Loading…
Loading…
20,199 results • Best match
TIMBER SCANTLING
TIMBER SCANTLING
CONIFEROUS TIMBER
CONIFEROUS TIMBER
2 EXTRACTION OF LONG BAMBOO IN SBC II CHINTUR DURING 2023 to 24 AND TRANSPORTATION OF LONG BAMBOO FROM SBC II CHINTUR TO GOVERNMENT TIMBER DEPOT CHINTUR DURING 2023 to 24 DSO No 121 AND 122 2023-24
1 EXTRACTION OF LONG BAMBOO IN NBC II CHINTUR DURING 2023 to 24 AND TRANSPORTATION OF LONG BAMBOO FROM NBC II CHINTUR TO GOVERNMENT TIMBER DEPOT CHINTUR DURING 2023 to 24 DSO No 119 and 1202023 to 24
1 EXTRACTION OF LONG BAMBOO IN NBC II CHINTUR DURING 2023 24 AND TRANSPORTATION OF LONG BAMBOO FROM NBC II CHINTUR TO GOVERNMENT TIMBER DEPOT CHINTUR DURING 2023 to 24 DSO No 119 AND 120 2023 TO 24
1 EXTRACTION OF LONG BAMBOO IN NBC II CHINTUR DURING 2023 24 AND TRANSPORTATION OF LONG BAMBOO FROM NBC II CHINTUR TO GOVERNMENT TIMBER DEPOT CHINTUR DURING 2023 to 24 DSO No 119 AND 120 2023 to 24
Extraction of Firewood form BL trees in Co 102D and 103D
Sales of Tendu leaves at Khairgaon kasar
Sales of tendu leaves at Sakhi (Khu)
Sales of Tendu leaves at Kopari kapas
Sales of Tendu leaves at Kawtha khu
Custom Bid for Services - Tendu Pata Barcodar
Teak Plywood 8x4, Teak plywood fancy 8x4, Diamond mirror cutter blade
SUPPLY OF FIREWOOD (Baghati) dully Chopped Bukhari sizeSUPPLY OF FIREWOOD (Baghati) dully Chopped Bukhari size
Estimate for the cost of working down timber, poles and fire wood by way of final felling from Athikkal Bit III area over an area of 3.9 Ha in Akampadam Forest Station under Edavanna Range during 2021-22
working down hard wood Timber Teak and teak poles by way of final felling from 20.053 ha of 1962 TP Mundakkadavu in Karulai Range and transporting timber to Govt Timber Depots and poles billets firewood to Kanjirakkadavu Dumping Depot
Dragging and Stacking of timber at Nedumkayam timber depot under Timber Sales Division palakkad during 2023-24
MAINTENANCE OF OoTTUPURA AND BAMBOO GROVE IN THEKKADY RANGE
Sawing of Wooden Logs at CSIR CIMFR Head Quarter Dhanbad
RPGS Lifting Hook for small size logs Card board Packet
Requirement of Logs Collector & Reporting Solution for Sophos UTM (Q3)
Pani nikaasi to interlock block Nirman karya Gaurav path se mahaveer Singh v pus Singh ke ghar ki or Bamboo
Interlock block sadak Nirman karya mahaveer Singh ke Ghar se Sumer Singh v malaram mahla ke ghar ki or bamboo
Felling of Acacia/Eucalyptus trees and preparation of timber and firewood, loading, transporting to Tenkey depot, unloading and stacking, from the areas as detailed in the schedule Annexed during 2025-26 season
Dragging and stacking of Timber at Aruvacode Central Timber Depot under Timber sales Division Palakkad 2023-24
Supply of Dry Firewood
In monsoon season removing timber logs is very essential, hence beldar is included in the estimate. The inspection of vigilance work of the TASKFORCE team to investigate the presence of any such attempt has been conducting several years back.
Supply of firewood (Baghati dully chopped (Bukhari size)Supply of firewood (Baghati dully chopped (Bukhari size)
Plantation of Bamboos at various plots in R South ward in Z VII
Plantation of Bamboos at various plots in R North ward in Z VII
Plantation of Bamboos at various plots in R Central ward in Z VII
Work of Plantation of bamboos at 1-L bandh near village Bada Phool
MEDIUM TEAK WOOD
Teak wood format
TEAK WOODEN STOOL
INDIAN TEAK WOOD
Scantling teak wood
Scantling teak wood
Scantling teak wood
sms teak table
MEDIUM TEAK WOOD
Scantling teak wood