Loading…
Loading…
31 live23 closing this weekmost from Energy Department Uttar Pradesh and Paschimanchal Vidyut Vitran Nigam Ltd.
31 results • Best match
Supply and AMC of Drones for Transmission Line Patrolling
Supply of Step Bolts(7.5MT) for Various Transmission Line Towers under the Jurisdiction of TLM Kanp
For the Shifting work of 33 kv 11 kv and LT Lines from chhatra sangh chawk to ambedkar chawk via Hariom nagar Tiraha Distt Gorakhpur
Work Of Modification/Height Raising of 132 KV Double Circuit Agra (4)-Foundry Nagar Transmission line for Metro Rail at Agra, Under ETD-II, Agra
Supply of Decentralized Material for maintenance works under the Jurisdiction of EUDD (Technical) 11 KV and LT Line Network-Moradabad
Transmission Line Package TL02 for construction of 765 kV Lucknow-II-Asana D/c line-Part-I
Construction of Damage 33 KV and 11 KV LT Line Due to Natural Disasters, Storms at different places under EDD, Nanpara
Construction of Damage 33 KV and 11 KV LT Line Due to Natural Disasters, Storms at different places under EDD, Bahraich
Construction of Damage 33 KV and 11 KV LT Line Due to Natural Disasters, Storms at different places under EDD, Kaiserganj
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing and Commissioning etc. for Construction of 132 KV and 220 KV Transmission lines on ACSR Panther/Zebra conductor (approx. 74.11 route Kms) of UPPTCL, on Turnkey basi
SPL REPAIR FOR CONVERSION OF OVER HEAD LT LINE IN UNDER GORUND CABLE AND CONNECTED WRKS AT 07 MECH INF AND ADJOINING AREA UNDER GE BABINA
Construction of 132 KV Transmission lines approx 211.03 route Kms of UPPTCL on Turnkey basis
For the Work of Deducting and Repairing the Fault of Damaged 11 KV Underground Cables Under 11 KV Operation and Maintenance the area of EUDD-11 KV and LT Line-North, Meerut.
Construction of 132 KV Transmission lines on ACSR Panther conductor approx 90 route Kms of UPPTCL on Turnkey basis
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission line; Tower AC; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Tower AC; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132 KV and 220 KV Transmission lines; Electrical System or Installation; Service Provider
Custom Bid for Services - I1016 Shifting, Installation, Testing and Commissioning Work of existing TWFL System installed at POWERGRID 400 kV Varanasi-Bihar Sharif D/c Transmission Line to UPPCL 400 kV Bihar Sharif-Sahupuri D/c Transmission Line Similar Category Operation And Maintenance Of Substation
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132 KV Transmission Line; GPS Survey of 132KV Trasmission line; Service Provider
Internal electrification in C type shop 10 Nos Extention of LT line lighting arrangement and cabling work AT NMY Varanasi
Internal electrification in C type shop 50 Nos Extention of LT line lighting arrangement and cabling work AT NMY Jaunpur
Internal electrification in C type shop 10 Nos Extention of LT line lighting arrangement and cabling work AT NMY Mungrabadshahpur
For providing and fixing of Bright Orange and White Colored Balloon Height Markers on different Transmission Line structures of height above 250 feet within 10 KM radius of Namo Ghat, Varanasi under ETD-III, Varanasi.
Dismantling of 11 KV line and LT Line with its dump at suitable place on site up to completion of work and its safe loading/unloading/weithing carriage from dump site to je's store (including broken STP/PCC Pole)., PCC pole 8.5 Mtr long, PCC pole 11 ... and stringing of ...
Refer to Tender Description
Internal electrification in C type shop 10 Nos B Type shop 10 Nos and distribution and Repairing of LT line painting of pole lighting arrangement and cabling work at NMY Gopiganj
Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing and Commissioning etc. for Construction of LILO of 220 KV Obra(TPS) Rewa Road Ckt I at 220 KV Sarswati Hightech city line on ACSR Zebra conductor
Maintenance of 33, 11 KV and LT line and replacement of cable box of 11 KV and 33 KV XLPE Cable installed at highway rod Crossing and other works in the jurisdiction of EDSD Chuttmalpur under EDD Behat
Maintenance of 33, 11 KV and LT Line and replacement of cable box of 11 KV and 33 KV XPE Cable installed at highway rod crossing and other works in the jurisdiction of EDSD Ghunna under EDD Sarsawa
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - The work Laying Sagging Installation of 11 KV LT line and Other Associate Work under full Deposite Scheme at various place in EUDD Hathras; The work Laying Sagging Insta..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Shifting work of 33 KV Line 11 KV Line LT Line and other equipment against various packages on SemiTurnkey basis in full deposit scheme under the area of EDD Sikandara ..