Loading…
Loading…
4,285 results • Best match
Providing manpower for operation and maintenance of Switchyard equipments and filtration and topping of transformer oil of Ambhora Lift Irrigation Scheme stage II Tal- Kuhi , Dist- Nagpur for Two calendar year.
Providing manpower for operation and maintenanace of 2.0 MVA, 33/6.6 kV Switchyard equipments and filteration and topping of Transformer oil of Lalnala Lift Irrigation Scheme Tal.Samudrapur Dist.Wardha for Two years
232027 of 2019.2020 Prov. Renovation to Earthing System of Transformer Sub Station and repairs to E I of D.G and Panel Room of Sub District Hospital at Karad Tal Karad Dist.Satara
Providing Internal Electrical Installation Transformer DG Lan Wiring Water Pump Set, Lift AC Solar CCTV, Fire Alarm and Fire Fighting for newly constructed Krushi Bhavan Administrative Building for Agriculture Department Jalna
Providing manpower for operation and maintenance of Switchyard equipments and filtration and topping of transformer oil of Ambhora Lift Irrigation Scheme stage I Tal- Kuhi , Dist- Nagpur for Two calendar year
Providing manpower for operation and maintenance of Switchyard equipments and filtration and topping of transformer oil of Haldipurani Lift Irrigation Scheme Tal- Chamorshi ,Dist- Gadchiroli for Two calendar year_2026 to 2027
Est No 183 /2023-24 Providing Internal Electrical Installation,Street Light,Transformer Pump, Fire Fighting ,in Type III 8 PWD Staff Quarter Umari Taluka,Dist.Nanded.( Sub Work A , B , C, D, )
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, ERECTION OF CABLE TRAYS ALONG WITH STRUCTURE SUPPORT AND TRANSFORMER BAY FENCE REPAIR; Service Provider
ZPBEED/WD2/DPDC/165/2025-26
SET OF QUICK COUPLING FOR MAIN TRANSFORM [SET OF QUICK COUPLING FOR MAIN TRANSFORMER OF THREE PHASE LOCOMOTIVES AS PER CLW SPECIFICATION NO. CLW/ES/3/0456 ALT-K AND CONFIRMING TO CLW DRAWING NO. CLW/ES/3/SK- 4/0456 ALT-C CONSISTS OF (1) MALE COUPLING AS PER ABB ID NO. HSTN 422023 P0003 = 01 NO./SET AND (2) FEMALE COUPLING AS PER ABB ID NO. HSTN 422023 P0013 = 01 NO/SET. ONE SET CONSISTS OF 02 ITEMS, 02 NOS.]
Set of copper washer confirming to IS: 3 [Set of copper washer confirming to IS: 3487-1994 for transformer of three phase loco. One set consists of 02 items 12 Nos. (1) Cu Washer OD: 33 mm, ID: 26.7 mm, Thickness: 2 mm Qty: 04 Nos. (2) Cu Washer OD: 25.5 mm, ID: 21.3 mm, Thickness: 1.5 mm Qty :8 nos. Note: (1) Washer should be punched and edges should be burr free. (2) Copper content shall not be less than 90%.]
Providing Internal Electrical Installation, Transformer. DG Lan Wiring, Water Pump Set Lift, HVAC Solar CCTV Fire Alarm and Fire Fighting for Construction of Assistant Commissioner Food And Drug Administration Building Jalana Dist.Jalna
Synchro Transmitter with Display Setup & Pointer, Synchro Receiver with display setup & pointer, Synchro Control Transformer with display board, Integrate all components into a servo synchro training set up Input supply 230VAC 50Hz
Est. No. 112039/24-25 Providing Internal EI, Pumps, Transformer, Street light, Fire fighting system, CCTV, ACs, DG set, Lift in newly constructedHon Judges Quarters 12Nos at Ambajogai Tq Ambajogai Dist Beed
Providing transformer substation arrangement in premises of 36 Quarters,Type I 12 Nos Type II 12 Nos Type III 12 Nos for Revenue Department Government Employees at Ambad, Tq, Ambad, Dist. Jalna
Supplying and undergrounding cables of offices residences rest house Electrification of enterainment centre, replacement of 100kVA transformer and internal electrification of Minor Irrigation building and resthouse side rooms at Tilari colony Char
Design, Supply, Installation, Testing and commissioning of 20 Meter High Mast Lighting system, 250 KVA Transformer , LT Panel at PALGHAR Main depot, Palghar, complete in all respect for DFC CTP 12 Project.
Est.No.OW/ 52 / 2023 24 Providing 200 KVA Transformer with Line Supply and Street Light and Mini highmast in PWD and Qtrs Premises at Parbhani Dist Parbhani ( Part-A and B) (2nd Call)
Supply, erection, testing and commissioning of Vacuum Circuit Breaker, Current Transformer and other electrical repairing and maintenance work at 11/6.6 kV Switchyard for Satrapur Lift Irrigation Scheme, Tal-Parshivni, Dist. Nagpur
Est. no/ 123018/2024-25 Providing Internal Electrification, LAN, CCTV, Intercom, DG, Transformer, Lift Firefighting Arrengement, Pump, Solar, Street light to trauma care centre at Rural Hospital, Washi, tq. Washi, Dist. Dharashiv.
Prov. and erecting H.T.O.H. line with Transformer and underground L.T. cable for new Sabha Mandap and Sarvotobhadra Mahal area 108 feet Bhagwan Vrushabhdev statue, Mangi-Tungi, at Bhilwad, Tal. Baglan, Dist. Nashik.
Est No.132410 of 2026.27 Prov Internal Electrification, External Electrification, CCTV System, 40 KVA DG Set, 63 KVA Transformer to Construction of Manini Bhavan for Women Entrepreneurship Development at Panchgani, Tal.Mahabalehwar, Dist.Satara
please refer tender notice
As per NIT
AS PER TENDER DOCUMENTS
Est. No. 111259 /24-25 Providing Internal EI, Street light, Water Pump Pole Mounted Transformer, Fire fighting system in newly constructed Quarters for revenue department Type 1-040 at Beed TQ Dist Beed
Providing Lift, Air Conditioning System, DG Set, Water Pump System, and Transformer Substation to proposed upgradation of 50 Beded Rural Hospital Building into 100 Beded Subdistrict Hospital G2 at Ambad, q.Ambad Dist. Jalna
Providing Internal E I, Street light, Water Pump system, CCTV system, Solar Hot Water System and 100 KVA transformer with HTOH line to the Residential Quarters of Govt officers and Staff at Tal.Phulmbari
PROVIDING ERECTING TESTING AND COMMISSIONING LT LINE CONNECTION WITH 22 KV/0.432 KV / 100 KVA TRANSFORMER SUB STATION FOR POWER SUPPLY CONNECTIONS AT RAW WATER PUMPING STATION AT LONAVLA. TAL - MAVAL , DIST - PUNE.
E. No. 2008 of 2020-21 Prov. Single Phase 25 KVA X 3 Nos. Transformer for giving supply to erection of New 30 bedded Govt. Gramin Rugnalaya at Dalwat, Tal. Kalwan, Dist. Nashik.
Est.No./ 122063 /2024-25 / Providing 315 KVA Transformer, HT line MCCB panel And Providing 250 KVA Diesel Generator with Allied Accessories at Cardiac Cath lab Unit of District Hospital Dharashiv Tq.Dist Dharashiv(Recall)
Providing Lift, Air Conditioning System, DG Set, Water Pump System and Transformer Substation to proposed upgradation of 30 Beded Rural Hospital Building into 100 Beded Subdistrict Hospital G2 at Ghansawangi, Tq. Ghansawangi, D
Circular Cutting Machine, Power Hacksaw Machine, Transformer Welding Set With all Accessories 300A, Hand Shering Machine, Notebook Computer Advanced Version, Digital Weight Machine 500 kg Capacity, All in one Computer i5, Laser Printer
Est.No./ 122051/ 2024-25 / Providing Internal Electrification, Telephone, Computer Wiring works, External Electrification (Transformer an DG set) Pumps, Area Lighting, Solar On Grid System CCTV works to Proposed Development of Kapil Vastu, Buddh
Prov. E.I. and 63 KVA Transformer with HTOH line, water pump system, fire fighting system and street light system for Central Administrative Building at Akole, Tal. Akole, Dist. Ahmednagar. Part A to E
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Electrical System or Installation, One time contract for various electrical jobs during HPNA annual shut down, MPNA plant transformer replacement, switchg..
INCOMING LOAD CB PART NO CB200D16B, SHUNT TRIP COIL UNDER VOLTAGE COIL PART NO CB200B15, CONTROL PANNEL ASSY PART NO CB200C, EARTH LEAKAGE RELAY 750MA PART NO CB200C3MA, TEST MICRO SWITCH PART NO CB200C5, MICROSWITCH FOR EARTH LEAKAGE LAMP PART NO ... CURRENT TRANSFORMER FOR ... AUX TRANSFORMER PART ... CURRENT TRANSFORMER FOR ...
As Per Tender Documents
SET OF COPPER BUSBARS FOR 7775 KVA TRANS [SET OF COPPER BUSBARS FOR 7775 KVA TRANSFORMER, ONE SET CONSISTS OF FOLLOWING 02 ITEMS (1) BUSBAR COPPER TYPE 70 AS PER SPEC CLW/ES/3/0412 ALT-H OR FIG 39 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (2) BUSBAR COPPER TYPE 71 AS PER SPEC CLW/ES/3/0412 ALT-H OR OR FIG 40 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (ITEM RESERVED FOR CLW APPROVED SOURCES ONLY)]
SET OF COPPER BUSBARS FOR 7775 KVA TRANS [SET OF COPPER BUSBARS FOR 7775 KVA TRANSFORMER, ONE SET CONSISTS OF FOLLOWING 02 ITEMS (1) BUSBAR COPPER TYPE 70 AS PER SPEC CLW/ES/3/0412 ALT-H OR FIG 39 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (2) BUSBAR COPPER TYPE 71 AS PER SPEC CLW/ES/3/0412 ALT-H OR OR FIG 40 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (ITEM RESERVED FOR CLW APPROVED SOURCES ONLY)]
100A HRC fuse link (Low voltage fuse), DIN type, Rated Voltage 500V AC, Breaking Capacity- 100kA, Suitable for use in secondary side of 60kVA transformer & local main supply of LHB AC Coaches, Confirming to IS: 13703 Pt-2 & RDSO Specification No. RDSO/PE/SPEC/AC/ 0184-2015 (Rev.-1). Makes: Siemens, ABB, wohner, Bushmann, L&T, Italweber, Eaton as per item Sr. no. 8 & 34 of common BOM of RDSO letter no. EL/7.1.108/MSSBC dated 17.09.21 or any other make with prior approval of RDSO/RCF.
SET OF COPPER BUSBARS FOR 7775 KVA TRANS [SET OF COPPER BUSBARS FOR 7775 KVA TRANSFORMER, ONE SET CONSISTS OF FOLLOWING 02 ITEMS (1) BUSBAR COPPER TYPE 70 AS PER SPEC CLW/ES/3/0412 ALT-H OR FIG 39 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (2) BUSBAR COPPER TYPE 71 AS PER SPEC CLW/ES/3/0412 ALT-H OR OR FIG 40 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (ITEM RESERVED FOR CLW APPROVED SOURCES ONLY)]
SET OF COPPER BUSBARS FOR 7775 KVA TRANS [SET OF COPPER BUSBARS FOR 7775 KVA TRANSFORMER, ONE SET CONSISTS OF FOLLOWING 02 ITEMS (1) BUSBAR COPPER TYPE 70 AS PER SPEC CLW/ES/3/0412 ALT-H OR FIG 39 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (2) BUSBAR COPPER TYPE 71 AS PER SPEC CLW/ES/3/0412 ALT-H OR OR FIG 40 OF SPEC CLW/ES/3/0118 ALT-M, QTY- 02 NOS. (ITEM RESERVED FOR CLW APPROVED SOURCES ONLY)]
DG - ROHA INDUSTRIAL AREA...M and R to W/S/S and E/D/S Roha Industrial Area .... Repairing and rewinding of failed trasformer at EDS and Filtration of transformer oil including minor Repairs.
Load extension 01 no of 3 phase public water work supply connection in R/o Sarpanch Grampanchayat Wadivarhe with agumentation of dtc and Changing fabrication materials in the transformer structure based on the load.
Providing, erecting, commissioning with test and trial of 3 Phase, 22/0.415 KV,100 KVA Transformer with D.P structure and allied line for Pure Water Pumping station at Varale WSS, Tal- Maval, Dist-Pune
Facility Management Services - LumpSum Based - Industrial; Job Contract for Supply, Fabrication, Erection, Testing and Commissioning of Heavy Duty Monorail Handling Facilities with Chain Pulley Blocks at SAF-1 Furnace Transformer Area and General Ele..
As per Tender Documents
Isolation Transformer (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6928176 Dated : 25-11-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
A.C. Voltmeter, A.C. Ammeter, Kilo Wattmeter, DC Power Supply, Cut model of watermill and hydro power, 3- point D.C. Starter, 4- point D.C. Starter, Three phase transformer, shell type oil cooled, Solar panel with Battery, Relays. a. Cutout b. ... Auto Transformer type, ...