Loading…
Loading…
15,058 results • Best match
Testing of 33KV Incoming Breaker and Panel, 33 KV Transformers Breakers and Transformer Panel Protection, 33 KV Incoming/Outgoing Breakers Panel and Complete testing of 5/8/10 MVA Power Transformer installed at various 33/11 KV Substation in the are
Supply of Potential Transformer for Load Loss Test of Transformer as per Technical Specification
Supply of 04 Nos. 60MVA, 220/33kV Power Transformers
REPAIR OF 11/0.250 KV, AL. WOUND DISTRIBUTION TRANSFORMERS OF CAPACITY 10 KVA (Amorphous Core Type)
Replacement of damage transformers in rural area having capacity 160 KVA to 630 KVA in Jethwara Subdivision Under EDD-II Kunda Pratapgarh
Replacement of damage transformers in rural area having capacity 160 KVA to 630 KVA in Kunda Subdivision Under EDD-II Kunda Pratapgarh
Transformer Carriage damaged T/f at 33/11 KV Kasari-Masari sub-division
Transformer Carriage Damaged T/F at 33/11 KV Tagore Town Sub Division
Pipe Earthing of Distribution Transformers in area of EDSD Harriya under EDD Harriya Basti
Pipe Earthing of Distribution Transformers in area of EDSD Babhnan under EDD Harriya Basti
Maintenance of 05 MVA Transformers in 33 KV Substation Khakhapur Under EDD Raniganj Pratapgarh
For Carriage of Transformer trolley from Sub Station to damaged Transformer Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformer, carriage back transformer trolley to Sub-Station under EUDD thakurganj
ForCarriage of Transformer trolley from Sub Station to damaged Transformer Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformer carriage back transformer trolley to Sub-Station under the EUDD-Thakurganj
Overhauling Works Of Generating Transformer, Unit Aux. Transformer and Station Transformer OF UNIT 5, 2x250 MW PTPP, Parichha, Jhansi
Work No 06 Construction of drain from transformer to Masjid Abdul Rehman on Dhabarsi Road in ward number 05
TROLLY MOUNTED TRANSFORMER HAVING CAPACITY 400KVA TRANSFORMER CARRYING AT VARIOUS SUBSTATIONS UNDER EDD I, MAINPURI.
Refer to Tender Description
CENTRIFUGING OF TRANSFORMER OIL OF 132/11 KV 20 MVA TRANSFORMER
Replacement of Damage Transformers in urban area having capacity 10 KVA to 630 KVA in EDSD Town under Electricity Distribution Division-I, Pratapgarh
For the Work of Business Plan 2023-24 Nagar Nigam to Capacity Increasing 11/0.4 KV Distribution Transformers 25/63/250 KVA To 63/100/400 KVA Transformer Due to Overloading Under EUDD-IV, Meerut.
Work of placing damaged 25 KVA to 630 KVA transformers installed in town area under Electricity Distribution Section- Jahangirabad at proper place and transporting new transformer to the site and re-installing it on plinth
Supply of 11/.4 KV 25 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 100 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 25 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer.
Supply of 11/.4 KV 63 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer.
Supply of 11/.4 KV 100 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 25 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 100 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 63 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 25 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 63 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 63 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 25 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer
Supply of 11/.4 KV 100 KVA Distribution Transformers (Level-1 as per amended BIS) with LT Bushing side Busbar Arrangement, External H.T. Fuse Unit and Oil Immersed LT Internal Circuit Breaker for each transformer.
Pipe Earthing of Transformers under EDD Ist Khalilabad.
Replacement of damaged LT Transformers by new repaired Transformers installed at various Places in RAPDRP Noorpur and IPDS Haldaur under EDD-IInd Chandpur.
work related to water level earthing of both the transformers to protect them from damage to 10 MVA power transformers Under EDD Khatauli.
Work of installation of additional transformers, replacement of dilapidated AB cables. Capacity enhancement additional distribution transformers under EDD-II, Mau Additional business plan
Work for Erection of New Plinth for 250/400 KVA Medium Transformers and shifting of transformers and its enerzisation under EDD-I Fatehpur
Supply Of 33 KV Control Panel for Single Transformers without Diff. Relay and 33 KV Control Panel for Double Transformers without Diff. Relay
Installation of 11/0.4 KV distribution transformers and capacity increase of 11/0.4 KV distribution transformers under EDD-Mau in BP 2026-27
Installation of 11/0.4 KV distribution transformers and capacity increase of 11/0.4 KV distribution transformers under EDD-Ghosi in BP 2026-27
Work of installation of replacement transformers following the damage to 250 KVA and 400 KVA Distribution Transformers Under Electricity Distribution Division Phaphamau Prayagraj
For repairing of 10, 25, 63 and 100 KVA Damage Transformers at Workshop Sonbhadra under EWD Mirzapur
For repairing of 160 and 250 KVA Damage Transformers at Workshop Chilbila Dist. Pratapgarh Under EWD Prayagraj.
For repairing of 10, 25, 63 and 100 KVA Damage Transformers at Workshop Sonbhadra under EWD Mirzapur
For Carriage of Transformer trolley from Sub Station to damaged Transformer Plinth/ Four pole/ Double pole and after replacement of damaged transformer by healthy transformer carriage back transformer trolley to S/s under the jurisdiction Thakurganj
For Work of Arresting of oil leakage, reapiring and overhauling of 10 MVA Power Transformer no-1 and 10 MVA Power Transformer No-2 Installed at 33/11 KV S/S Izzatnagar under EDD-II, Bareilly
For repairing of 160 and 250 KVA Damage Transformers at Mirzapur Workshop under EWD Mirzapur
Maintenance work of Power Transformers installed at various 33/11 KV substations under EDC Pratapgarh