Loading…
Loading…
15,072 results • Best match
Unbranded Transformer Winding Resistance Meter, Open current voltage >/=50
Modification of Station Transformer #4 (TOD) Bus Duct for E and C ofTelk make New Station Transformer
The work for the maintenance of 400/630 KVA T/F at various Places in Kosi Town due to maintain of Electric Supply and avoid Transformer Damage and any Accident and at the area of E.D.D.-IInd, Kosikalan, Mathura
For Increasing Capacity of Existing Distribution Transformer and Installation of New 100 KVA Transformer at Various Places to Strengthening Distribution System to Give Supply As Per Roster in Nagar Nikay in Faridpur under EDD-II, Bareilly
Repairing of distribution transformer plinth as per standard of T F capacity to avoid damage of transformer installed under the work area of 33 11 KV S/S PURANIYA under EUDD, Daliganj LESA, Trans Gomti, Lucknow.
ForCarriage of T/F trolley from S/S to damaged T/F Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformer, carriage back transformer trolley to Sub-Station under the jurisdiction of Thakurganj
Change of the Transformer from welded top cover to new top cover and flange with nuts and bolts at Azamgarh Transformer repairing Workshop center Under EWD Azamgarh
For Safe loading Carriage and unloading and proper stacking of Repaired Transformer 160 KVA to 630 KVA from Transformer Repairing Workshop to another workshop center under E.W.D Allahabad
Capacity increasing of Transformer in the scheme of Business Plan- 2023-24 under EDD-I/II/III Azamgarh
Line construction and Transformer Stablisment under BP Area of EDD-IV Jaunpur
Supply of 63 KVA LEVEL 2 Transformer under DDUGJY RE 12th Plan
supply of 16 KVA Transformer Level 2 under DDUGJY RE 12th Plan
Supply of 33 kV Current Transformers (CTs) for various Substations of North-Eastern Region of POWERGRID
Preventive maintenance of medium capacity 160 KVA to 1000 KVA Distribution Transformers on site at Prayagraj and Kaushambi under Zone-I and II
Preventive maintenance of medium capacity 160 KVA to 1000 KVA Distribution Transformers on site under EWD Azamgarh, Gorakhpur and Basti Under EWSC Varanasi
Preventive maintenance of medium capacity 160 KVA to 1000 KVA Distribution Transformers on site at Maharajganj, Deoria and Kushinagar under Zone-II Gorakhpur
Loading Unloading and Safe Cartage of Store Material (Exculding Pole and Transformers) From Various Electy. Store Centres to ESD SRE inculding Proper Stacking
For Safe loading Carriage and unloading and proper stacking of Repaired and Damage Transformer 160 to 630 KVA from different Tfs repairing workshop to another Workshop under EWD Prayagraj
Replacement of Gasket of 40MVA Transformer at 132KV S/S Asha under ETD Shahjahanpur
Repairing of 10 KVA damaged Transformer at DPH Manduadih workshop Varanasi under EWD Varanasi
Replacement of Gasket of 20MVA Transformer at 132KV S/S Banda under ETD Shahjahanpur
For repairing of 250 KVA Damage Transformer at Jaunpur Workshop Jaunpur under EWD Varanasi
For repairing of 10 KVA Damage Transformer at Jaunpur workshop Jaunpur Under E.W.D. Varanasi
For Repairing of 10 KVA Damage Transformer at Manduadih Workshop Varanasi Under E.W.D. Varanasi
Replacement of 10 MVA Damage Transformer at 33 KV Sub Station Hatim Sarai Sambhal
For the Work of Repairing and Painting of Damaged Fencing of Distribution Transformer in the areas under 33/11 KV S/s Shahdana , under EUDD-III Bareilly
Supply and Installation of Missnary Type Fuse Unit (Tailles Unit) for Distribution Transformer at all 33/11 KV Sub-Station Ayodhya under Electricity Distribution Division-Ist, Ayodhya
For Installation of New Distribution Transformer of 25 KVA and 100 KVA at Various Places under Business Paln 2024-25 (Summer Plan) scheme under EDD- 2 Bareilly
Supply of Copper Delta wire with ten paper covering special for Distribution Transformer as per ISS No. 7404 with its latest Amendment if any. Size 2.00 mm
For Increasing Capacity of Existing Distribution Transformer (100 KVA to 250 KVA) at Various Places under Business Paln 2024-25 (Summer Plan) scheme under EDD-II, Bareilly
For the Work of Repairing of Damaged Fencing of Distribution Transformer in the areas under 33/11 KV S/s Civil Lines-III , under EUDD-III Bareilly
Supply of Egyptian Cotton Tape as per relevant ISS meant for Electricity Use in repairing of 25 KVA to 100 KVA Distribution Transformer and as per specification
Transformer Plinth
Replacement of damage transformers in urban area having capacity 10 KVA to 630 KVA under Electricity Distribution Division-I Pratapgarh
Minor OH centrifuging of 1.6MVA UST transformer, Draining of oil from main tank and disconnecting HV LV chamber, Dismantling of transformer including core coil assembly hot oil flushing and final assembly, Complete dry out of core coil assembly in ... new transformer oil ... of transformer , ...
Change of the Transformer from welded top cover to new top cover and flange with nuts and bolts at different Transformer repairing Workshop centers area Under EWD Varanasi
Change of the Transformer from welded top cover to new top cover and flange with nuts and bolts at different Transformer repairing Workshop centers area Under EWD Azamgarh
Repairing and Overhaling of Power Transformer of 33/11 KV Sub-Station Kumarganj, Milkipur Grameen, Ranibazr and Shahganj Under Electricity Distribution Division-IIIrd, Milkipur Ayodhya
Star Delta type Earthing For Power Transformer of Nutral and Pipe Type Earthing for Body at Different Places Under Electricity Distribution Division-IIIrd, Milkipur Ayodhya
FOR WORK OF PREVENTING OIL LEAKAGE OF POWER TRANSFORMER INSTALLED AND MISCELLANEOUS MAINTENANCE WORKS AT 33/11 KV S/S SIRAULI UNDER EDD-I, BAREILLY
FOR WORK OF ARRESTING OF OIL LEAKAGE OF POWER TRANSFORMER AND OTHER MISC. WORKS AT 33/11 KV S/S MIRJAPUR UNDER EDD-I, BAREILLY
Terminal Block for Transformer oil Pump [Terminal Block for Transformer oil Pump (MPH) Flowwell make Model No:1143L to Flowwell part no. 210106/3.]
FOR SUPPLY OF VARIOUS RATIO 36 KV CURRENT TRANSFORMER AND 36 KV POTENTIAL TRANSFORMER FOR VARIOUS S/S UNDER TRANSMISSION (NORTH-EAST) ZONE Gorakhpur
Capacity enhancement of Transformer and installaltion of new transformer and Installation of HT/LT fuse set under EDD-2nd Mau in Nagar nigam Plan
Civil works related to Installation of new 160 MVA Transformer in place of damaged 160 MVA Transformer at 220 KV Sub Station Barahuwa Gorakhpur
Construction of 01 No 132KV/33KV Transformer Bay for 63MVA Transformer alongwith other associated Works at 132KV Substation Bareilly-II (Balipur), under E.T.D., Bareilly
The work for Work for carriage of old and damage transformer form site to Workshop Centre, new/repaired transformer from Store Centre to site
The work for Work for carriage of old and damage transformer form site to Workshop Centre, new/repaired transformer from Store Centre to site
The work for Work for carriage of old and damage transformer form site to Workshop Centre, new/repaired transformer from Store Centre to site
Dismantling of single Radiator of different capacity Transformer. Providing by Fabrication and Erection of new single Radiator on different capacity transformer under EWD Ghaziabad