drain and other allied works in the premises of Sonapur 33/11 KV Sub-Station under Islampur Division , Dist.- Uttar Dinajpur
Construction of retaining-cum-boundary wall, main gate and other allied works at proposed 33/11 KV Sub Station at Chaulhati, under Jalpaiguri Division, Dist.-Jalpaiguri
Repairing / reconditioning, erection, testing and commissioning of failed 10 MVA Power Transformer-I at 110/11KV Palloor Sub-station, Electricity Department, Mahe
Electrical installation and concealed wiring work of newly constructed Control Room Building at Jhalda 33/11 KV Sub Station under Purulia Division
CONSTRUCTION OF RETAINING WALL OF NALA VEDVATI COLONY NEAR M.P.B SUB STATION B.D.A ROAD WARD 60 ZONE NO 14
Painting of different type of structure of 132 and 33 KV Switchyard and various equipments towards 33KVSide of KLC Bantala 220 KV Sub- Station and 220/132/33/11 KV Subhasgram Sub-station under kasba area office WBSETCL
Renovation of Switchyard including all equipment foundation and Construction of the same into spread out type 33/11 KV Sub-Station with augmentation of PTR Plinth at C K Road 33/11 KV Sub - Station, Dist.-Paschim Medinipur
Creation of 63 KVA sub-station along with HT/LT network at Ganie Mohalla Dharnambal Under CDF
Roof repair, Replacement of broken cover slabs, washing out of gravels at switchyard and other titbit civil works at Joyrambati 33 by11 KV Sub Station under Bishnupur (D) Division
Augmentation of 100 kVA to 200 kVA Sub-Station at Khan Mohalla Ganiepora Under UT Capex 2025-26
Construction of Toilet at 33 11 kv Sub Station Bareth Road Basoda under O and M Circle Vidisha
Augmentation of 100 kVA to 200 kVA Sub-Station at Wani Mohalla Yakhmanpora Under UT Capex 2025-26
Installation of 200KVA Sub-station for M/S Hill View service station Pattan for fast DCEV charging station
Creation of 100 kva sub station at Green Avenue Cololny Watlab (DDC Zaingeer) Under DDC Grants 2026-27
work related to construction and electrification of line and shifting of lines and poles in the areas related to 33/11kv sub station danpur under the head om (u.s. nagar )
Painting of the poles with allied structure of the switchyard and its surroundings of Adra 33/11 KV Sub-Station under Raghunathpur Division
Maintenance and reconditioning works at Central sub-station Basantpur by installation of 33KV PT with GOAB, DO Fuse, Dismantling and re-Installation of 33KV SF6 breaker for segregation of incoming and outgoing power supply feeder No2 supplying power
Work related to 33 KV overhead line from nandira Sub-Station to 33 kv sub-Station of Hingula OCP 33 kv/6.6kv substation maintenance, necessary power supply line shifting, maintenance inside substation premises and man power supply for a period of 365
Manpower Outsourcing Services - Fixed Remuneration - Others; Sub Station Attendant; 2 Years ITI Diploma in Electrical Trade for Sub Station Attendant
Construction of 66 KV line bays for 66KV Sub Station Allwalpur at 220 KV Sub Station Meerpur Kurali (R-5)
MAKING OF A NEW TEMPORARY PARKING SHED AT SUB STATION AND EXTENSION OF FRONT SIDE OF SUB STATION, KOCP, KA
Repair and Maintenance of 11 KV OH line for CCD sub-station to shimla colony Sub-station in Dhori Area