Loading…
Loading…
3,920 results • Best match
Works Contract to carry out the Erection of poles and distribution transformers and allied extension works for the year 2019-20 by using Private Contractor in Erode South Sub Division of Erode South Division
Work contract on Distribution works for erection / dismantling of Distribution Transformers, pillar,poles, structure, laying of HT and LT cable , Stringing of OH line, re sagging, strengthening, and its allied works etc., including painting.
Work contract on Distribution works for erection / dismantling of Distribution Transformers, pillar,poles, structure, laying of HT and LT cable , Stringing of OH line, re sagging, strengthening, and its allied works etc., including painting
Work contract on Distribution works for erection / dismantling of Distribution Transformers, pillar, poles, structure, laying of HT and LT cable , Stringing of OH line, re sagging, strengthening, and its allied works etc., including painting
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Execution of Removal and re laying of cable, Termination, Installation of MV distribution panel boards and Transformers, fabrication and installation of s..
HIRING OF ELECTRICIAN SKILLED, TEST OF EARTH PIT TEST REPORT HALF YEARLY, TESTING OF RELAY FDOL CONT, SERVICING OF ACB, SERVICING OF VCB, TESTING AND CHECKING VCB BOTTLE, WTI TESTING AND CALIBRATION, OTI TESTING AND CALIBRATION, THERMOGRAPHY OF ... RESISTANCE, TRANSFORMER OIL ... FILTRATION, TRANSFORMER OIL
Renewal of 250 KVA, 11 KV / 433 Volts Outdoor Transformer and MV Panel Board at Government Industrial Training Institute, Chengalpattu in Chengalpattu District.
Water wash cleaning the generator transformer bushings, Lightning arrestor and support insulators for the year 2022-23 for unit I, II and III.
Construction of Drain at ward No 5 Gandhi Arunthathiyar colony Nagaraj house to Transformer near Raj house in Seerappalli Town Panchayat Namakkal District
SUPPLY AND FIXING OF FLOWER GRILL ON TRANSFORMER VIEW CUTTER AT VARIOUS LOCATIONS IN DIVISION-18, 20 and 21, UNIT-5, ZONE-02
PROCUREMENT OF 11KV VERTICAL GANG OPERATED AB SWITCH WITH COMPOSITE POLYMER INSULATORS,SINGLE SQUARE POLE TRANSFORMER STRUCURE MATERIALAND SOLID CORE HG FUSE SETS .
Fire Insurance coverage for the Gas Turbine, Generator with auxiliaries, Generator Transformer, Gas/Diesel handling equipments, building of four Gas Turbine Power Stations
Construction of Structural plinth,retaining wall around yard,transformer plinth,fire protection wall,oil sump and metal spreading at Nallur 230/110KV SS
13/2020-21 of SE GCC CBE
As Per BOQ
Facility Management Services - LumpSum Based - Industrial; O&M of Electrical Work, Diagnostic testing of 100MWe or above capacity Turbo-Generator OR 220KV rated power transformers; Consumables to be provided by service provider (inclusive in contract..
MTPS-I ES EM-II SD-III- Cleaning of HVR Transformers, support insulators and rapping motors at ESP roof top of Unit-I, II during the respective Unit Annual overhaul for the year 2025-2026
Labour charges for Dismantling loading Transporting and unloading erection of Power Auto transformers earthing oil draining Hot oil circulation hot air blower wiring painting and leading for Project and Erection of Annur division GCC Cbe
Attending Minor repair works, Testing and checking the healthiness of electronic controller, control panel, High Voltage Rectifier transformers, heaters and rapping motors etc in ESP-IV and V for the period from 08.04.2022 to 30.09.2022.
Shifting of Existing HT LT OH lines and Double Pole Structures with Distribution Transformers at Puthur Main Road Madambakkam Section in the main work of Formation of Tambaram Eastern bye pass Road Km 3.900- 5.450
Work contract on Distribution works for erection / dismantling of Distribution Transformers, pillar,poles, structure, laying of HT and LT cable , Stringing of OH line, re sagging, strengthening and allied works etc, including painting , re sag
RE GLANDING WORKS, CABLE FAULT IDENTIFICATION, CABLE RECTIFICATION, SUPPLY OF COPPER JUMPERS, CONSTRUCTION OF EARTH PIT, EARTH PIT REVAMPING, COPPER EARTHING ROD, CEA LIASONING CHARGES, INSULATION MAT TESTING, ANALOG VOLTMETER AND AMMETERS, BREAKDOWN ... TESTER, TRANSFORMER OIL ... TESTING, TRANSFORMER OIL ... FILLING, TRANSFORMER INSULATION ...
MICRO CONTROLLER CARD, TRANSFORMER CARD PCB NO 381A, OIL PUMP COVER, STARTING KEY, KEY BOARD, SNUBBER CARD PCB NO.380, SLOTED CHEESE HEAD SCREW
Operation and Comprehensive maintenance of transformer Substation and EA sets in Haddows Road Chennai TE SW Replacement of CT and PT for MD reduction
Enhancement of existing 230 110 KV Auto transformer capacity fro 2x100MVA in to 3x100 MVA at Ambattur 3rd main road 230 110 KV SS
Providing a new RCC main road leading from control room to Transformer yard in Mangalamedu 110 KV SS of chainage 50to100m at PEDC Perambalur
Supply and erection of cable accessories and laying of 110KV UG cable for enhancement of 230/110 KV Auto transformer at koyambedu 230KV SS
Improvement of BT Road at Ward No.04, Vanniya Nagar Transformer Road and Ward No. 12, Mettu Muniyappan Kovil Road in Poolampatty Town Panchayat
carrying out the work of arresting oil leak in 230 110KV,100MVA Auto Transformer I with Sl.No HT1701 12606 at 230KV Valuthur Sub Station
Providing HT supply, 250 KVA Transformer and suitable MV panel Board arrangements in Thiruvalluvar University at Serkadu Village in Katpadi Taluk of Vellore District.
Supply and Installation Servo Transformer and Drilling of a new Bore well under CWSS to Mudiyanur and 8 other rural habitation in Kallakurich District
Supply and Installation Servo Transformer and Drilling of a new Bore well under CWSS to Thagadi and 8 other rural habitation in Kallakurichi District
SUPPLY OF GALVANIZED 11KV SINGLE POLE TRANSFORMER SUPPORT STRUCTURE VERTICAL AB SWITCH MOUNTING MATERIALS AND HG FUSE MOUNTING MATERIALS WITH CLAMPS FOR IPDS SCHEME
Internal inspection and Tightness Checking and fault attending of 15.75 KV 230KV 84MVA Generator Transformer Y phase in Unit IV and its allied works
MTPS-I-ES-EM-I- SCRAPPING CLEANING AND PAINTING OG TURBO GENERATOR CASING,GENERATOR TRANSFORMER, UAT 3A AND 3B AND OTHER AUXILIARIES OF TG.
Custom Bid for Services - Servicing of 16MVA, 11/12kV Booster Transformer at SSTP - BHEL Trichy Similar Category Customized AMC/CMC for Pre-owned Products
Transformer Oil BDV Test Kit (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Past Performance 80 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6370011 Dated : 24-06-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 36 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SR.DFM/MAS OFFICE OF THE DIVISIONAL RAILWAY MANAGER, FINANCE BRANCH, SOUTHERN RAILWAY, PARK TOWN, CHENNAI600 003 (Srdfm/mas) Splitting
Exacavation,erection of 2 Nos. Double pole Distribution transformers structure works and other allied works in Virinjipuram area in respect of AE Virinjipuram Section of AEE West Vellore Sub Division of Vellore division of Vellore EDC
TTPS ES Circle EM I Complete preventive maintenance of LT breakers, HT breakers, HT panels, LT panels, LT modules in 6.6kV Switchgear control room, Generators with their auxiliaries, Generator Transformers, UATs, STs USTs SSTs 230kV indoor
Attending Minor repair works Testing and checking the healthiness of electronic controller control panel High Voltage Rectifier transformers heaters and rapping motors etc in ESP IVandV for period from the date of commencement of work upto30.09.2018
As per BOQ
ELECTRICAL SERVICE ASSISTANCE GENERAL SHIFT, ELECTRICAL SERVICE ASSISTANCE ON SHIFT, OLTC SERVICE AND TESTING, TRANSFORMER OIL, TRANSFORMER OIL TESING AND FILTRATION, RELAY TESTING AND CALIBRATION, ACB TESTING CALIBRATION SERVICE, EARTH PIT TESTING, AMMETER CALIBRATION AND TESTING, EARTH FAULT RELAY TESTING, OVER CURRENT RELAY TESTING, HT CABLE TESTING, IR TESTING, RUBBER MAT TESTING, INSTANTANEOUS RELAY TESTING, VCB TESTING
Replacement of worn out gasket along with supply of required materials and overhauling of 100MVA EMCO make 230KV Auto transformer II with hot oil circulation
Providing Balance Metal Spreading in Transformer Bay Suppling and fixing of Air Conditioner Water line Arrangement and Jungle clearance for the Kalivelampatty 230110 KV SS
Balance structural works in staircase -2, 4 , 7, crane gantry walkway in STG building Mill bunker building and mono rail fixing in transformer maintenance building.
replacement of failed 3X66.67MVA, 400-110 kV Interconnecting Transformer IV by a new 400/110kV, 200MVA Composit unit at K.R.Thoppur 400kV SS in mettur EDC
Supply Installation and Commissioning of 75 Ton C Frame Pneumatic Power Press with all Accessories and Tools and dies required for manufacturing Transformer Structure Set
Repair and Overhauling Service - Replacement of Power supply boardrepair and servicing of Areva make Presently Schneider make Micom P633 transformer protection relay which is having Power supply card failure problem; Areva Make Presently Schneider Ma.., Repair and Overhauling Service - Replacement of Processor firmware reloadingrepair and servicing of Areva make Presently Schneider make Micom P343 Generator protection relay which is having display Problem; Areva Make Presently Schneider Make; No; Se.., Repair and Overhauling Service - Replacement of keypadrepair and servicing of Areva make Presently Schneider make Micom P122 feeder protection relays which are having scrolling Problem; Areva Make Presently Schneider Make; No; Service Provider Premi.., Repair and Overhauling Service - Replacement of Power supply boardrepair and servicing of Areva make Presently Schneider make Micom P220 motor protection relay which is having measurement Problem and only R phase is measurable condition; Areva Make P.., Repair and Overhauling Service - Replacement of Power supply board extension boardrepair and servicing of Areva make Presently Schneider make Micom P122 feeder protection relays which are having display Problem; Areva Make Presently Schneider Make; N..
Attending general monitoring Protection Control Metering Testing and Routine Periodical maintenance and minor repair works pertaining to MRT Division of the areas like HT LT Switchgears Transformers HT LT Motors MOV s and other Electrical 365 days
Shiftingof Existing 11KV HT LT OH Line Shifting conversion of existing conventional structures into 11 KV RMUs along with distribution transformers due to wideningofECR to Six lane from Km 18.140 22.300 in Injambakkam TANGEDCO O.M Section Jurisdictio