Loading…
Loading…
3,572 results • Best match
CONSTRUCTION OF BALLA/ BAMBOO PAILNG NEAR THE PARK AT 3 NO. GOVT. COLONY PRIMARY SCHOOL.
CONSTRUCTION OF BALLA/ BAMBOO PAILNG AT POND INFRONT OF TAPAS SAPUI HOUSE AT SAPUI PARA.
Restoration (By Bullah/Bamboo) pilling jungle cutting garbage removal and road restoration at kaipukur bank.
Construction of road with Bamboo/Balla Pilling Side of Moka Vai pond to Atiar Rahaman.
REFLECTIVE MIRROR, FMN STICKER, FMN LOGO SMALL, CALLING BELL HAVELS, AGRO NET, PVC PIPE, BAMBOO
CONSTRUCTION OF BAMBOO PILLING NEAR KALMATI BAROMASJID KABRESTHAN. NEAR ABU TALEB POND, NEAR ABDUL ALIM SK POND, BAMBOO PILLING NEAR ABDUL MANNAR POND, NEAR NAZIMUDDIN POND AT BOOTH NO.105, NARESH BARMAN POND. AT BOOTH NO 106,
FIRE BALL, FIRE BUCKET ALL TYP, FIRE HOOKS WITH BAMBOO 8 TO 10 FIT LONG, FIRE BETTERS WITH BAMBOO 8 TO 10 FIT LONG, FIRE BUCKET SATND 4 PIC BUKET HANG, PIK AXE, FIRE SHOVEL, FIRE GLOVES
(i) BAMBOO PILING FROM HOUSE OF FURLAI MARDI TO HOUSE OF KAMALESH KISKU AT JAMAR, (141/8),MokrampurPrathamikVidyalaya, Ellahabad Gram Panchayat. (ii) BAMBOO PILING INFRONT OF EIDGAHA AT SIBIR, (144/6), Sihol High School. Ellahabad Gram Panchayat
Reconstruction of cement concrete and bamboo pilling in different places of South Jagtala at ward no. 29 under Maheshtala Municiplity and Reconstruction of cement concrete and bamboo pilling in different places of Chak Krishnanagar at ward no. 29
Construction of 01(one) no. 60 ft. Bamboo Tower and 02(two) nos. 45 ft. Bamboo Tower for installation of VHF Antenna and CCTV Data Operating System respectively at Lot-8 Point in connection with Gangasagar Mela 2024
Construction of Bamboo fencing of Plot No AC 44 at AA IA in New Town, Kolkata
Construction of Road Protection Wall (Bamboo Piling) at Ghosal Para (Phase II) in Ward no 1
Construction of cover drain from the house of Mosarof towards the bamboo garden at village Mamudpur
Protection of road with Bamboo Pilling from Tajammel house towards Hasimuddin house at Jotvikon-I Sansad.
Construction of Guard wall with Bamboo with Ghat Baro Pukur at Pauli village under Moregram GP
Construction of CC Road from Bharat Gayen s Bamboo Guarden to Cremation Ground Smashan at Dupjora
Upgradation by CC road with Bamboo Pailing from the paribartan Club to the culvert at Raipur
DEVELOPMENT OF ROAD SIDE GARDEN BY PLANTATION WITH BAMBOO FENCING IN WARD NO.95, BOROUGH - X
Construction of Bamboo/Bullah Pilling at Khadimul Gazi Pond at Mouza- Ghanesyempur JL- 12, S-I
Temporary Bamboo inside the Mela Ground at Central Park of 47th International Kolkata Book Fair 2024
MAKING OF BAMBOO FENCING FROM BOX CULVERT TO BHABHA INSTITUTE IN AAIII IN NEW TOWN KOLKATA
Protection of road with Bamboo Pilling from Sadal Ghosh house towards Alauddin house at Doulatpur Sansad
Plastic Tarpaulin 15 by 18 Feet, Plastic Tarpaulin 18 by 24 Feet, Plastic Rope, Bamboo, Nails
Repairing of road at all sansad (By Brick-bats, Rubbish and Bamboo Pilling) under Kalmegha GP.
Repairing and painting of bamboo walling fencing in broad way under Bidhannagar Municipal Corporation. (Phase-I)
L051 Banna to Radhanagar part of serampore Bamboo pole to Smandepur vide package no WB 08ADB58A
SUPPLY OF EARTHEN POT, BAMBOO STRUCTURE, GITA ETC FOR NABADWIP MUNICIPALITY BURNING GHAT FOR 12 MONTHS.
Construction of temporary Bamboo Structure with Hogla Walling at 100 Bedded Cottage for Gangasagar Mela 2024
Construction and Repairing Roads Drains and Bamboo Pile at Ward No 15 Under Jiaganj Azimganj Municipality
Upgradation of Road from Asgar Sks house to Resham Sks house with bamboo pilling at jolpara.
MAKING OF BAMBOO FENCING OF PLOT NO-98/1-IIB IN AA-IIB, NEW TOWN KOLKATA.
PAILLING WORK BY BAMBOO FROM MALANCHA BRIDGE (CHAITAL END) TO RAFIQUL MOLLA HOUSE AT CHAITAL GP
Bamboo piling work form houe of Sajal Pal towards Biswantah Mahanta at East Kismatdapat Sansad-89092780
Construction of Protection wall with bolla AND bamboo pilling at Irkona Hazra Pukur with Eucalyptus Bullah.
Bamboo piling work form houe of Sajal Pal towards Biswantah Mahanta at East Kismatdapat Sansad-89092780
PROTECTION WALL WITH BAMBOO SAL BOLLI NEAR BABURIGRAM SAL GORA PUKUR AT BABURIGRAM UNDER BANNYESWAR GP
Construction of Cement Concrete Road with Bamboo Pilling from Satlaxmi ICDS to Eid Gaha at Satlaxmi
Piling Work by Bamboo/Shal Bolla from Abujar Sardars house to PWD road, under Minakhan GP.
Protection of road with Bamboo Pilling from Swadhin Saha house towards Halim house at Doulatpur Sansad.
CONSTRUCTION OF BAMBOO PILING FROM ALAUDDINS HOUSE TOWARDS AMJADES PLACE SAJITALA AT CHANDAHATI OF DURGAPUR SANSAD
Gurd wall with Bamboo and Fencing infront of Sankair High School pond at BadsankaiMouza at Sathiharsansad
Engagement of labours for cleaning water hyacinth,all other floating as well as submerged garbages that flows down-stream..from barrier made of bullas,bamboos before M.S gratings at Bagjola Pumping Station, PS. Haroa,Dist. 24 Pgs(N) during 2021-22
Engagement of labours for cleaning of water hyacinth,all other floating as well as submerged garbages that flows....Bagjola Khal from barrier made of bullas,bamboos before M.S gratings,Bagjola Pumping Station,P.S.Haroa,Dist. 24 Pgs(N) during 2020-21
CONCRETE ROAD
DRAIN
CONSTRUCTION OF RBM ROAD FROM MAIN ROAD TO THE HOUSE OF BINAY BARMAN VIA MASAN MONDIR AT KHAIRATIBARI Code APAS/01/003/144/0001, APAS/01/003/144/0015, APAS/01/003/144/0016
i)BAMBOO PILLING SIDE OF BADHIYA PUKUR, TALA KADMA PACHIMPARA AT HAZRATPUR G.P ABOUT 100 MTS. SL-1 ii)BAMBOO PILLING SIDE OF THAKURAN PUKUR, TALA KADMA AT HAZRATPUR G.P ABOUT 30 MTS. SL-2 SL-29 iii)BAMBO
Providing of Manpower for cleaning the screen / grating and disposal the floating debris such as water hyacinth, municipal garbage, wooden logs, plastic, tyre etc. of Vertical Turbine drainage pumps at Keorapukur Pumping Station under M.D.M.D. fo
Urgent work for pruning-cutting of branches of standing trees including fallen branches cutting of dead trees,branches and vulnerable branches and making logs as demarcated in between Km. 7.00 to Km. 20.00 of NH-112
Urgent work for pruning-cutting of branches of standing trees including fallen branches cutting of dead trees,branches and vulnerable branches and making logs as demarcated in between Km. 40.00 to Km. 53.00 of NH-112