Loading…
Loading…
2,292 results • Best match
Dust Suppression by Truck Mounted Tankers (Minimum 9/12/15/18 KL capacity ) on Coal Transportation Road at West section and road towards lower Kusmunda patch via WB no.5 at Gevra Project of Gevra Area
Dust suppression by truck mounted tankers of minimum 9000 ltr. Capacity each with using mist spray arrangement on coal transportation road from Dipka Chowk to Hardi bazaar/Rampur/ Newsa road at Gevra Project of Gevra Area
Laying, jointing, transportation, flange welding, dismantling /rearrangement of 6 inch dia Pipes for dewatering purpose with dismantling, shifting and installation of Pump set including supply of different sizes of Valves for 01 year at Jampali OCM
Laying ,jointing ,transportation ,flange welding ,dismantling /rearrangement of 6 inch dia pipes for dewatering purpose with dismantling ,shifting and installation of pump set including supply of different sizes of Valves and flexible hoses for a pe
Construction of 3 Nos. Sub Station and 90mm Cable transportation from surface to UG Substation and laying from UG Sub Station to as per requirement panel for LHCM at 10B (Top) Seam of Haldibari UG Mine.
Dust suppression by truck mounted tankers(Minimum 9/12/15/18 KL capacity) on coal transportation road at west section and road towards lower kusmunda patch via WB no. 5 at Gevra Project of Gevra area.
Annual maintenance contract for the work of laying ,jointing ,transportation ,flange welding ,dismantling /rearrangement of 6 inch dia pipes for dewatering purpose with dismantling ,shifting and installation of pump set for 01 Year at Jampali OCM
Dust suppression by truck mounted tankers (9/12/15/18 KL Capacity) on coal transportation roads of Amgaon Patch of Gevra Project of Gevra Area. (Scope of work under dust suppression by mobile water tankers enclosed.)
Dust suppression by Truck Mounted Tankers (Minimum 9/12/15/18 KL Capacity)on coal transportation road from CISF barrier 4,5 of helipad barrier towards Laxman new TRS (Near Mangaon)at Gevra Project of Gevra Area.
Hiring of loading equipments and tippers at coal transportation from faces to surface stock with minimum TPD of 16,446 Te per day for 124,00,000 Te for 754 days at Gare Palma IV/2and3 OCM Raigarh Area
Permanent sprinkler arrangement on coal transportation road from Erection yard towards TRS and from old Hardi bazar road junction (WB no.5) to Inpit belt crossing near FB-12 at Dipka Expansion Project of Dipka Area
Assistance for day to day miscellaneous cleaning and transporting work by mechanical means (by JCB and Hywa) for removal of earth and spillage materials in CHP Area and Coal Transportation Road at KOCP. (For one year)
Supplying stacking and laying of stone materials including transportation and laying at various places of coal tipper road/ approach roads including Workshop No. (3) and road sale weigh bridges at KOCP of Kusmunda Area. (Re-tender)
Hiring of Pay loaders, Tippers and Mobile Crusher for loading, transportation to different location and crushing of ROM Coal at surface stock heap no28 of Kusmunda OCP of Kusmunda Area as detailed in NIT/e-tender notice.
Transportation, laying, charging of different size armoured cable from surface to underground or from old district to new district or vice versa for a lead of 100M at Rajgamar 6 and 7 incline of Rajgamar Sub Area.
Dismantling, transportation and Installation of (1000mm size) tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to New depillaring panel no. 27D
Dust Suppression by Truck Mounted Tankers(Minimum 9/12/15/18 KL capacity) on Coal Transportation Roads to Naraibodh face at Gevra Project of Gevra Area.(Scope of work under dust suppression by mobile water tanker enclosed)
Shifting of 1000 GPM pump set with electrical motor, starter ,switches, pipes valves ets. unreeling, loading on trolley transportation and unloading and laying,hanging of 50Sq.mm PVC armored power cable, transporting, laying and joing of 6inch pipe
(A)(i) Construction of temperory Reserve station, first aid station, fire fighting station, Material yard and miners staion at 96LE, 96LW, 101LW and 84D district in every 100m interval (ii) Transportation, laying charging and extension of 70mm2
Hiring of HEMM for excavating 3,36,26,181 cuM all strata loading, transportation unloading of excavated materials dumping dozing scrapping preparation maintenance of haul road etc and Vertical Ripper machines at Dipka OC as detailed in NIT and BOQ.
Hiring of Vertical Ripper machines and HEMM for excavating all strata loading, transportation and unloading of excavated materials dumping dozing scrapping preparation maintenance of haul road, water sprinkling at Gevra OC, as detailed in NIT and BOQ
Dismantling, transportation and Installation of (1000mm size) Tail end drum, drum base, tail end guard, side plate/loading brackets (chute), decking plates and belt structure, belt conveyor from old district/surface to new depillaring panel no. -6D,
Transportation and installation of 1000 GPM pumps with motor and 6 inch Delivery pipeline in seam-1 (Top Seam) and Seam-0 (BottomSeam) in Gayatri UG Mine of Bishrampur Area at Gayatri UG Mine of Bishrampur Area.
Hiring of Vertical Ripper machines and HEMM for excavating all strata loading, transportation and unloading of excavated materials dumping dozing scrapping preparation maintenance of haul road, water sprinkling at Dipka OC, as detailed in NIT and BOQ
Manual cleaning of slush, muck, loose earth, coal slurry etc. from pucca drains, road side berms, cross drains, cleaning of chocked hume pipes in and around CHP, Coal Transportation Road during monsoon at KOCP of Kusmunda Area.
Fabrication of drive head, loop take up, discharge and tail end base plate structure, transportation , installation of 800/1000mm 02 Nos belt conveyor of 500mtr and 200mtrs length in Underground of Jhilimili Mine of Jhilimili Sub Area
Construction of 04 numbers RCC retaining wall around 54L/8D and transportation and installation of HT pump motor starter with laying of 6 inch dia pipe line 67L/0D sump to 54L/8D at Singhali UG Mine.
Custom Bid for Services - Excavation loading Transportation and unloading of Pond ash from PP2 ash dyke to Low Lying area near Utkal Chowk Ward no40 Village Purena Distance From PPII dyke to ash unloading area is 55Km
Goods Transportation service - Monthly Based Service - Outside city within state; Hiring of Truck capacity 9 MT 01 nos for Bhilai OHE depot for Day to Day work Maintenance and Attending Breakdown for 2 years; Open Body Taurus
Transportation Contract for 0-50 KM slab for Excavation, loading of Pond Ash from NTPC Khargone Ash Dyke, transporting and unloading at construction site of road projects of NHAI and other Central or State Government road construction department / Au
Digging, collecting, cleaning and loading into tractor trolley by hydraulic excavator (JCB) at near and around crushing point/C-6 discharge point and transportation upto CHP bunkers and unloading the same into bunkers within 1.000km from crushing
Custom Bid for Services - Transportation and unloading of pond ash or fly ash from Dyke or Silo of Lara STPP Ash to Bishrampur Open Cast Mine, Custom Bid for Services - Excavation and Loading of ash, Custom Bid for Services - Levelling dressing and Spreading of the transported ash, Custom Bid for Services - Providing and laying earth cover
Handling, Transport and Other Mining Services - Percentage quote based - Stone dusting spreading of stone dust in ug galleries along all haulage travelling And belt roadways in Katkona 1and2 incline
Dismantling of drive head and belt conveyors from 1LW panel then transportation and installation / extension of drive head and belt conveyor with accessories and marching of SDL, UDM, Radient, salvaging of GEB, ACB, VCB, transformer, cables pipes etc
Dust suppression on coal transportation road by mechanical means i.e. by truck mounted tankers from No. 12 feeder breaker to auto section road junction and in and around WB No. 1 and 8 at DEP of Dipka area
Laying, jointing, transportation ,flange welding, providing and fixing of Valves and dismantling / rearrangement of 6 inch and 4 inch Dia MS Pipes with Fire Fighting accessories for different locations of Coal Stocks for 02 Years at Baroud OCM
TECHNICAL BIDS ARE INVITED FOR PREQUALIFICATION OF HANDLING AND TRANSPORT CONTRACTORS FOR 24 (TWENTY FOUR) MONTHS, ALONG WITH PRICE BIDS FOR LINING UP OF HANDLING AT KHARSIA RAKE POINT/WAREHOUSE AND TRANSPORTATION TO VARIOUS DESTINATIONS OF RAIGARH D
NIT FOR PREQUALIFICATION OF HANDLING AND TRANSPORT CONTRACTORS FOR 24 MONTHS, ALONG WITH PRICE BIDS FOR LINING UP OF HANDLING AT BALOD RAKE POINT/WAREHOUSE AND TRANSPORTATION TO VARIOUS DESTINATIONS OF BALOD DISTRICT AND OTHER DESTINATIONS OF CHATTIS
Excavation, Transportation, stacking, Filling of cracks by incombustible material from Rajnagar O/C Mine to over old UG goaved out panel no. 8, 1A,1B, 1C, 1D, 1E of 7A seam at Jhiria UG Mine of Hasdeo Area
Hiring of HEMM for OB removal including transportation and other allied activities as detailed in NIT and BOQ at Baroud OCM, Raigarh Area, Tehsil Gharghoda, Dist Raigarh, CG Total quantity 55.26 L.Cum for 503 days at 11,183 CuPD
Providing and fixing of Height Guage and making alternate road for HEMM at crossing point of elevated conveyor C/9-10 and C/13-14 of new road CHP Phase-II and existing coal transportation road at KOCP.
Digging, collecting, cleaning and loading into tractor trolley by hydraulic excavator (JCB) at near and around crushing point/C6 discharge point and transportation upto CHP Bunker and unloading the same into bunker within 1.0Km from crushing point a
Transportation, laying and charging of armored cable and 02 nos. pump, motor and starter from surface to UG or old panel no. 12LS and 17LS to CM panel 27R dep. Distt. of 4A seam at Haldibari UG Mine.
Supply of road construction material for maintenance of various coal transportation roads during monsoon at west part of mine , Amagaon patch, L andT bunker premises and road sale roads of old Dipka unit at Gevra Project of Gevra Area.
Dust suppression by Truck mounted Tankers (9000 ltr. Capacity) on coal Transportation Road of helipad barrier (4 and 5) to road sale truck parking area and towards Shakti Nagar CISF barrier under Gevra Project of Gevra Area.(2nd Call)
Supervision and quality control services for Construction of 09 (Nine) Nos. of Cement Concrete Coal Transportation Road and 02 (two) Nos. of Cement Concrete Platform, consisting of total length of 11.40 Km including drain, retaining wall etc., at Dip
(i) Erection of temporary stopping by old reject conveyor belt in 30LS LHCM Panel (ii) Cleaning and removal of malma along return roadway of 30LS panel (iii) Transportation, laying, charging of armoured cable from old disst. to new disst.
Hiring of Pay loaders, Tippers and Mobile Crushers for coal crushing, loading and transportation for a total quantity of 49.27 L.Te for a period of 1095 days at Chirimiri OC of Chirimiri Area as detailed n NIT and BOQ.
Digging, colleting, cleaning and loading into tractor trolly by hydraulic excavator (JCB) at near and around crushing point/C6 discharge point and transportation up to CHP Bunker and unloading the same into bunker within 1.0km from crushing point at
Laying, Jointing, transportation, flange welding, dismantling/rearrangement of 6 inch dia MS/GI Pipes for dewatering purpose with dismantling, shifting and installation of Pump set for a period of one year/ 365 Days at Jampali OCM, SECL, Raigarh Area