Loading…
Loading…
15,095 results • Best match
M. S. TANK FOR STEPDOWN TRANSFORMER– A FOR 1500 KVA AVR OUTSIDE– EPOXY PAINT INSIDE– HOT OIL RESI, M. S. TANK FOR BUCK BOOST TRANSFORMER– C FOR 1500 KVA AVR OUTSIDE– EPOXY PAINT INSIDE– HOT OIL RE, M. S. TANK FOR B4C REGULATOR– B FOR 1500 KVA AVR ... KVA TRANSFORMER OUTSIDE– ... KVA TRANSFORMER OUTSIDE– ...
Vacum cleaning of 132/33KV Control and Relay panel of line and transformer at 132KV S/S Malwan and Jahanabad under ETD- Fatehpur.
For repairing of 25, 63 and 100 KVA Damage Transformer at Workshop Manjhanpur New Shed Distt Kaushambi under E.W.D Prayagraj
Construction of 11/0.4 K.V. Sub-Station (New 100 K.V.A. Transformer) at Shamnan Garden, Tube well No.05, Near Sachin Gupta Factory, Kudha wala Transformer, Kala Pahad, Chor Ghati Petrol Pump in the area of E.U.D.D.-Rajajipuram, LESA CIS Gomti, Luckn
Construction of 132KV 40 MVA Transformer Bay by conversion of 132KV TBC Bay into 132KV Transformer Bay and construction of new 132KV TBC Bay by extension of Switchyard alongwith other associated works at 132KV S.A.S. S/S Sahaswan under ETD, Budaun
ADDING OF 01 NO. 160 MVA TRANSFORMER ALONG WITH SHIFTING AND COMPLETE ERECTION OF 160 MVA TRANSFORMER WITH CONSTRUCTION OF 01 NO. 220 KV BAY AND 02 NOS. 132 KV BAY AND REPAIR OF EMULSIFIRE SYSTEM WITH ALL ASSOCIATED WORK
Work for Installation of New Transformer and Capacity enhancement of Transformer Laying AB cable ACSR Dog Conductor in place of Jarjar Conductor in Govind Nagar Division under EUDC-II KESCo Kanpur Work will be done under BP 2023-24 Scheme
Work for Installation of New Transformer Capacity enhancement of Transformer Laying AB cable ACSR Dog Conductor in place of Jarjar Conductor and 33 KV underground cabling Work BP 2023-24 in World Bank Barra Division under EUDC II KESCo Kanpur
Work for Installation of New Transformer Capacity enhancement of Transformer Laying AB cable ACSR Dog Conductor in place of Jarjar Conductor Making Guarding arrangement of 11 33 KV Over Head and Replacement of Jarjar pole Work in Kidwai Nagar Divisi
For Installation of 1 No. 250 KVA Transformer in the Lalkurti Area at Fuvvara Chowk Feed from 33/11 KV Sub-Station, MES to Avoid Overloading Problem of 400 KVA Transformer in the Area of EUDD-IV, Meerut Under EUDC, Meerut.
Construction of 11/0.4 K.V. SuB Station (400 K.V.A. Transformer) at Wazeerbagh in the area of E.U.D.S.D.-Noorbari and Increasing capacity of 400 K.V.A. Transformer in to 630 K.V.A.Transformer at Mallpur Gaon in the area of E.U.D.S.D UPTRON LESA CIS
THE WORK FOR REPLACEMENT OF 01 NO. 20 MVA TRANSFORMER BY NEW 40 MVA TRANSFORMER AGAINST INCREASING CAPACITY FROM 3 X 20 MVA TO 2 X 40 plus 1 X 20 MVA AT 132 KV SUB STATION SHAHBAD UNDER ETD RAMPUR
Set of bend pipes from radiator to MPH and transformer for 5400 kva transformer of WAP4 locos 1) SS oil cooling pipe with flange for 5400 as per ELS/ED drg No Sr.DEE/RS/ED/Elect-129. (2). SS bellow wi
For Installation of Additional (05Nos.) 11/0.4KV, 250KVA Transformer for reducing the load of overloaded 400KVA Transformer and construction of associated 11KV and LT line at different places in the area of UEDD-I, Varanasi under Business Plan 2018-1
Replacement work of damaged 11 KV/110 Volt Potential Transformer (PT) for the metering of 11 KV feeders emanating from 33/11 KV Substations under EDD-I/II/Harraiya, Basti.
CWEK/T-36/969 EWS/2026-27 PROVN OF 100 KVA TRANSFORMER, VOLTAGE STABILIZER AND ALLIED SERVICE AT SULTANPUR KANDI AND SPL REPAIR OF TRANSFORMER AND VOLTAGE STABILIZER AGAINST BER EQPT AT URI IN THE AOR OF AGE E/M UNDER GE 969 EWS
Construction of CC road from Kaushalendra Pandey s plot to transformer within the limits of Nagar Panchayat Patiali
Repairing of 10,16 and 25 KVA Cylindrical body C.R.G.O Cell type Core Damaged Transformer at Mau and Ballia Workshop Under EWD Azamgarh
Carriage of 100MVA Transformer 220KV Pilibhit to 220KV Nighasan and installation and associated work at 220KV S/S Nighasan under ETD Lakhimpur
Supply and Installation of Transformer Differential Relay of 63 MVA T/F-I _ II at 132KV S/S, Tundla Under ETD, Firozabad
For Testing of protective system of power transformer 11 KV Switchgear 33 KV control panel in the area of 33 KV Jankipuram in the Jurisdiction of SE Technical Jankipuram zone Lucknow against M and R 2025 26 Head
Carriage and replacement of damaged LT power cable and transformer oil from 220 KV S/S Manth, Mathura to 220 KV S/S,Sikandra, under ETD- II Agra
work of testing of DGA, PPM and BDV for health monitoring of 560 Nos. Transformers installed at various Sub-Stations under the jurisdiction of Transmission West Zone
Increasing capacity of Transformers of Different Location in the area of EUDD- Indir Nagar, Lesa Trans Gomti, Lucknow according to sactioned package under Business Plan 2019-20.
Replacement of Old and Damaged Tin Sheet, Repairing of old water pipe line and old oil pipe line and other associated work at Transformers repair workshop Sitapur
Maintenance of NGR protection system of power transformers at 33 KV Coal, OB and Main substation for compliance of contravention given by DMS(Elect.) at Bina Project
WORK OF REPAIRING DAMAGED FENCING OF VARIOUS CAPACITY DISTRIBUTION TRANSFORMERS, DIFFERENT LOCATIONS FEEDED FROM VARIOUS 33/11 KV SUB-STATIONS UNDER THE JURISDICTION OF EUDD-III, MORADABAD
Testing and maintenance AMC work of 11 KV and 33 KV Breaker and Transformers installed at various 33 by 11 KV Sub Stations under EUTD II GZB
Work related to increasing the capacity of distribution transformers at various 33/11 KV power sub-stations in the Business Plan 2025-26 under EDD-Syana, Bulandshahr.
Making new delta, Strengthening of Neutral Earthing of Transformers, M and R work of various 132 KV Sub Stations at ETSD-III, Kasia under ETD-I, Gorakhpur.
To remove overloading of distribution transformers established under Business Plan year 2023-24 under Executive Engineer Electricity Distribution Division, Khalilabad Capacity building work at the following places
Quantum of works involved for providing boaring type earthing at distribution transformers under the area of 33/11 KV S/S Kashi Ram Under EDD-I, Unnao.
For Earthing of Distribution Transformers installed in the area of 33/11 KV Sub Station GTI and Residency under the jurisdiction EUDD- Residency LESA Cis-Gomti Lucknow.
Quantum of works involved for providing fixing of bore type earthing of Power Transformers at 33/11 KV Substaion under the Electricity Distribution Division-III, Purwa, Unnao.
Work of carriage and replacement of damaged 1 MVA, 630 KVA, 400 KVA, and 250 KVA transformers installed on pump canals under the area of EDD, Sakaldiha.
Work for shifting of 11 Kv Lines and transformers and other associated works during road widening from Bindki Lalauli to korakanak Marg (Two lane) in EDD, Fatehpur
Carriage of medium power damaged/repaired distribution transformers of different capacity under the jurisdiction of Electricity Urban Distribution Division-(Technical) 11 KV and LT Line Network, Moradabad.
Shifting work of 11 KV line, LT line and Distribution Transformers under the full deposit scheme in the area of Electricity Urban Distribution Division-Civil Line, Muzaffarnagar
For Water Level Earthing of Medium Power Distribution Transformers near DK Factory in Mohall Shyam Nagar in the area of EUDSD-VI, Mrt. Under EUDD-III, Meerut.
Increasing capacity of different Distribution Transformers in the area of E.D.D.I, II,III-Purwa IV-Bangarmau V-Hasanganj under E.D.C.UNNAO against Package EDCU/D-5TH/B.P2021-22
Work of transporting damaged transformers of different capacities from site to workshop and from workshop to site on the basis of rate contract under EDD-Syana, Bulandshahr.
Construction of damaged and new plinth work of earthing and fencing of various distribution transformers in the area of Vaishali and Seemant Vihar under EUDD II Ghaziabad
Work of installing tailless units on distribution transformers and replacing wires of 11 KV line in the Business Plan 2024-25 (Part-2) under EDD-Sikandrabad, Bulandshahr.
Work related to increasing the capacity of distribution transformers at various 33/11 KV power sub-stations in the business plan 2025-26 under EDD-Sikandrabad, Bulandshahr.
Body earthing and neutral earthing work of 250 kVA to 400 kVA distribution transformers installed at various 33/11 kV power substations under Electricity Distribution Section-Dibai.
For the Works of Maintenance and Stoppage Leakage of Power Transformers at Installed Various 33/11 KV Sub-Stations of EUDSD-IX, Meerut Under EUDD-II, Meerut.
Supply and installation and Repairing work of H.T Transformers rating 250-630 KVA installed in 11/0.4 KV and 33/0.4 KV sub-station at District Rampur.
Work of carriage and replacement of damaged 1 MVA, 630 KVA, 400 KVA, and 250 KVA transformers installed on pump canals under the area of EDD, Sakaldiha.
Increasing capacity of different Distribution Transformers in the area of E.D.D.-I, II, Purwa, Bangarmau, Hasanganj under E.D.C.-UNNAO against Package No.46 TO61/B.P. 2022-23
WORK OF REPAIRING DAMAGED FENCING OF VARIOUS CAPACITY DISTRIBUTION TRANSFORMERS, DIFFERENT LOCATIONS FEEDED FROM VARIOUS 33/11 KV SUB-STATIONS UNDER THE JURISDICTION OF EUDD-I, MORADABAD