Loading…
Loading…
15,081 results • Best match
CLEANING AND WASTE DISPOSAL AT THE PREMISES OF TRANSFORMER REPAIRING WORKSHOP-TALKATORA, LUCKNOW
Supply of LT Bushing Rod(brass) for used the repairing of damaged transformer.
Replacing/Repairing of Halogen Lights on Existing Poles at Transformer Repairing Workshop, Badaun
Repairing and Modification Work of 01 No Oven at Transformer Repairing Workshop, Badaun
Replacement of Damaged or burned Transformer in IPDS Town under EDD-II, Sitapur
Replacing/Repairing of Halogen Lights on Existing Poles at Transformer Repairing Workshop, Badaun.
Work of 100 KV transformer capacity instead 63 KVA at goharni and TC
FOR THE WORK OF LOADING/UNLOADING OF DAMAGED TRANSFORMER FROM SITE TO STORE
Selection of Laboratories for Testing of Products/Material - Oil; Transformer oil; Sample; Chemical
Selection of Laboratories for Testing of Products/Material - Oil; TRANSFORMER OIL; Sample; Chemical
11 or 33 kV Outdoor Live Tank Current Transformer (BHEL) (Q3) (3 (3 ))
AWAS VIKAS STHIT MEMORIAL ME 400 KVA TRANSFORMER KI AAPURTI KA KARYE.
WORK OF DISMANTLING OF OLD 40 MVA TRANSFORMER , INSTALLATION OF NEW 63 MVA TRANSFORMER AND OTHER ASSOCIATED WORK AGAINST INCREASING CAPACITY AT 132 KV S/S KASIA, KUSHINAGAR UNDER ETD -I , GORAKHPUR
The work for Repairing of Transformer plinth, Transformer Fencing, strengthening of Single/Double pole, Resagging of 11kv/LT lines and Gaurding of HT/LT line on Directed G-20 route under Urban Electric Distribution Circle -II Varanasi
REPAIRING OF BHEL MAKE BAPCON/BAPCON PLUS/ ARECA CONTROLLER SUITABLE FOR 1200 Ma 70 kV HVR TRANSFORMERS OF ESP of 2X500 MW, BTPS, Anpara
Repairing of 25,63 and 100 KVA damaged Transformer at Old Shade Sant Kabir Nagar workshop Sant Kabir Nagar under EWD Basti
For repairing of 25, 63 and 100 KVA Damage Transformer at New Shade Ghazipur workshop Ghazipur under E.W.D. Varanasi
For repairing of 25, 63 and 100 KVA Damage Transformer at New Shade Manduadih workshop Varanasi under E.W.D. Varanasi
For repairing of 25, 63 and 100 KVA Damage Transformer at New Shade Basti Workshop Basti under E.W.D. Basti
For repairing of 25, 63 and 100 KVA Damage Transformer at New Shade Azamgarh Workshop Azamgarh under E.W.D. Azamgarh
For Repairing of 25, 63 and 100 KVA damaged Transformer at Old Shade Manduadih workshop Varanasi under EWD Varanasi
For repairing of 25, 63 and 100 KVA amage Transformer at Old Shade Sant Kabir Nagar under E.W.D. Basti
The following work is to be carried out for attending leakage of one no power transformer installed at 33 11 kv Raghunathpur sub station of EDSD III Dasna under EDD Muradnagar
Arrangement of Heavy duty cooler for one month to protect power transformer in the area of EUDD Mahangar, University and Sitapur road under jurisdiction of S.E. EUDC-Mahanagar, Jankipuram zone, Lucknow
Painting of Power Transformer, Switch Yard Equipment, Stricture and Wiring of Control Room in the work area of 33/11 KV Sub Station AHIBARANPUR Under the jurisdiction of EUDD-DALIGANJ, Lucknow
The Work for Replacement of packing of 05 and 10 MVA Power Transformer installed at 33/11 KV S/s Datiya/Jajampatti and other work in jurisdiction of E.D.D. Goverdhan, Mathura
For Installation of 1 No 5MVA Power Transformer due to reduce overloading Substation Kalyanpur and other associated work under EUDD Indiranagar on Semi Turnkey basis against Additional Business Plan 2023 2024
The Work for Replacement of packing of 10 MVA power Transformer installed at 33/11 KV S/s Shergarh under M and R work in jurisdiction of E.D.D.-IInd, Kosikalan, Mathura
Safe loading Carriage and unloading and proper stacking of Damaged/Repaired Transformer 10 to 630 KVA from different division Transformer Repairing Workshop center to under EWD Gorakhpur
Safe loading Carriage and unloading and proper stacking of Damaged/Repaired Transformer 10 to 630 KVA from different division Transformer Repairing Workshop center to under EWD Mirzapur
Safe loading Carriage and unloading and proper stacking of Damaged/Repaired Transformer 10 to 630 KVA from different division Transformer Repairing Workshop center to under EWD Basti
Complete overhauling of 90 KVA, BHEL make HVR Transformer of ESP of 2X500 MW, BTPS, Anpara
the work of Replacement of old and damaged transformers in the area of Executive Engineer Electricity Urban Distribution Division-II Vrindavan
Complete dismantling, shifting, erection, commissioning, and testing of a ECP Panel with additional job of Complete Overhauling, transformer oil centrifuging and testing of BHEL make HVR transformer unit 1,2 and 3 of 3x210 MW ATPS, Anapra as pe
repairing and rewiring of 40 MVA Transformer-II BBL make marshalling box, providing and fixing of cooling fan on 40 MVA Transformer-II marshalling box at 132/33 kv Sub-station Dumariyaganj
For the Work of Business Plan 2023-24 Nagar Nigam for Installation of 07 No. Additional 250 KVA Transformer Due to Overloading of 400/630 KVA Transformer Work Under EUDD-I, Meerut.
Civil Works For Construction Of increasing Capacity from 1x63 Add 1x40 MVA to 1x63 Add 2x40 MVA with Transformer Bay 40 MVA Transformer bay , At 132 KV S/S Niwari Road , Ghaziabad.
Repairing/rewinding of electrical equipments (like 02 nos. Transformer of 100 KVA, 02 nos. transformer of 50 KVA ,01 no. of 110 KW Motors) being used in Dudhichua mines for mines work
Replacement of damaged 100MVA Transformer with another 100MVA Transformer allotted from 220KV Substation Hardoi including carriage upto 220KV Substation Faridpur alongwith Erection and associated Works at 220KV Substation Faridpur under ETD, Bareilly
The increasing capacity of 25 to 63 KVA Transformer and 10 to 25 KVA Transformer in khanapatti and Gonapar bazar of block sikrara in Sansad nidhi 2022 23 under EDD II Jnp
For Installation of 250 KVA Transformer near By at Tanky Wala Park in Sector-07 to Avoid Overloading of 100 KVA Transformer in the Area of EUDD-II, Meerut Under EUDC, Meerut.
Maintenance and centrifuging of 10 MVA Transformer in 33/11 K.V. Sub-Station Gauriganj (Gramin) and 5 MVA Transformer in 33/11 K.V. Sub-Station Barntikar under EDD-Ist (Gauriganj), Distt. Amethi.
CARRIAGE OF DAMAGED TRANSFORMER FROM SITE TO STORE BSR AND REPAIRED TRANSFORMER FROM STORE BSR TO SITE IN THE AREA OF SDO SYANA TOWN, BUGRASI AND BB NAGAR UNDER EDD-IV, SYANA.
WORK OF SPECIAL DELTA EARTHING OF 63 MVA TRANSFORMER-I AND II , 132 KV AND 33 KV L.A. AND 160 MVA TRANSFORMER AT 220 KV S/S BARAHUWA UNDER ETD-II , GORAKHPUR
For the Work of Business Plan 2023-24 to Capacity Increasing and Installation of 03 No. Additional 250 KVA Transformer Due to Overloading of 400 KVA Transformer Work Under EUDD-IV, Meerut.
SAFELY LIFTING THE EXTRA 05 MVA TRANSFORMER KEPT AT 33BY11 KV SUBSTATION KARHAL ROAD INSTALLING AND ENERGIZING IT AT 33BY11 KV SUBSTATION KUCHELA DISPLACING THE DAMAGED 05 MVA TRANSFORMER UNDER EDDKARHAL MAINPURI
WORK OF COMPLETE ERECTION, INSTALLATION OF 132/33 KV, 40 MVA TRANSFORMER AND OTHER ASSOCIATED WORKS LIKE DISMAINTLING OF 20 MVA TRANSFORMER ETC. AT 132 KV S/S KABRAI UNDER ETD HAMIRPUR.
The work of installation and energizing a trolley transformer in place of the burnt and damaged 250, 400 and 630 kva transformer under the excutive engineer, power distribution subdivision-I, Town Ghazipur
INSTALLATION OF TWO NOS. 20 MVA, 132/11 KV TRANSFORMER IN PLACE OF OLD AND USED 20 MVA 132/11KV TRANSFORMER ALONG WITH OTHER ASSOCIATED WORKS AT 132 KV SUB-STATION NARAYANPUR
Inhibited Mineral Insulating Transformer Oil as per IS : 335/2018 and Railway requirement as per RDSO Letter no. TI/PSI/INSOIL/POLICY/19/01-18 dated 26.07.2019. MAKE/ BRAND-RAFTAR TRANSFORMER OIL